Innovating Works
NMP-17-2014
NMP-17-2014: Post-lithium ion batteries for electric automotive applications
Scope:Specific challenge: The electrification of road transport is a key towards sustainable and environmentally friendly mobility of persons and transport of goods, in particular for short range transport and transport in urban areas.  In order to reach this goal it is important to develop improved cost competitive and sustainable storage technologies for Electrified Vehicles (EV) achieving significantly improved performance with respect to current lithium-ion electrochemical storage technology, to allow the production of EVs that more closely match the performance of current internal combustion vehicles (e.g. and in particular considering the driving range). This challenge is complementary to a separate one present in the “Transport Challenges” Work Programme.[1] This is also in line with the Roadmap of the European Green Vehicle Initiative (EGVI). Research and innovation should build on the progress already obtained through previous projects, particularly those funded within the Green Car Public Private Partnership. It is however important for the European competitiveness that the next generation of batteries will be “made”, i.e. developed and produced in Europe.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 07-10-2014.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Specific challenge: The electrification of road transport is a key towards sustainable and environmentally friendly mobility of persons and transport of goods, in particular for short range transport and transport in urban areas.  In order to reach this goal it is important to develop improved cost competitive and sustainable storage technologies for Electrified Vehicles (EV) achieving significantly improved performance with respect to current lithium-ion electrochemical storage technology, to allow the production of EVs that more closely match the performance of current internal combustion vehicles (e.g. and in particular considering the driving range). This challenge is complementary to a separate one present in the “Transport Challenges” Work Programme.[1] This is also in line with the Roadmap of the European Green Vehicle Initiative (EGVI). Research and innovation should build on the progress already obtained through previous projects, particularly those funded within the Green Car Public Private Partnership. It is however important for the European competitiveness that the next generation of batteries will be “made”, i.e. developed and produced in Europe.

Sc... ver más

Scope:Specific challenge: The electrification of road transport is a key towards sustainable and environmentally friendly mobility of persons and transport of goods, in particular for short range transport and transport in urban areas.  In order to reach this goal it is important to develop improved cost competitive and sustainable storage technologies for Electrified Vehicles (EV) achieving significantly improved performance with respect to current lithium-ion electrochemical storage technology, to allow the production of EVs that more closely match the performance of current internal combustion vehicles (e.g. and in particular considering the driving range). This challenge is complementary to a separate one present in the “Transport Challenges” Work Programme.[1] This is also in line with the Roadmap of the European Green Vehicle Initiative (EGVI). Research and innovation should build on the progress already obtained through previous projects, particularly those funded within the Green Car Public Private Partnership. It is however important for the European competitiveness that the next generation of batteries will be “made”, i.e. developed and produced in Europe.

Scope: To achieve progress well beyond current lithium-ion cell technologies, various key factors have to be improved at the same time, such as: energy density, power density, the ability to work under severe thermal conditions, charging speed, and inherent safety of the battery cells including crash and abuse conditions. And the ageing of the new chemistries has to be thoroughly understood and improved, in order to achieve a longer battery lifetime. In addition, the future battery has to have a competitive cost; it has also to be produced in an environmental friendly way, considering the availability of raw materials and the batteries’ recycling potential, as well as a sound life cycle assessment. And the knowledge on production-technology and -capacity of cells, packs and systems should be made available. The scope may be reached e.g. by addressing new chemistries that allow high-energy densities, and by developing related specific new materials e.g. for cathodes and electrolytes. In order to accelerate the industrial take-up of the proposed solution, the development of prototypes should be included to show clear progress beyond existing post lithium-ion technology in terms of durability, cyclability and energy density, with consideration of scalability up to full scale for automotive applications.

Activities expected to focus on Technology Readiness Level 4.

The Commission considers that proposals requesting a contribution from the EU between EUR 6 and 8 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

Expected impact:

                Significant improvements of the usability of EVs, with extended driving range and improved battery durability (recharging, cyclability and safety) obtainable at competitive costs. The energy density of the proposed new batteries should reach at least twice the energy density in comparison to the best in class Li-Ion technology at the same power density;

                Better acceptance of EV in society, and thus contribution to the improvements of sustainable transport, reducing pollution and noise in urban areas;

                European competitiveness through development of new key technology and related production capacities.

