Innovating Works
HORIZON-CL5-2022-D4-01-03
Smarter buildings for better energy performance
ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:
Sólo fondo perdido 0 €
European
This call is closed Esta línea ya está cerrada por lo que no puedes aplicar.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos:

ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:

More innovative, affordable, user-friendly and accessible products and systems to continuously monitor and improve the energy performance of buildings.Increased building energy performance through the optimisation and integration of different technologies, including renewable energy and storage, and services.Easier and more systematic use smart products and services to achieve savings where energy renovation is not an option.Higher replicability to increase number of buildings with smart building devices and digital infrastructure resulting in a higher smart readiness rating.
Scope:Improvement and cost-reduction of technologies to predict, assess, monitor and control in real time the energy performance of buildings, including energy efficiency, renewables, storage and their optimisation.

The proposal should:

Develop new or enhance existing solutions for interoperability of systems, including between building automation and control systems (BACS) and other technical building systems and devices (including IoT ones), as well as between b... see more

ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:

More innovative, affordable, user-friendly and accessible products and systems to continuously monitor and improve the energy performance of buildings.Increased building energy performance through the optimisation and integration of different technologies, including renewable energy and storage, and services.Easier and more systematic use smart products and services to achieve savings where energy renovation is not an option.Higher replicability to increase number of buildings with smart building devices and digital infrastructure resulting in a higher smart readiness rating.
Scope:Improvement and cost-reduction of technologies to predict, assess, monitor and control in real time the energy performance of buildings, including energy efficiency, renewables, storage and their optimisation.

The proposal should:

Develop new or enhance existing solutions for interoperability of systems, including between building automation and control systems (BACS) and other technical building systems and devices (including IoT ones), as well as between buildings and the grid.Investigate innovative approaches to ensure high level of security and privacy by design in buildings.Investigate approaches to reduce costs of systems allowing the integration of energy efficiency, renewables, storage and their optimisation.On the basis of the above, demonstrate the potential for energy savings from energy management solutions based on smart technical building systems (predictive controllers, smart thermostats, active sensors, smart lighting, etc.).Assess the contribution of proposed solutions to the enhancement of smart readiness of buildings as rated by the smart readiness indicator under Directive 2010/31/EU.Demonstrate that the developed solutions are user-friendly and ensure the desired indoor environment quality and user satisfaction.Where possible, demonstrate that such solutions can build flexibly on services/products not originally intended for energy management (e.g. a smart home system).Seek to ensure from the design phase that the project is developed with a view to integrate its results/deliverables under a digital building logbook. Each project is expected to include at least three demonstration sites located in different climatic regions.

Clustering and cooperation with other relevant projects is strongly encouraged; in particular, liaison and synergies with the European Partnership on ‘People-centric sustainable built environment’.


Specific Topic Conditions:Activities are expected to achieve TRL 8 by the end of the project – see General Annex B.




Cross-cutting Priorities:Digital AgendaArtificial Intelligence


see less

Temáticas Obligatorias del proyecto: Temática principal: Artificial Intelligence Energy efficiency - general Energy efficient buildings Digital Agenda Renewable energy sources - general Energy fuels and petroleum engineering

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño por participante: Duración:
Requisitos técnicos: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes:
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Expenses related to personnel working directly on the project are based on actual hours spent, based on company costs, and fixed ratios for certain employees, such as the company's owners.
Subcontracting costs.
Payments to external third parties to perform specific tasks that cannot be performed by the project beneficiaries.
Purchase costs.
They include the acquisition of equipment, amortization, material, licenses or other goods and services necessary for the execution of the project
Other cost categories.
Miscellaneous expenses such as financial costs, audit certificates or participation in events not covered by other categories
Indirect costs.
Overhead costs not directly assignable to the project (such as electricity, rent, or office space), calculated as a fixed 25% of eligible direct costs (excluding subcontracting).
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 6:. Se cuenta con prototipos piloto capaces de desarrollar todas las funciones necesarias dentro de un sistema determinado, habiendo superado pruebas de factibilidad en condiciones de operación o funcionamiento real. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
For the eligible budget, the intensity of the aid in the form of a lost fund may reach From a 70% up to a 100%.
The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities. The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities.
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda no tiene efecto incentivador. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
We do not know the total budget of the line
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
HORIZON-CL5-2022-D4-01 Smarter buildings for better energy performance ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: More innovative, affordable, user-fri...
Sin info.
HORIZON-CL5-2022-D4-01-05 Development of high temperature thermal storage for industrial applications
en consorcio: ExpectedOutcome:Project results are expected to contribute to all the following expected outcomes: Short term (intraday or a couple of days...
Cerrada | next call scheduled for the month of
HORIZON-CL5-2022-D4-01-04 Development and pilot demonstration of heat upgrade technologies with supply temperature in the range 150-250°C
en consorcio: ExpectedOutcome:Project results are expected to contribute to all the following expected outcomes: Validate the technical feasibility of in...
Cerrada | next call scheduled for the month of
HORIZON-CL5-2022-D4-01-01 Demand response in energy-efficient residential buildings
en consorcio: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: Increased potential benefits, trust a...
Cerrada | next call scheduled for the month of
HORIZON-CL5-2022-D4-01-02 Renewable-intensive, energy positive homes
en consorcio: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: Faster transition to the next generat...
Cerrada | next call scheduled for the month of
HORIZON-CL5-2022-D4-01-03 Smarter buildings for better energy performance
en consorcio: ExpectedOutcome:Project results are expected to contribute to all of the following expected outcomes: More innovative, affordable, user-fri...
Cerrada | next call scheduled for the month of