Innovating Works
LCE-04-2015
LCE-04-2015: Market uptake of existing and emerging renewable electricity, heating and cooling technologies
Scope:Specific challenge: The legal framework established by the Renewable Energy Directive (2009/28/EC, 'RES Directive')) sets binding targets for all Member States to contribute to the overall 20% target for renewable energy in the EU final energy consumption by 2020, and the 'Energy Roadmap 2050' shows that renewables will have to play a much greater role in all future scenarios beyond 2020. As well as putting in place legal obligations, the RES Directive also makes recommendations for specific actions to be taken by the public and private sectors across the EU.  However, in many areas, it leaves open the ways in which Member States may implement policies and support measures aiming to increase use of renewable energy at national, regional and local level. 
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 05-05-2015.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Specific challenge: The legal framework established by the Renewable Energy Directive (2009/28/EC, 'RES Directive')) sets binding targets for all Member States to contribute to the overall 20% target for renewable energy in the EU final energy consumption by 2020, and the 'Energy Roadmap 2050' shows that renewables will have to play a much greater role in all future scenarios beyond 2020. As well as putting in place legal obligations, the RES Directive also makes recommendations for specific actions to be taken by the public and private sectors across the EU.  However, in many areas, it leaves open the ways in which Member States may implement policies and support measures aiming to increase use of renewable energy at national, regional and local level. 

Consequently, although some Member States have already made good progress in incentivising renewable energy, there are still many opportunities for common learning and sharing of best practices on the cost-effective mobilisation of new investments in renewable energy across the EU.  Moreover, such investments contribute to the European 2020 strategy for growth, job creation, industrial innova... ver más

Scope:Specific challenge: The legal framework established by the Renewable Energy Directive (2009/28/EC, 'RES Directive')) sets binding targets for all Member States to contribute to the overall 20% target for renewable energy in the EU final energy consumption by 2020, and the 'Energy Roadmap 2050' shows that renewables will have to play a much greater role in all future scenarios beyond 2020. As well as putting in place legal obligations, the RES Directive also makes recommendations for specific actions to be taken by the public and private sectors across the EU.  However, in many areas, it leaves open the ways in which Member States may implement policies and support measures aiming to increase use of renewable energy at national, regional and local level. 

Consequently, although some Member States have already made good progress in incentivising renewable energy, there are still many opportunities for common learning and sharing of best practices on the cost-effective mobilisation of new investments in renewable energy across the EU.  Moreover, such investments contribute to the European 2020 strategy for growth, job creation, industrial innovation, and technological leadership as well as reducing emissions, improving the security of energy supplies and reducing EU’s energy import dependence.

Since the adoption of RES Directive in 2009, most Member States have experienced significant growth in renewable energy consumption. However, currently, we are seeing a deceleration of this growth, partly due to the economic crisis, but also because there are a number of market uptake barriers that remain or persist for both established and innovative renewable energy technologies.

Scope: To ensure the level of growth needed to deliver the EU targets for renewable energy, and to create the appropriate business environment for EU industrial leadership in low-carbon energy technologies, a number of important market-uptake challenges still need to be addressed, notably:

                     Ensuring sustained public acceptance of renewable energy projects and renewable energy overall, while taking into account the implications of the substantial increase in RES share in the final energy consumption;

                     Ensuring speedy and user friendly permitting procedures;

                     Implementing renewable energy policies, codes and legislations at EU, national, regional and local levels in a coordinated manner using best practice examples with significant replication potential;

                     Capacity building and contributing to the further development of renewable energy policy, legislation and regulation, and informing the debate on post-2020 horizons;

                     Capacity building and facilitating the deployment of improved business models and innovative financing schemes for mobilising investments in innovative and established renewable energy systems and services.

Proposals should address one or several of the challenges mentioned above for technologies and systems which are at TRL 7-9 (please see part G of the General Annexes). Regional specificities, socio-economic, spatial and environmental aspects from a life-cycle perspective shall be considered.  For all actions, the consortia should involve and/or engage relevant stakeholders and market actors who are committed to adopting/implementing the results.

For RES electricity, actions which address exchanges of information or cooperation among different actors (e.g. on future business models for aggregators), must demonstrate that they are promoting best practices. Actions which are developing new recommendations or which are contributing to the debate on costs and benefits of specific options must provide quantified indicators of the market impacts of future policy options.

