Innovating Works
LC-SC3-EE-15-2018
LC-SC3-EE-15-2018: New energy label driving and boosting innovation in products energy efficiency
Specific Challenge:The energy label is a key driver for innovation in the energy efficiency area. For more than 20 years the tangible results of the transformation of the European market are being observed, where only the products with the highest energy efficiency parameters and innovative solutions to save energy are being commercialised. The energy label stimulates a real competition in innovation among product manufacturers. However the current energy label has a closed scale from A+++ to D, so once the majority of products reach the highest classes, the label no longer stimulates further innovation. Therefore, the Commission has proposed that, in future, labels will be 'rescaled' (as well as go back to A-G scale), i.e. existing products will be re-categorised in lower classes so that the top classes are empty and provide new stimulus for innovation. The ‘empty top-class’ label will be the strongest and continuous innovation trigger. Rescaling of labels would take place approximately every ten years or faster, if technology development and innovation has been faster than expected. This rescaling, will be a challenging operation in terms of organisation and provision of information to the concerned market actors, requiring technical guidance, communication and training campaigns, including during the transitional periods[1] in order that the new scale is correctly applied by manufacturers leaving enough space for future innovations. Customers' confusion should be avoided by replacing labels displayed on the affected products within a short timeframe in order to ensure consumer choice to be directed to the highest class innovative products.
Sólo fondo perdido 5M €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 13-09-2018.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:The energy label is a key driver for innovation in the energy efficiency area. For more than 20 years the tangible results of the transformation of the European market are being observed, where only the products with the highest energy efficiency parameters and innovative solutions to save energy are being commercialised. The energy label stimulates a real competition in innovation among product manufacturers. However the current energy label has a closed scale from A+++ to D, so once the majority of products reach the highest classes, the label no longer stimulates further innovation. Therefore, the Commission has proposed that, in future, labels will be 'rescaled' (as well as go back to A-G scale), i.e. existing products will be re-categorised in lower classes so that the top classes are empty and provide new stimulus for innovation. The ‘empty top-class’ label will be the strongest and continuous innovation trigger. Rescaling of labels would take place approximately every ten years or faster, if technology development and innovation has been faster than expected. This rescaling, will be a challenging operation in terms of organisation and provision o... ver más

Specific Challenge:The energy label is a key driver for innovation in the energy efficiency area. For more than 20 years the tangible results of the transformation of the European market are being observed, where only the products with the highest energy efficiency parameters and innovative solutions to save energy are being commercialised. The energy label stimulates a real competition in innovation among product manufacturers. However the current energy label has a closed scale from A+++ to D, so once the majority of products reach the highest classes, the label no longer stimulates further innovation. Therefore, the Commission has proposed that, in future, labels will be 'rescaled' (as well as go back to A-G scale), i.e. existing products will be re-categorised in lower classes so that the top classes are empty and provide new stimulus for innovation. The ‘empty top-class’ label will be the strongest and continuous innovation trigger. Rescaling of labels would take place approximately every ten years or faster, if technology development and innovation has been faster than expected. This rescaling, will be a challenging operation in terms of organisation and provision of information to the concerned market actors, requiring technical guidance, communication and training campaigns, including during the transitional periods[1] in order that the new scale is correctly applied by manufacturers leaving enough space for future innovations. Customers' confusion should be avoided by replacing labels displayed on the affected products within a short timeframe in order to ensure consumer choice to be directed to the highest class innovative products.


Scope:The proposed action should cover one or more of the following points:

Raise the capacity of manufacturers and, in particular, retailers (e.g. through a comprehensive training methodology, involving a series of hands-on applications in each Member State) to fulfil their obligations providing and displaying respectively the correct label at the point of sale;Develop and roll out tailored and effective actions focusing on awareness-raising and information campaigns to alert market actors (businesses, public procurement personnel, consumers etc.) of label rescaling, with a view to increasing understanding of labels and routing purchase decisions towards higher efficiency products. These actions should also address any additional references that may exist on the rescaled label (e.g. QR code);Exchange of best practices in relation to these campaigns, including through the recommendation of common key messages to the respective target groups. All relevant stakeholders necessary for the successful implementation of the action should be involved (e.g. manufacturers, retailers, public procurement personnel and consumers).

The Commission considers that proposals requesting a contribution from the EU of between EUR 1 and 1.5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.


Expected Impact:Proposals are expected to demonstrate, depending on the scope addressed, the impacts listed below, using quantified indicators and targets wherever possible:

Primary energy savings triggered by the project (in GWh/year); Investments in sustainable energy triggered by the project (million Euro); Number of stakeholders (e.g. public procurement personnel, businesses and consumers) informed by actions aiming at improving the understanding of rescaled labels, minimising any risk of confusion (at least 5 million stakeholders per million Euro of EU funding); Number of manufacturers, suppliers and retailers engaged by actions aiming at improving their understanding of rescaled labels, minimising the risk of confusion (at least 5 000 market actors per million Euro of EU funding); Reduced compliance costs, maximise legal certainty and minimise errors during the transition periods for suppliers and dealers. Additional positive effects can be quantified and reported when relevant and wherever possible:

Reduction of the greenhouse gases emissions (in tCO2-eq/year) and/or air pollutants (in kg/year) triggered by the project.
Cross-cutting Priorities:Open InnovationRRI


[1]A period during which old (before the rescaling) and new rescaled labels for the same products would both be present in shops.

ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:The energy label is a key driver for innovation in the energy efficiency area. For more than 20 years the tangible results of the transformation of the European market are being observed, where only the products with the highest energy efficiency parameters and innovative solutions to save energy are being commercialised. The energy label stimulates a real competition in innovation among product manufacturers. However the current energy label has a closed scale from A+++ to D, so once the majority of products reach the highest classes, the label no longer stimulates further innovation. Therefore, the Commission has proposed that, in future, labels will be 'rescaled' (as well as go back to A-G scale), i.e. existing products will be re-categorised in lower classes so that the top classes are empty and provide new stimulus for innovation. The ‘empty top-class’ label will be the strongest and continuous innovation trigger. Rescaling of labels would take place approximately every ten years or faster, if technology development and innovation has been faster than expected. This rescaling, will be a challenging operation in terms of organisation and provision of information to the concerned market actors, requiring technical guidance, communication and training campaigns, including during the transitional periods[1] in order that the new scale is correctly applied by manufacturers leaving enough space for future innovations. Customers' confusion shou... Specific Challenge:The energy label is a key driver for innovation in the energy efficiency area. For more than 20 years the tangible results of the transformation of the European market are being observed, where only the products with the highest energy efficiency parameters and innovative solutions to save energy are being commercialised. The energy label stimulates a real competition in innovation among product manufacturers. However the current energy label has a closed scale from A+++ to D, so once the majority of products reach the highest classes, the label no longer stimulates further innovation. Therefore, the Commission has proposed that, in future, labels will be 'rescaled' (as well as go back to A-G scale), i.e. existing products will be re-categorised in lower classes so that the top classes are empty and provide new stimulus for innovation. The ‘empty top-class’ label will be the strongest and continuous innovation trigger. Rescaling of labels would take place approximately every ten years or faster, if technology development and innovation has been faster than expected. This rescaling, will be a challenging operation in terms of organisation and provision of information to the concerned market actors, requiring technical guidance, communication and training campaigns, including during the transitional periods[1] in order that the new scale is correctly applied by manufacturers leaving enough space for future innovations. Customers' confusion should be avoided by replacing labels displayed on the affected products within a short timeframe in order to ensure consumer choice to be directed to the highest class innovative products.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme.
Taking into account the nature of the activity and with the objective to maximize the European Added Value and European market uptake through transnational collaboration[[Transition towards Secure, Clean and Efficient Energy and the Energy Union project are cross-national policy initiatives and priorities aiming at trans-national solutions.]], the following additional eligibility criteria apply for Coordination and Support Actions (CSA):
at least three legal entities shall participate in an action;each of the three legal entities shall be established in a different Member State or Associated Country all three legal entities shall be independent of each other within the meaning of Article 8 of the Rules for Participation.
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme. 
Submission and evaluation processes are described in the...
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme.
Taking into account the nature of the activity and with the objective to maximize the European Added Value and European market uptake through transnational collaboration[[Transition towards Secure, Clean and Efficient Energy and the Energy Union project are cross-national policy initiatives and priorities aiming at trans-national solutions.]], the following additional eligibility criteria apply for Coordination and Support Actions (CSA):
at least three legal entities shall participate in an action;each of the three legal entities shall be established in a different Member State or Associated Country all three legal entities shall be independent of each other within the meaning of Article 8 of the Rules for Participation.
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme. 
Submission and evaluation processes are described in the Online Manual.
4. Indicative time for evaluation and grant agreements:
Information on the outcome of evaluation (single-stage call): maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
5. Proposal templates, evaluation forms and model grant agreements (MGA):
Coordination and Support Action:
Specific provisions and funding rates
Standard proposal template
Standard evaluation form
General MGA - Multi-Beneficiary
Annotated Grant Agreement
6. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply
Members of consortium are required to conclude a consortium agreement, in principle prior to the signature of the grant agreement.
8. Additional documents:
1. Introduction WP 2018-20
10. Secure, clean and efficient energy WP 2018-20
12. Climate action, environment, resource efficiency and raw materials WP 2018-20
18. Dissemination, Exploitation and Evaluation WP 2018-20
General annexes to the Work Programme 2018-2020
Legal basis: Horizon 2020 Regulation of Establishment
Legal basis: Horizon 2020 Rules for Participation
Legal basis: Horizon 2020 Specific Programme
7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in Annex L of the Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs. See the Online Manual.
Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
El presupuesto total de la convocatoria asciende a
Presupuesto total de la convocatoria.
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-LC-SC3-2018-2019-2020 New energy label driving and boosting innovation in products energy efficiency Specific Challenge:The energy label is a key driver for innovation in the energy efficiency area. For more than 20 years the tangible result...
Sin info.
LC-SC3-EE-2-2018-2019 European City Facility - European cities as key innovation hubs to unlock finance for energy efficiency
en consorcio:
Cerrada hace 2 años | Próxima convocatoria prevista para el mes de
LC-SC3-EE-18-2019 Bioclimatic approaches for improving energy performance in buildings in Africa and Europe
en consorcio: Specific Challenge:Africa is going through a rapid urbanisation phase and it is anticipated that, by 2030, there will be more people living...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
LC-SC3-EE-4-2019-2020 Upgrading smartness of existing buildings through innovations for legacy equipment
en consorcio: Specific Challenge:An essential part of Europe's clean energy transition is the changing role of buildings from consuming energy to actively...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
LC-SC3-EE-3-2019-2020 Stimulating demand for sustainable energy skills in the construction sector
en consorcio: Specific Challenge:Based on results of the BUILD UP Skills initiative, in particular the National Qualification Platforms and Roadmaps, as w...
Cerrada hace 5 años | Próxima convocatoria prevista para el mes de
LC-SC3-EE-17-2019 European City Facility - European cities as key innovation hubs to unlock finance for energy efficiency
en consorcio: Specific Challenge:Mobilising investment in energy efficiency and renewables is key for Europe's energy transition. The European Commission...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de