Innovating Works
EE-07-2015
EE-07-2015: Enhancing the capacity of public authorities to plan and implement sustainable energy policies and measures
Scope:Specific challenge: Public authorities play a key role in the reduction of EU energy consumption and the increase of renewable energy capacity. For instance Member States must produce and implement National Energy Efficiency Action Plans (NEEAPs) and National Renewable Energy Action Plans. They also have the obligation to produce detailed action plans in specific sectors such as the renovation of buildings or the application of high-efficiency cogeneration and efficient district heating and cooling systems. Local and regional authorities are also developing plans at their own level and other public authorities play an important role too; national energy regulatory authorities for instance should provide incentives for grid operators (heat, cold, and electricity) to enable network users to produce renewable energies and implement energy efficiency measures.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 04-06-2015.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Specific challenge: Public authorities play a key role in the reduction of EU energy consumption and the increase of renewable energy capacity. For instance Member States must produce and implement National Energy Efficiency Action Plans (NEEAPs) and National Renewable Energy Action Plans. They also have the obligation to produce detailed action plans in specific sectors such as the renovation of buildings or the application of high-efficiency cogeneration and efficient district heating and cooling systems. Local and regional authorities are also developing plans at their own level and other public authorities play an important role too; national energy regulatory authorities for instance should provide incentives for grid operators (heat, cold, and electricity) to enable network users to produce renewable energies and implement energy efficiency measures.

Doing this requires multidisciplinary skills to e.g. assess different cross-sector sustainable energy options, according to technical, environmental, economic and social criteria. It also requires skills to engage stakeholders in both the definition and implementation of the solutions, and to secure funding. <... ver más

Scope:Specific challenge: Public authorities play a key role in the reduction of EU energy consumption and the increase of renewable energy capacity. For instance Member States must produce and implement National Energy Efficiency Action Plans (NEEAPs) and National Renewable Energy Action Plans. They also have the obligation to produce detailed action plans in specific sectors such as the renovation of buildings or the application of high-efficiency cogeneration and efficient district heating and cooling systems. Local and regional authorities are also developing plans at their own level and other public authorities play an important role too; national energy regulatory authorities for instance should provide incentives for grid operators (heat, cold, and electricity) to enable network users to produce renewable energies and implement energy efficiency measures.

Doing this requires multidisciplinary skills to e.g. assess different cross-sector sustainable energy options, according to technical, environmental, economic and social criteria. It also requires skills to engage stakeholders in both the definition and implementation of the solutions, and to secure funding.

The situation regarding the availability of these skills varies from country to country; e.g. while certain public authorities have a long tradition of using energy performance contracting, others have not tried yet; or while a few Member States oblige large cities to develop urban mobility plans, such plans are not common practice in other countries.

Scope: Proposals demonstrating an innovative approach in empowering public authorities to develop, finance and implement ambitious sustainable energy policies and plans (for instance under the Covenant of Mayors initiative), on the basis of reliable data and analyses. Public actors should be encouraged to look at sectors with high energy saving potential such as buildings, industry and urban mobility. The geographical coverage should be well justified on the basis of European added-value. Capacity building should be an integral part of project proposals.

The following actions are part of the scope:

Raising the capacity of Member States to fulfil their obligation under the new Energy Efficiency Directive. Enabling national energy regulatory authorities to address demand issues (e.g. demand response, tariff design, assessment of generation adequacy assessment). Capacity building on integrated energy, transport mobility and land-use planning at community and city-level. Supporting public authorities in better linking up local, regional and national levels for delivering integrated sustainable energy action planning and projects to achieve synergies and economies of scale. Establishing new or exploiting existing networks and other mechanisms to spread knowledge and facilitating the exchange of experiences and best practice on sustainable energy. Large-scale capacity building on innovative financing to specific groups of public authorities, such as national, local and regional authorities, energy agencies, structural and cohesion funds managing authorities. Defining and implementing standard energy saving packages for households, public sector and industry in particular under Article 7 of the Energy Efficiency Directive. The Commission considers that proposals requesting a contribution from the EU of between EUR 1 and 1.5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

Expected impact: Impacts must be measured in terms of number of public officers influenced and number of new or improved policies and plans. The number of final consumers impacted should also be measured in millions of people. In addition, proposals targeting governments should also demonstrate that they accelerate the implementation of the new Energy Efficiency Directive.

Type of action: Coordination and Support Actions


Cross-cutting Priorities:GenderSocio-economic science and humanities


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Specific challenge: Public authorities play a key role in the reduction of EU energy consumption and the increase of renewable energy capacity. For instance Member States must produce and implement National Energy Efficiency Action Plans (NEEAPs) and National Renewable Energy Action Plans. They also have the obligation to produce detailed action plans in specific sectors such as the renovation of buildings or the application of high-efficiency cogeneration and efficient district heating and cooling systems. Local and regional authorities are also developing plans at their own level and other public authorities play an important role too; national energy regulatory authorities for instance should provide incentives for grid operators (heat, cold, and electricity) to enable network users to produce renewable energies and implement energy efficiency measures. Scope:Specific challenge: Public authorities play a key role in the reduction of EU energy consumption and the increase of renewable energy capacity. For instance Member States must produce and implement National Energy Efficiency Action Plans (NEEAPs) and National Renewable Energy Action Plans. They also have the obligation to produce detailed action plans in specific sectors such as the renovation of buildings or the application of high-efficiency cogeneration and efficient district heating and cooling systems. Local and regional authorities are also developing plans at their own level and other public authorities play an important role too; national energy regulatory authorities for instance should provide incentives for grid operators (heat, cold, and electricity) to enable network users to produce renewable energies and implement energy efficiency measures.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
&nbsp;
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme with&nbsp;the following exceptions:
- at least three legal entities shall participate in an action;
- each of the three legal entities shall be established in a different Member State or Associated Country;
- all three legal entities shall be independent of each other within the meaning of Article&nbsp;8 of the rules of participation.
&nbsp;
Evaluation
3.1&nbsp; Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Guide to the submission and evaluation process
&nbsp;
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
&nbsp;
Indicative timetable for evaluation and grant agreement:
One-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
&nbsp;
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Coordination and Support Action:
S...
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
&nbsp;
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme with&nbsp;the following exceptions:
- at least three legal entities shall participate in an action;
- each of the three legal entities shall be established in a different Member State or Associated Country;
- all three legal entities shall be independent of each other within the meaning of Article&nbsp;8 of the rules of participation.
&nbsp;
Evaluation
3.1&nbsp; Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Guide to the submission and evaluation process
&nbsp;
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
&nbsp;
Indicative timetable for evaluation and grant agreement:
One-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
&nbsp;
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Coordination and Support Action:
Specific provisions and funding rates
Standard proposal template (administrative forms and structure of technical annex)
Standard evaluation form
Annotated Model Grant Agreement
&nbsp;
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) &ndash; where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties &ndash; where a topic description foresees financial support to Third Parties, these provisions apply.
&nbsp;
&nbsp;
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-EE-2014-2015 Enhancing the capacity of public authorities to plan and implement sustainable energy policies and measures Scope:Specific challenge: Public authorities play a key role in the reduction of EU energy consumption and the increase of renewable energy...
Sin info.
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2022-SEE-01 Sustainable growth and building resilience in tourism – empowering SMEs to carry out the twin transition
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 8 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2023-EENEE-01 Enterprise Europe Network Energy Efficiency Action
en consorcio:
Cerrada hace 9 meses | Próxima convocatoria prevista para el mes de