EE-01-2014
EE-01-2014: Manufacturing of prefabricated modules for renovation of building
Scope:Specific challenge: Prefabricated components are more and more commonly used in the construction sector. Compared to traditional construction processes, prefabrication aims at reducing costs without compromising quality and facilitating installation/dismantling/re-use of components. It also facilitates the re-use of residue materials from the civil and industrial sectors. Building components could, when relevant, be prefabricated in factories to gain on construction time and to improve on-site health and safety. Accelerating the time for installation is particularly suitable for renovation while being occupied. Prefabrication should be adaptable to individual renovation solutions as well as for mass manufacturing in adequate projects and be adjusted and linked to computer design tools. 
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 20-03-2014.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Specific challenge: Prefabricated components are more and more commonly used in the construction sector. Compared to traditional construction processes, prefabrication aims at reducing costs without compromising quality and facilitating installation/dismantling/re-use of components. It also facilitates the re-use of residue materials from the civil and industrial sectors. Building components could, when relevant, be prefabricated in factories to gain on construction time and to improve on-site health and safety. Accelerating the time for installation is particularly suitable for renovation while being occupied. Prefabrication should be adaptable to individual renovation solutions as well as for mass manufacturing in adequate projects and be adjusted and linked to computer design tools. 

Further research is needed to improve understanding of material and component behaviour in the whole life cycle[1] and, consequently, to be able to produce better performing products, taking into account important aspects such as the overall thermal performance and airtightness. Innovative technologies for energy efficiency (e.g. HVAC components) and renewable energy sources (e.g... ver más

Scope:Specific challenge: Prefabricated components are more and more commonly used in the construction sector. Compared to traditional construction processes, prefabrication aims at reducing costs without compromising quality and facilitating installation/dismantling/re-use of components. It also facilitates the re-use of residue materials from the civil and industrial sectors. Building components could, when relevant, be prefabricated in factories to gain on construction time and to improve on-site health and safety. Accelerating the time for installation is particularly suitable for renovation while being occupied. Prefabrication should be adaptable to individual renovation solutions as well as for mass manufacturing in adequate projects and be adjusted and linked to computer design tools. 

Further research is needed to improve understanding of material and component behaviour in the whole life cycle[1] and, consequently, to be able to produce better performing products, taking into account important aspects such as the overall thermal performance and airtightness. Innovative technologies for energy efficiency (e.g. HVAC components) and renewable energy sources (e.g. photovoltaics, solar collector) can also be integrated in the prefabricated multi-functional modules and components. The elements are to be developed, prototyped, optimised and transferred from individual manufacturing to mass production.

Scope: Innovative mass manufacturing processes must be investigated to lower pre-fabrication costs and ease building integration processes, also taking into account the challenge of aesthetics of existing buildings. This requires the development of new controlled processes and cost-effective automated/robotised tools.

These innovations should be combined with integrated processes and the use of advanced computer based tools like Building Information Modelling which will facilitate the industrialisation of the whole construction process and integrate the value chain over the life cycle of the project. Durability of proposed solutions will have to be evaluated in real installation conditions, incorporating integrated and embedded reliable monitoring systems, as this is a crucial factor that influences final product performances. The criteria and methods for evaluation of the benefits should be transparent and simple.

During the development of technology and components for prefabricated facade elements, the use of recycled materials should be investigated and structural engineering aspects must be taken into account to enhance the automated and robotized construction technologies. A business model addressing cost-optimality aspects for given building types and geo-clusters across Europe should be addressed in the proposals.

The proposals should cover mainly demonstration activities. Prototypes and pilot implementations in real industrial settings represent a clear added-value, as does the involvement of SMEs involved in the manufacture and installation of prefabricated modules.

The Commission considers that proposals requesting a contribution from the EU of between EUR 3 and 5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

This topic will be implemented under the PPP on Energy-efficient Buildings. The activities are expected to be implemented at Technology Readiness Level (TRL) 5-7 (please see part G of the General Annexes).

Expected impact:

         Reduction in total buildings (primary) energy consumption by at least a factor of 2 with respect to the current situation, and a cost-level better than traditional renovation activities.

         Significant reduction of renovation operations while ensuring low intrusiveness and impact for users.

         Reduction in installation time by at least 30%, compared to a typical renovation process for the building type.

         Better quality standard and performance guarantee for the installed prefabricated modules and their integrated components, while enhancing indoor air quality.

         Demonstration of the replicability potential.

         A maximum return on investment below 10 years for end-users.

         Generation of new high-tech SMEs specialised in renovation with prefabricated modules.

         High-skill jobs for workers that could master innovative construction tools.

Type of action: Innovation Actions

[1] Based e.g. on Life Cycle Assessment or Carbon Footprint of Products.


Cross-cutting Priorities:Contractual Public-Private Partnerships (cPPPs)Y


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Specific challenge: Prefabricated components are more and more commonly used in the construction sector. Compared to traditional construction processes, prefabrication aims at reducing costs without compromising quality and facilitating installation/dismantling/re-use of components. It also facilitates the re-use of residue materials from the civil and industrial sectors. Building components could, when relevant, be prefabricated in factories to gain on construction time and to improve on-site health and safety. Accelerating the time for installation is particularly suitable for renovation while being occupied. Prefabrication should be adaptable to individual renovation solutions as well as for mass manufacturing in adequate projects and be adjusted and linked to computer design tools.  Scope:Specific challenge: Prefabricated components are more and more commonly used in the construction sector. Compared to traditional construction processes, prefabrication aims at reducing costs without compromising quality and facilitating installation/dismantling/re-use of components. It also facilitates the re-use of residue materials from the civil and industrial sectors. Building components could, when relevant, be prefabricated in factories to gain on construction time and to improve on-site health and safety. Accelerating the time for installation is particularly suitable for renovation while being occupied. Prefabrication should be adaptable to individual renovation solutions as well as for mass manufacturing in adequate projects and be adjusted and linked to computer design tools. 
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
1. List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
2. Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
3. EVALUATION
3.1 Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme
3.2 Guide to the submission and evaluation process
 
4. Proposal page limits and layout: Please refer to Part B of the standard proposal template. 
5. Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
6. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Innovation Action:
Specific provisions and funding rates
Standard proposal template (administrative forms and structure of technical annex)
Standard evaluation form
Annotated Model Grant Agreement
 
7. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL...
Please read carefully all provisions below before the preparation of your application.
1. List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
2. Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
3. EVALUATION
3.1 Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme
3.2 Guide to the submission and evaluation process
 
4. Proposal page limits and layout: Please refer to Part B of the standard proposal template. 
5. Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
6. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Innovation Action:
Specific provisions and funding rates
Standard proposal template (administrative forms and structure of technical annex)
Standard evaluation form
Annotated Model Grant Agreement
 
7. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
8. Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-EE-2014-2015 Manufacturing of prefabricated modules for renovation of building Scope:Specific challenge: Prefabricated components are more and more commonly used in the construction sector. Compared to traditional const...
Sin info.
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2022-SEE-01 Sustainable growth and building resilience in tourism – empowering SMEs to carry out the twin transition
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 8 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2023-EENEE-01 Enterprise Europe Network Energy Efficiency Action
en consorcio:
Cerrada hace 9 meses | Próxima convocatoria prevista para el mes de