EE-03-2014: Energy strategies and solutions for deep renovation of historic buildings
Scope:Specific Challenge: Around a quarter of the existing building stock in Europe was built prior to the middle of the last century.  Many such buildings,often valued for their cultural, architectural and historic significance not only reflect the unique character and identity of European cities but include essential infrastructure for housing, public buildings etc.  A significant number of these historic buildings continue to use conventional inefficient fossil-fuel based energy systems typically associated with high energy costs and with greater than average CO2 emissions and cost of refurbishment.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 20-03-2014.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Specific Challenge: Around a quarter of the existing building stock in Europe was built prior to the middle of the last century.  Many such buildings,often valued for their cultural, architectural and historic significance not only reflect the unique character and identity of European cities but include essential infrastructure for housing, public buildings etc.  A significant number of these historic buildings continue to use conventional inefficient fossil-fuel based energy systems typically associated with high energy costs and with greater than average CO2 emissions and cost of refurbishment.

The need to save costs increasingly leads to tighter rationing or shutdown of heating or cooling systems, further worsening conditions for conservation of the buildings, for artworks or collections as well as for living conditions. 

Furthermore, changes in building-se and higher indoor comfort expectations than in the past is driving up demand for energy, a particular challenge when buildings of historic value are used or converted for residential, educational, retail, office or other purposes.

Due to the need to preserve authenticity and integ... ver más

Scope:Specific Challenge: Around a quarter of the existing building stock in Europe was built prior to the middle of the last century.  Many such buildings,often valued for their cultural, architectural and historic significance not only reflect the unique character and identity of European cities but include essential infrastructure for housing, public buildings etc.  A significant number of these historic buildings continue to use conventional inefficient fossil-fuel based energy systems typically associated with high energy costs and with greater than average CO2 emissions and cost of refurbishment.

The need to save costs increasingly leads to tighter rationing or shutdown of heating or cooling systems, further worsening conditions for conservation of the buildings, for artworks or collections as well as for living conditions. 

Furthermore, changes in building-se and higher indoor comfort expectations than in the past is driving up demand for energy, a particular challenge when buildings of historic value are used or converted for residential, educational, retail, office or other purposes.

Due to the need to preserve authenticity and integrity, many recently developed solutions in the field of renovation are not compatible with or adequately adapted for use in historic buildings. This is particularly the case for listed or protected buildings.

It is also difficult to fully assess and model reliably the energy performance of the many different types of historic buildings across Europe or to assess the effect of energy efficiency measures or more sustainable solutions.

The scope for improved energy-efficiency of historic buildings is significant if addressed by holistic[1], and deep[2] renovation schemes that integrate innovative technologies, adapted standards and methodologies which consider the district dimension and stakeholder involvement.

Energy strategies and solutions for historic buildings have been identified as one of the priority areas in the roadmap of the EeB PPP.

Scope:

Project proposals should focus on the development of innovative and affordable building renovation solutions for historic buildings that can deliver significant[3] improvements in energy performance while ensuring indoor comfort requirements, non-invasive, reversible solutions.

The emphasis should be on eco-innovation and sustainability by integrating cost-effective technologies for energy efficiency and renewable energy solutions.

Projects may address specific aspects such as innovative energy and environmental assessment methodologies (based on life-cycle and including specific non-monetary aspects in the cost/benefit and return on investment analysis), tools for planning and implementing the  renovation of historic buildings, monitoring and control technologies and systems, non-invasive and non-destructive methods of surveying and diagnosis together with appropriate standards and information management for building maintenance.

Projects should clearly demonstrate the effectiveness of the technologies, methodologies, systems or tools developed and to prove the replication potential of the proposed solutions with, where appropriate, the use of case studies.

The Commission considers that proposals requesting a contribution from the EU of between EUR 3 and 5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

This topic will be implemented under the PPP on Energy-efficient Buildings. The activities are expected to be implemented at TRL 4-6 (please see part G of the General Annexes).

Expected Impact: Optimised design and implementation of renovation projects for historic buildings and for listed and protected buildings in particular, delivering significant improvements in energy performance at both building and district level through more tailored solutions. Provision of effective guidelines and contribution to standardisation activities in this field. Reduced fragmentation in this sector through increased collaboration and cooperation and fostering of a more interdisciplinary approach and support to the implementation of the roadmap of the EeB PPP.

Type of action: Research & Innovation Actions

[1] Considering all the refurbishment possibilities at building level together with opportunities at district level such as biomass, geothermal, district heating, etc.

[2] Deep renovation should lead to a refurbishment that reduces both the delivered and the final energy consumption of a building by a significant percentage compared with the pre-renovation levels (cf Directive 2012/27/EU on Energy Efficiency).

[3] Significant savings to  both the delivered and the final energy consumption of a building  compared with the pre-renovation levels (cf Directive 2012/27/EU on Energy Efficiency, Directive 2010/31 on the Energy Performance of Buildings )


Cross-cutting Priorities:Socio-economic science and humanitiesContractual Public-Private Partnerships (cPPPs)Y


ver menos

Temáticas Obligatorias del proyecto: Temática principal: Energy efficient buildings Renovation

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Specific Challenge: Around a quarter of the existing building stock in Europe was built prior to the middle of the last century.  Many such buildings,often valued for their cultural, architectural and historic significance not only reflect the unique character and identity of European cities but include essential infrastructure for housing, public buildings etc.  A significant number of these historic buildings continue to use conventional inefficient fossil-fuel based energy systems typically associated with high energy costs and with greater than average CO2 emissions and cost of refurbishment. Scope:Specific Challenge: Around a quarter of the existing building stock in Europe was built prior to the middle of the last century.  Many such buildings,often valued for their cultural, architectural and historic significance not only reflect the unique character and identity of European cities but include essential infrastructure for housing, public buildings etc.  A significant number of these historic buildings continue to use conventional inefficient fossil-fuel based energy systems typically associated with high energy costs and with greater than average CO2 emissions and cost of refurbishment.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
1. List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
 
2. Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme. 
 
3. EVALUATION
3.1 Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programmme.
3.2 Guide to the submission and evaluation process
4. Proposal page limits and layout: Please refer to Part B of the standard proposal template.
5. Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
6. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Research and Innovation Action:
Specific provisions and funding rates
Standard proposal template (administrative forms and structure of technical annex)
Standard evaluation form
Annotated Model Grant Agreement
7. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic descriptio...
Please read carefully all provisions below before the preparation of your application.
1. List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
 
2. Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme. 
 
3. EVALUATION
3.1 Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programmme.
3.2 Guide to the submission and evaluation process
4. Proposal page limits and layout: Please refer to Part B of the standard proposal template.
5. Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
6. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Research and Innovation Action:
Specific provisions and funding rates
Standard proposal template (administrative forms and structure of technical annex)
Standard evaluation form
Annotated Model Grant Agreement
7. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
  
8. Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-EE-2014-2015 Energy strategies and solutions for deep renovation of historic buildings Scope:Specific Challenge: Around a quarter of the existing building stock in Europe was built prior to the middle of the last century.  Many...
Sin info.
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
Cerrada hace 8 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2022-SEE-01 Sustainable growth and building resilience in tourism – empowering SMEs to carry out the twin transition
Cerrada hace 8 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 8 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 10 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2023-EENEE-01 Enterprise Europe Network Energy Efficiency Action
en consorcio:
Cerrada hace 11 meses | Próxima convocatoria prevista para el mes de