Type of action: Research and Innovation Actions

[1] GV 1-2014 “Next generation of competitive lithium ion batteries to meet customer expectations”


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Specific challenge: The electrification of road transport is a key towards sustainable and environmentally friendly mobility of persons and transport of goods, in particular for short range transport and transport in urban areas.  In order to reach this goal it is important to develop improved cost competitive and sustainable storage technologies for Electrified Vehicles (EV) achieving significantly improved performance with respect to current lithium-ion electrochemical storage technology, to allow the production of EVs that more closely match the performance of current internal combustion vehicles (e.g. and in particular considering the driving range). This challenge is complementary to a separate one present in the “Transport Challenges” Work Programme.[1] This is also in line with the Roadmap of the European Green Vehicle Initiative (EGVI). Research and innovation should build on the progress already obtained through previous projects, particularly those funded within the Green Car Public Private Partnership. It is however important for the European competitiveness that the next generation of batteries will be “made”, i.e. developed and produced in Europe. Scope:Specific challenge: The electrification of road transport is a key towards sustainable and environmentally friendly mobility of persons and transport of goods, in particular for short range transport and transport in urban areas.  In order to reach this goal it is important to develop improved cost competitive and sustainable storage technologies for Electrified Vehicles (EV) achieving significantly improved performance with respect to current lithium-ion electrochemical storage technology, to allow the production of EVs that more closely match the performance of current internal combustion vehicles (e.g. and in particular considering the driving range). This challenge is complementary to a separate one present in the “Transport Challenges” Work Programme.[1] This is also in line with the Roadmap of the European Green Vehicle Initiative (EGVI). Research and innovation should build on the progress already obtained through previous projects, particularly those funded within the Green Car Public Private Partnership. It is however important for the European competitiveness that the next generation of batteries will be “made”, i.e. developed and produced in Europe.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
 
EVALUATION
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme, with the following exceptions:
For single-stage and second-stage evaluations, the threshold for the criteria Excellence and Impact will be 4. The overall threshold, applying to the sum of the three individual scores, will be 12.
In case of equal overall scores in the ranked list, the priority order of proposals will be established in accordance with part H of the General Annexes, except that proposals will be ranked on the basis of individual scores for the Impact criterion before the Excellence criterion.
3.2 Guide to the submission and evaluation process
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of inform...
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
 
EVALUATION
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme, with the following exceptions:
For single-stage and second-stage evaluations, the threshold for the criteria Excellence and Impact will be 4. The overall threshold, applying to the sum of the three individual scores, will be 12.
In case of equal overall scores in the ranked list, the priority order of proposals will be established in accordance with part H of the General Annexes, except that proposals will be ranked on the basis of individual scores for the Impact criterion before the Excellence criterion.
3.2 Guide to the submission and evaluation process
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Research and Innovation Action:
Specific provisions and funding rates
Standard proposal template (administrative forms and structure of technical annex)
Standard evaluation form
Annotated Model Grant Agreement
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
 
Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved. 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-NMP-2014-2015 Post-lithium ion batteries for electric automotive applications Scope:Specific challenge: The electrification of road transport is a key towards sustainable and environmentally friendly mobility of person...
Sin info.
NMP-06-2015 Novel nanomatrices and nanocapsules
en consorcio: Scope:Specific challenge: Encapsulation technologies have been widely used for a long time in the pharmaceutical industry for drug delivery...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
NMP-12-2015 Biomaterials for treatment and prevention of Alzheimer's disease
en consorcio: Scope:Specific challenge: An estimated 7.3 million Europeans between 30 and 99 years of age suffered from different types of dementias in th...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
NMP-30-2015 Next generation tools for risk governance of nanomaterials
en consorcio: Scope:Specific challenge: The conventional risk assessment approach, i.e. deriving no-effect levels or limit values from dose-effect relatio...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
NMP-02-2015 Integration of novel nano materials into existing production lines
en consorcio: Scope:Specific challenge: Nanomaterials are intended to improve the performance of existing production technologies, and to give new functio...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
NMP-03-2015 Manufacturing and control of nanoporous materials
en consorcio: Scope:Specific challenge: There is a constantly growing interest in nanostructured porous materials, thanks to the many applications that ca...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de