For RES heating and cooling, proposals must demonstrate that they are adopting an integrated approach which fully respects the requirements and recommendations given in the energy efficiency and EPBD directives.  Actions aimed at promoting the use of geothermal, bio and/or solar heating for individual, industrial or district heating applications must involve / engage with the responsible policy makers and regulators as well as industry and potential financing bodies, and must include relevant capacity building and adoption of best practices.

The Commission considers that proposals requesting a contribution from the EU of between EUR 1 to 2 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

Expected impact: Increasing the share of renewable electricity, heating and cooling in the final energy consumption. Reductions in the time taken to authorise the construction of renewable energy plants and related infrastructure. Substantial and measurable reductions in the transaction costs for project developers as well as for the permitting authorities, whilst still fully addressing the needs for environmental impact assessments and public acceptance. Development of better policy, regulatory, market support and financing frameworks, including at regional and local level.

Type of action: Coordination and Support Actions

 


ver menos

Temáticas Obligatorias del proyecto: Temática principal: Renewable electricity RES consumers Renewable heating & cooling RES integration in buildings Bioenergy

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Specific challenge: The legal framework established by the Renewable Energy Directive (2009/28/EC, 'RES Directive')) sets binding targets for all Member States to contribute to the overall 20% target for renewable energy in the EU final energy consumption by 2020, and the 'Energy Roadmap 2050' shows that renewables will have to play a much greater role in all future scenarios beyond 2020. As well as putting in place legal obligations, the RES Directive also makes recommendations for specific actions to be taken by the public and private sectors across the EU.  However, in many areas, it leaves open the ways in which Member States may implement policies and support measures aiming to increase use of renewable energy at national, regional and local level.  Scope:Specific challenge: The legal framework established by the Renewable Energy Directive (2009/28/EC, 'RES Directive')) sets binding targets for all Member States to contribute to the overall 20% target for renewable energy in the EU final energy consumption by 2020, and the 'Energy Roadmap 2050' shows that renewables will have to play a much greater role in all future scenarios beyond 2020. As well as putting in place legal obligations, the RES Directive also makes recommendations for specific actions to be taken by the public and private sectors across the EU.  However, in many areas, it leaves open the ways in which Member States may implement policies and support measures aiming to increase use of renewable energy at national, regional and local level. 
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application
 
1. List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
2. Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme
3. Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme
3.2 Guide to the submission and evaluation process
4. Proposal page limits and layout: Please refer to Part B of the standard proposal template.
5. Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
6. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Coordination and Support Action:
[Specific provisions and funding rates]
[Standard proposal template (administrative forms and structure of technical annex)]
[Standard evaluation form]
[Annotated Model Grant Agreement - General]
7. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers...
Please read carefully all provisions below before the preparation of your application
 
1. List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
2. Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme
3. Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme
3.2 Guide to the submission and evaluation process
4. Proposal page limits and layout: Please refer to Part B of the standard proposal template.
5. Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
6. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Coordination and Support Action:
[Specific provisions and funding rates]
[Standard proposal template (administrative forms and structure of technical annex)]
[Standard evaluation form]
[Annotated Model Grant Agreement - General]
7. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
8. Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-LCE-2014-2015 Market uptake of existing and emerging renewable electricity, heating and cooling technologies Scope:Specific challenge: The legal framework established by the Renewable Energy Directive (2009/28/EC, 'RES Directive')) sets binding targ...
Sin info.
LCE-03-2014 Demonstration of renewable electricity and heating/cooling technologies
en consorcio:
Cerrada hace 3 años | Próxima convocatoria prevista para el mes de
LCE-Prize-CO2Reuse-01-2016 Horizon prize for CO2 reuse
en consorcio: Specific Challenge:Preventing dangerous climate change is a key priority for the European Union. Europe is working hard to cut its greenhous...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de
LCE-Prize-RenewableHospital-01-2016 Horizon prize for a Combined Heat and Power (CHP) Installation in a hospital using 100% Renewable Energy Sources
en consorcio: Specific Challenge:The integration and use of renewable energy in buildings for heat and power generation still encounter unsolved technolog...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de
LCE-Prize-PhotovoltaicsHistory-01-2016 Horizon prize for Integrated Photovoltaic System in European Protected Historic Urban districts
en consorcio: Specific Challenge:In Europe, architectural and planning rules for protected historic buildings lead to major technical constrains in integr...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de
LCE-20-2016-2017 Enabling pre-commercial production of advanced aviation biofuel
en consorcio:
Cerrada hace 7 años | Próxima convocatoria prevista para el mes de