Innovating Works
JTI-CS2-2015-CFP02-AIR-01-14
Technology evaluation of immersive technologies for in-flight app...
Specific Challenge:The activities shall evaluate the use of immersive technologies (Virtual Reality and Augmented Reality) for passengers and cabin crew during flight operation. Key areas are the impacts on the well-being of passengers and crew as well as evaluating potential technology solutions and applications for ancillary revenue generation and operational efficiency. Please refer to the full and formal topic descriptions published in this call.
Sólo fondo perdido 0 €
European
This call is closed This line is already closed so you can't apply. It closed last day 18-11-2015.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Luckily, we have achieved the list of financed projects!
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos: project objective:

Specific Challenge:The activities shall evaluate the use of immersive technologies (Virtual Reality and Augmented Reality) for passengers and cabin crew during flight operation. Key areas are the impacts on the well-being of passengers and crew as well as evaluating potential technology solutions and applications for ancillary revenue generation and operational efficiency. Please refer to the full and formal topic descriptions published in this call.


Temáticas Obligatorias del proyecto: Temática principal:

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño por participante: Duración:
Requisitos técnicos: Specific Challenge:The activities shall evaluate the use of immersive technologies (Virtual Reality and Augmented Reality) for passengers and cabin crew during flight operation. Key areas are the impacts on the well-being of passengers and crew as well as evaluating potential technology solutions and applications for ancillary revenue generation and operational efficiency. Please refer to the full and formal topic descriptions published in this call. Specific Challenge:The activities shall evaluate the use of immersive technologies (Virtual Reality and Augmented Reality) for passengers and cabin crew during flight operation. Key areas are the impacts on the well-being of passengers and crew as well as evaluating potential technology solutions and applications for ancillary revenue generation and operational efficiency. Please refer to the full and formal topic descriptions published in this call.
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in Part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
 
Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
3.2 Submission and evaluation process:
       described in the Clean Sky 2 Rules for submission, evaluation, selection, award and review procedures of calls for proposals
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Indicative timetable for evaluation and grant agreement: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates for the type(s) of action(s) under this call: 
Proposal templates are accessed via the proposal submission system (SEP).
 
 Additional provisions:
Clean Sky 2 Budget Flexibility:
see Part G of the General Annexes of the Clean Sky 2 JU Work Plan 2014-2015.
 
JTIs additional documents:
Clean Sky 2 Joint Technical Programme...
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in Part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
 
Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
3.2 Submission and evaluation process:
       described in the Clean Sky 2 Rules for submission, evaluation, selection, award and review procedures of calls for proposals
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Indicative timetable for evaluation and grant agreement: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates for the type(s) of action(s) under this call: 
Proposal templates are accessed via the proposal submission system (SEP).
 
 Additional provisions:
Clean Sky 2 Budget Flexibility:
see Part G of the General Annexes of the Clean Sky 2 JU Work Plan 2014-2015.
 
JTIs additional documents:
Clean Sky 2 Joint Technical Programme
Clean Sky 2 JU Financial Rules
Clean Sky 2 JU – Regulation of establishment
 
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
We do not know the total budget of the line
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-CS2-CFP02-2015-01 Technology evaluation of immersive technologies for in-flight applications Specific Challenge:The activities shall evaluate the use of immersive technologies (Virtual Reality and Augmented Reality) for passengers an...
Sin info.
JTI-CS2-2015-CFP02-AIR-02-13 Prototype Manufacturing Tooling for Single Parts Manufacturing of the Rotorless tail for LifeRCraft.
en consorcio: Specific Challenge:The aim of this Call for Partner is to develop, design, manufacture and deliver to the CoP of the CfCP AIR-02-02, the pro...
Cerrada does 9 years | next call scheduled for the month of
JTI-CS2-2015-CFP02-AIR-02-09 HVDC Electrical Power Conversion and Distribution System Development
en consorcio: Specific Challenge:A new electrical power conversion and distribution system more efficient and reliable is needed as the dependence on elec...
Cerrada does 9 years | next call scheduled for the month of
JTI-CS2-2015-CFP02-AIR-01-12 Tool-Part-Interaction simulation process linked to laminate quality
en consorcio: Specific Challenge:Highly integrated composite structures require complex tooling with increasing physical and geometrical complexity. Facto...
Cerrada does 9 years | next call scheduled for the month of
JTI-CS2-2015-CFP02-AIR-02-16 Process development for composite frames manufacturing with high production rate and low cost
en consorcio: Specific Challenge:The Topic shall contribute to the development and validation of an advanced process for manufacturing regional aircraft c...
Cerrada does 9 years | next call scheduled for the month of
JTI-CS2-2015-CFP02-AIR-02-15 Design Against Distortion: Part distortion prediction, design for minimized distortion, carbon-epoxy aerospace parts
en consorcio: Specific Challenge:Develop rapid distortion prediction methods for curing of carbon-epoxy. Develop methods & tools for shape- and layup...
Cerrada does 9 years | next call scheduled for the month of