Innovating Works
HORIZON-CL5-2024-D5-01-04
HORIZON-CL5-2024-D5-01-04: Integrated flexible multipoint megawatt charging systems for electric truck mass deployment (2ZERO Partnership) (2024)
Expected Outcome:Project results are expected to contribute to all the following outcomes:
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 18-04-2024.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Hace 7 mes(es) del cierre de la convocatoria y aún no tenemos información sobre los proyectos financiados, puede que esta información se publique pronto.
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio..
Esta ayuda financia Proyectos:

Expected Outcome:Project results are expected to contribute to all the following outcomes:

Improved designs, architectures and models of interoperable multipoint megawatt charging systems for future mass deployment of Heavy-Duty trucks and concepts for managing their grid impact.Tools to identify the energy needs and the charging profiles of the electric vehicles that are expected to charge on megawatt charging systems.Integrated and flexible interaction control and energy management based on interoperable and open protocols between on-board and off-board charging-related components and the local grid demand flexibility providers, renewable electricity generation and energy storage systems,Improved modelling of the optimal geographical locations for large-scale megawatt charging hubs for Heavy and Medium Duty Vehicles and multiplexed Light Duty passenger/commercial vehicles usage at traffic peak times while also considering the relevant challenges to the grids and their mitigation with smart charging concepts, in consideration of locally available energy grids capacities and local energy storage.Tools and services for planning, operation, availability and reliability o... ver más

Expected Outcome:Project results are expected to contribute to all the following outcomes:

Improved designs, architectures and models of interoperable multipoint megawatt charging systems for future mass deployment of Heavy-Duty trucks and concepts for managing their grid impact.Tools to identify the energy needs and the charging profiles of the electric vehicles that are expected to charge on megawatt charging systems.Integrated and flexible interaction control and energy management based on interoperable and open protocols between on-board and off-board charging-related components and the local grid demand flexibility providers, renewable electricity generation and energy storage systems,Improved modelling of the optimal geographical locations for large-scale megawatt charging hubs for Heavy and Medium Duty Vehicles and multiplexed Light Duty passenger/commercial vehicles usage at traffic peak times while also considering the relevant challenges to the grids and their mitigation with smart charging concepts, in consideration of locally available energy grids capacities and local energy storage.Tools and services for planning, operation, availability and reliability of the overall megawatt charging multipoint hubs from users’ perspectives (vehicle driver, fleet manager) and grid operators and energy providers.Highly energy efficient megawatt-charging hubs, also with optimal utilisation of multi-point megawatt charging stations for HDV-users but also considering other types of vehicles.The proposed concept for a charging stations with at least four flexible megawatt charging points of 1MW or more will be demonstrated at the end of the project, each of these points being in turn also capable of recharging at least four lighter vehicles. Scope:Next generation battery electric vehicles need to be more energy efficient and affordable, which means to keep battery size to the practical minimum. Megawatt charging is then required to meet the demand for long operational range with even shorter charging times. Ultra-high-power charging on-board and off-board sub-systems design is, as a first step, covered in topic HORIZON-CL5-2022-D5-01-08. The present topic covers their evolution towards multi-charger hubs that cater for a widespread deployment of these vehicles on the 2030 horizon. Limited on-board systems optimisation may be included if properly justified. At the same time each charger in these charging hubs will be usable for multiple lighter vehicles with lower power (150-350 kW) during peak times such as weekend or holiday periods, when demand from heavy duty vehicles may be lower. This will also require concepts for topologies capable for accommodating one heavy vehicle or 4-6 light vehicles in each charging spot.

Proposals are expected to address all the following aspects:

Consider typical demands along significant TEN-T corridors, including under severe weather and peak conditions, as well as opportunities for sharing and balancing power supply within studied areas, locations of logistics terminals and truck stops with nearby depots for overnight charging of trucks, buses, and construction machines, car-parking etc. Input from EU Member States/Associated countries’ maps with aggregated charging demands and expected high power charging station localisations as well as input from grid operators on power system local and regional conditions is also expected. Such terminals/ hubs for charging should offer charging on non-discriminatory basis.Particular attention should be paid to the real needs of end users, including optimised infrastructure locations, its reverse impact on the traffic flow, ease of use and interoperable protocols that do not hinder universal use across different countries; the identification and analysis of potential regulatory aspects and barriers for relevant standardisation activities is encouraged.The developed tools should have the capability to map the optimal locations for a fast and high-power charging infrastructure (already built-up logistics hubs, truck service centres, truck and bus depots, and for new ones also considering the permitting process), offering planning information including to the developers of the targeted infrastructure. For optimisation of the overall system use, services and tools should be developed keeping into account on-board EV system characteristics. Topic is open to international collaboration, in particular regarding interface specifications (e.g. with the USA).

This topic implements the co-programmed European Partnership on ‘Towards zero emission road transport’ (2ZERO). As such, projects resulting from this topic will be expected to report on the results to the European Partnership ‘Towards zero emission road transport’ (2ZERO) in support of the monitoring of its KPIs.

ver menos

Temáticas Obligatorias del proyecto: Temática principal: The project aims to develop efficient and affordable megawatt charging systems for electric vehicles, focusing on interoperability, energy management, and grid impact. It includes tools for planning, operation, and reliability, with a demonstration of multi-point megawatt charging hubs for Heavy and Medium Duty Vehicles, ensuring energy efficiency and grid optimization.
Electric Vehicles Energy Management Grid Impact Management

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: *Presupuesto para cada participante en el proyecto
Requisitos técnicos: The project aims to develop interoperable megawatt charging systems for Heavy-Duty trucks, enhancing energy management, grid impact mitigation, and user perspectives. It includes tools to optimize energy efficiency, identify optimal charging locations, and provide efficient and reliable charging services for electric vehicles. The project aims to develop interoperable megawatt charging systems for Heavy-Duty trucks, enhancing energy management, grid impact mitigation, and user perspectives. It includes tools to optimize energy efficiency, identify optimal charging locations, and provide efficient and reliable charging services for electric vehicles.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Subcontracting costs.
Purchase costs.
Other cost categories.
Indirect costs.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 6:. Representa un paso importante en demostrar la madurez de una tecnología. Se construye un prototipo de alta fidelidad que aborda adecuadamente las cuestiones críticas de escala, que opera en un entorno relevante, y que debe ser a su vez una buena representación del entorno operativo real. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
Para el presupuesto subvencionable la intensidad de la ayuda en formato fondo perdido podrá alcanzar desde un 70% hasta un 100%.
The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities. The funding rate for IA projects is 70 % for profit-making legal entities and 100 % for non-profit legal entities.
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda no tiene efecto incentivador. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.
Certificado DNSH: Los proyectos presentados a esta línea deben de certificarse para demostrar que no causan perjuicio al medio ambiente. + info

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
Deducción I+D+i:
0% 25% 50% 75% 100%
La empresa puede aplicar deducciones fiscales en I+D+i de los gastos del proyecto y reducir su impuesto de sociedades. + info