Innovating Works
EE-10-2016
EE-10-2016: Supporting accelerated and cost-effective deep renovation of buildings through Public Private Partnership (EeB PPP)
Specific Challenge:Too much of Europe's building stock is inefficient in terms of energy use, with excessive heat losses through building envelopes and technical building systems. In addition, buildings need to contribute a greater share of renewable energy production. Too few buildings are undergoing deep renovation (whereby energy savings exceed 60% compared to pre-renovation levels) and such renovations are often too expensive. There is a need to demonstrate more cost-effective and practical ways of achieving deep renovation while reducing the time needed to renovate a building and at the same time promoting a holistic optimized approach that goes beyond the results of European and national projects, and the IEA report on Prefabricated Systems for Low Energy Renovation of Residential Buildings.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 21-01-2016.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:Too much of Europe's building stock is inefficient in terms of energy use, with excessive heat losses through building envelopes and technical building systems. In addition, buildings need to contribute a greater share of renewable energy production. Too few buildings are undergoing deep renovation (whereby energy savings exceed 60% compared to pre-renovation levels) and such renovations are often too expensive. There is a need to demonstrate more cost-effective and practical ways of achieving deep renovation while reducing the time needed to renovate a building and at the same time promoting a holistic optimized approach that goes beyond the results of European and national projects, and the IEA report on Prefabricated Systems for Low Energy Renovation of Residential Buildings.


Scope:Proposals should demonstrate and promote innovative processes leading in practice to more cost-effective, higher quality, holistic and faster deep renovation of buildings with less disturbance of the residents. Proposals should demonstrate the contribution to an increased rate of renovation in a specific district/city/region. The building renovations may use... ver más

Specific Challenge:Too much of Europe's building stock is inefficient in terms of energy use, with excessive heat losses through building envelopes and technical building systems. In addition, buildings need to contribute a greater share of renewable energy production. Too few buildings are undergoing deep renovation (whereby energy savings exceed 60% compared to pre-renovation levels) and such renovations are often too expensive. There is a need to demonstrate more cost-effective and practical ways of achieving deep renovation while reducing the time needed to renovate a building and at the same time promoting a holistic optimized approach that goes beyond the results of European and national projects, and the IEA report on Prefabricated Systems for Low Energy Renovation of Residential Buildings.


Scope:Proposals should demonstrate and promote innovative processes leading in practice to more cost-effective, higher quality, holistic and faster deep renovation of buildings with less disturbance of the residents. Proposals should demonstrate the contribution to an increased rate of renovation in a specific district/city/region. The building renovations may use pre-fabricated mass manufactured components or "plug and play" energy and ventilation systems, including innovations needed during the on-site phase. Proposals should consider innovative integrated packages of commercially available technologies. This typically includes actions on the building envelope and on the technical building systems both including renewable energy sources and conversion and storage technologies, in order to achieve very high energy performance. The proposals could include specific solutions for historic buildings, when applicable. Means of sharing technical information on the building over its whole life cycle could also be considered[1]. Proposals should ensure that the solutions guarantee high indoor environmental quality (thermal and visual comfort, acoustics, air quality, etc.). If necessary proposals should include smart controls to allow integration with the energy grid. Embodied energy and the possibility of reusing and recycling materials at the end of a building's life are highly relevant to the building's overall life cycle, therefore these aspects should also be taken into account.

Solutions should demonstrate the integration potential of innovative processes and explore how they could facilitate renovation. Proposals could make use of geo-clusters[2] to respond to specific needs and to demonstrate the potential for replication.

Synergies may be considered with activities initiated under the topic LCE-17-2017.

The Commission considers that proposals requesting a contribution from the EU of between EUR 3 and 4 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

This topic will be implemented under the PPP on Energy-efficient Buildings. The activities are expected to be implemented at Technology Readiness Level (TRL) 6-8 (please see part G of the General Annexes). Proposers should note that this topic is also complemented by other topics relating to deep renovation, including in the PPP on Energy Efficient Buildings.


