Innovating Works
ICT-23-2019
ICT-23-2019: EU-Taiwan 5G collaboration
Specific Challenge:This activity, integrated end-to-end network for 5G trials, is to test 5G systems for specific applications and it follows up on the first targeted opening call with Taiwan in which 5G research and demonstration facilities offered by Taiwan towards collaborative 5G research with the EU.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 15-01-2019.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:This activity, integrated end-to-end network for 5G trials, is to test 5G systems for specific applications and it follows up on the first targeted opening call with Taiwan in which 5G research and demonstration facilities offered by Taiwan towards collaborative 5G research with the EU.

The integrated end-to-end network for 5G trials activity is to utilize the infrastructure of the integrated 5G access/core networks in test beds, in Europe and Taiwan, to verify the requirements of 5G technologies in joint trials for specific applications such as AR/VR for entertainment, V2X communications, utilities, e-Health, drone, factory of the future (though not limited to those) featuring high peak data rates and network density, ultra-low latency, and high reliability.


Scope:The scope is to conduct 5G trials addressing technology and business validation of 5G end-to-end connectivity and associated management from applications in Taiwan that will support the development of mmWave, massive MIMO, new air interfaces, multi-user access and other technologies, aiming to increase the network capacity in an ultra-dense network and to provide access... ver más

Specific Challenge:This activity, integrated end-to-end network for 5G trials, is to test 5G systems for specific applications and it follows up on the first targeted opening call with Taiwan in which 5G research and demonstration facilities offered by Taiwan towards collaborative 5G research with the EU.

The integrated end-to-end network for 5G trials activity is to utilize the infrastructure of the integrated 5G access/core networks in test beds, in Europe and Taiwan, to verify the requirements of 5G technologies in joint trials for specific applications such as AR/VR for entertainment, V2X communications, utilities, e-Health, drone, factory of the future (though not limited to those) featuring high peak data rates and network density, ultra-low latency, and high reliability.


Scope:The scope is to conduct 5G trials addressing technology and business validation of 5G end-to-end connectivity and associated management from applications in Taiwan that will support the development of mmWave, massive MIMO, new air interfaces, multi-user access and other technologies, aiming to increase the network capacity in an ultra-dense network and to provide access for a massive number of devices.

Proposals are encouraged to consider network virtualization approaches such as SDN/NFV and network slicing to make the best use of the resources for services with a reduction in CAPEX and OPEX.

The targeted 5G technologies and architectures should support the specific performance requirements stemming from the considered vertical use cases. The trials should go beyond proof of concept and leverage the results of related 5G PPP projects and Taiwan’s 5G Program.

The Commission considers that proposals requesting a contribution from the EU of up to 2 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.


Expected Impact: Validation of core 5G technologies and architectures in the context of specific vertical use cases. Leverage cooperation towards industrial consensus between EU and Taiwan on 5G key aspects such as standard, spectrum, architecture and interoperability. Accelerate the pre-commercialization trials of the use cases introduced by IMT-2020 (eMBB, mMTC, URLLC).
Cross-cutting Priorities:International cooperation


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:This activity, integrated end-to-end network for 5G trials, is to test 5G systems for specific applications and it follows up on the first targeted opening call with Taiwan in which 5G research and demonstration facilities offered by Taiwan towards collaborative 5G research with the EU. Specific Challenge:This activity, integrated end-to-end network for 5G trials, is to test 5G systems for specific applications and it follows up on the first targeted opening call with Taiwan in which 5G research and demonstration facilities offered by Taiwan towards collaborative 5G research with the EU.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
A small piece of text, which is also relevant for this topic, can be found in the 'Call Summary' under the subheading '5G'.
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme.
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme.
Submission and evaluation processes are described in the Online Manual.
Due to the specific scope of this topic, in addition to the minimum number of participants set out in the General Annexes, proposals shall include at least two participants from Taiwan.
Proposals will only be selected on the condition that the eligibility of Taiwanese partners is validated by Taiwan Government prior to technical review.
 
4. Indicative time for evaluation and grant agreements:
Information on the outcome of evaluation (single-stage call): maximum 5 months from the deadline for submission.
Signature of grant agreements...
A small piece of text, which is also relevant for this topic, can be found in the 'Call Summary' under the subheading '5G'.
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme.
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme.
Submission and evaluation processes are described in the Online Manual.
Due to the specific scope of this topic, in addition to the minimum number of participants set out in the General Annexes, proposals shall include at least two participants from Taiwan.
Proposals will only be selected on the condition that the eligibility of Taiwanese partners is validated by Taiwan Government prior to technical review.
 
4. Indicative time for evaluation and grant agreements:
Information on the outcome of evaluation (single-stage call): maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
5. Proposal templates, evaluation forms and model grant agreements (MGA):
Research and Innovation Action:
Specific provisions and funding rates
Standard proposal template
Standard evaluation form
General MGA - Multi-Beneficiary
Annotated Grant Agreement
 
6. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Members of consortium are required to conclude a consortium agreement, in principle prior to the signature of the grant agreement.
8. Additional documents:
1. Introduction WP 2018-20
5. Introduction to Leadership in enabling and industrial technologies (LEITs) WP 2018-20
5i. Information and communication technologies (ICT) WP 2018-20
18. Dissemination, Exploitation and Evaluation WP 2018-20
General annexes to the Work Programme 2018-2020
Legal basis: Horizon 2020 Regulation of Establishment
Legal basis: Horizon 2020 Rules for Participation
Legal basis: Horizon 2020 Specific Programme
 
 
7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in Annex L of the Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs. See the Online Manual.
Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-ICT-2018-20 EU-Taiwan 5G collaboration Specific Challenge:This activity, integrated end-to-end network for 5G trials, is to test 5G systems for specific applications and it follow...
Sin info.
DT-ICT-12-2020 Boost rural economies through cross-sector digital service platforms
en consorcio:
Cerrada hace 10 meses | Próxima convocatoria prevista para el mes de
ICT-48-2020 Towards a vibrant European network of AI excellence centres
en consorcio:
Cerrada hace 1 año | Próxima convocatoria prevista para el mes de
ICT-56-2020 Next Generation Internet of Things
en consorcio:
Cerrada hace 1 año | Próxima convocatoria prevista para el mes de
ICT-57-2020 An empowering, inclusive Next Generation Internet
en consorcio:
Cerrada hace 1 año | Próxima convocatoria prevista para el mes de
ICT-49-2020 Artificial Intelligence on demand platform
en consorcio:
Cerrada hace 1 año | Próxima convocatoria prevista para el mes de