Expected Impact:Proposals are expected to demonstrate the impacts listed below, using quantified indicators and targets wherever possible:

Net primary energy use reduced by 60% compared to pre-renovation levels; Cost reduction of at least 15% compared with a typical renovation (i.e. a renovation that meets current minimum requirements of existing building regulations[3]); Demonstration of the effectiveness of the proposed solutions to reach an increased rate of renovation of a defined building typology in a specific district/city/region. Reduction in time needed for renovation by a factor of 2 at least compared to typical present day renovation.
Cross-cutting Priorities:Contractual Public-Private Partnerships (cPPPs)EeB


[1]The use of BIM (Building Information Modelling) for documenting and sharing technical information on the building over its whole life cycle.

[2]Geo-cluster is understood as a group of districts, cities, regions or large areas of the EU (may be even covering several MS) with similar characteristics, e.g. climate, building typology, technology, market barriers, etc.

[3]Definition of typical renovation is based on each country’s implementation of Art. 4 of the EPBD

ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:Too much of Europe's building stock is inefficient in terms of energy use, with excessive heat losses through building envelopes and technical building systems. In addition, buildings need to contribute a greater share of renewable energy production. Too few buildings are undergoing deep renovation (whereby energy savings exceed 60% compared to pre-renovation levels) and such renovations are often too expensive. There is a need to demonstrate more cost-effective and practical ways of achieving deep renovation while reducing the time needed to renovate a building and at the same time promoting a holistic optimized approach that goes beyond the results of European and national projects, and the IEA report on Prefabricated Systems for Low Energy Renovation of Residential Buildings. Specific Challenge:Too much of Europe's building stock is inefficient in terms of energy use, with excessive heat losses through building envelopes and technical building systems. In addition, buildings need to contribute a greater share of renewable energy production. Too few buildings are undergoing deep renovation (whereby energy savings exceed 60% compared to pre-renovation levels) and such renovations are often too expensive. There is a need to demonstrate more cost-effective and practical ways of achieving deep renovation while reducing the time needed to renovate a building and at the same time promoting a holistic optimized approach that goes beyond the results of European and national projects, and the IEA report on Prefabricated Systems for Low Energy Renovation of Residential Buildings.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
 
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects (follow the links to China, Japan, Republic of Korea, Mexico, Russia, Taiwan).
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme
3.2 Submission and evaluation process: Guide to the submission and evaluation process
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:...
Please read carefully all provisions below before the preparation of your application.
 
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects (follow the links to China, Japan, Republic of Korea, Mexico, Russia, Taiwan).
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme
3.2 Submission and evaluation process: Guide to the submission and evaluation process
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Innovation Action:
Specific provisions and funding rates
Standard proposal template
Standard evaluation form
H2020 General MGA -Multi-Beneficiary
Annotated Grant Agreement
 
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
 
Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
 
Additional documents:
H2020 Work Programme 2016-17: Introduction
H2020 Work Programme 2016-17: Secure, clean and efficient energy
H2020 Work Programme 2016-17: Dissemination, Exploitation and Evaluation
H2020 Work Programme 2016-17: General Annexes
Legal basis: Horizon 2020 - Regulation of Establishment
Legal basis: Horizon 2020 Rules for Participation
Legal basis: Horizon 2020 Specific Programme 
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-EE-2016-2017 Supporting accelerated and cost-effective deep renovation of buildings through Public Private Partnership (EeB PPP) Specific Challenge:Too much of Europe's building stock is inefficient in terms of energy use, with excessive heat losses through building en...
Sin info.
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2022-SEE-01 Sustainable growth and building resilience in tourism – empowering SMEs to carry out the twin transition
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 9 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2023-EENEE-01 Enterprise Europe Network Energy Efficiency Action
en consorcio:
Cerrada hace 9 meses | Próxima convocatoria prevista para el mes de