Innovating Works
LCE-15-2015
LCE-15-2015: Enabling decarbonisation of the fossil fuel-based power sector and energy intensive industry through CCS
Scope:Specific challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossil fuels will continue to be used in Europe's power generation as well as in other industrial processes for decades to come. Therefore, the 2050 target can only be achieved if the emissions from fossil fuel combustion in the power generation sector and energy intensive industries are eliminated from the system. This will require the application of Carbon Capture and Storage (CCS). The assessments made in the context of the EU's Roadmap for the transition to a competitive low carbon economy in 2050 and the Energy Roadmap 2050 see CCS as an important technology contributing to decarbonisation scenarios in the EU, with 7% to 32% of all power generation using CCS by 2050. The application of CCS to industrial sectors other than power (e.g. steel, cement, lime, chemical industry, refining) is expected to deliver half of the global emissions reduction from CCS by 2050. In the near future, these industrial applications will open up new opportunities and avenues for CCS that can accelerate its deployment. For all applications, the demonstration of CO2 storage is of major importance. Therefore, two key challenges in the short-term for driving CCS to deployment are geological storage and the application of CCS to industrial sectors other than power, including bio-CCS.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 03-09-2014.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Specific challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossil fuels will continue to be used in Europe's power generation as well as in other industrial processes for decades to come. Therefore, the 2050 target can only be achieved if the emissions from fossil fuel combustion in the power generation sector and energy intensive industries are eliminated from the system. This will require the application of Carbon Capture and Storage (CCS). The assessments made in the context of the EU's Roadmap for the transition to a competitive low carbon economy in 2050 and the Energy Roadmap 2050 see CCS as an important technology contributing to decarbonisation scenarios in the EU, with 7% to 32% of all power generation using CCS by 2050. The application of CCS to industrial sectors other than power (e.g. steel, cement, lime, chemical industry, refining) is expected to deliver half of the global emissions reduction from CCS by 2050. In the near future, these industrial applications will open up new opportunities and avenues for CCS that can accelerate its deployment. For all applications, the demonstration... ver más

Scope:Specific challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossil fuels will continue to be used in Europe's power generation as well as in other industrial processes for decades to come. Therefore, the 2050 target can only be achieved if the emissions from fossil fuel combustion in the power generation sector and energy intensive industries are eliminated from the system. This will require the application of Carbon Capture and Storage (CCS). The assessments made in the context of the EU's Roadmap for the transition to a competitive low carbon economy in 2050 and the Energy Roadmap 2050 see CCS as an important technology contributing to decarbonisation scenarios in the EU, with 7% to 32% of all power generation using CCS by 2050. The application of CCS to industrial sectors other than power (e.g. steel, cement, lime, chemical industry, refining) is expected to deliver half of the global emissions reduction from CCS by 2050. In the near future, these industrial applications will open up new opportunities and avenues for CCS that can accelerate its deployment. For all applications, the demonstration of CO2 storage is of major importance. Therefore, two key challenges in the short-term for driving CCS to deployment are geological storage and the application of CCS to industrial sectors other than power, including bio-CCS.

Scope: Proposals should address one of the respective key challenges as presented above, or a combination of them. Focus should be on progressing technologies that already reached TRL 4-5 to TRL 6 (please see part G of the General Annexes).  For geological storage, projects should enable, under "real life" conditions, the development and demonstration of best practices for the entire storage cycle, from site characterisation to operation, risk assessment, monitoring and mitigation/remediation of leakage, and including education and training. Knowledge sharing as well as early and sustained engagement of the local community is essential. In line with the Union’s strategy for international cooperation in research and innovation[1] international cooperation is encouraged, in particular collaboration activities between EU project(s) under this topic and non-EU projects (e.g. from Australia and/or North-America). For industrial applications, proposals should aim at integrating CCS technology in the best possible way so as to optimise the use of energy in the capture process, minimise process efficiency losses, achieve a suitable CO2 purity for transport and storage, and maintain the quality of the industrial end product. Piloting under realistic conditions is required to significantly lower the energy penalty and capture costs. Collaboration with industrial end users is essential. Knowledge sharing as well as early and sustained engagement of the local community is essential.

For geological storage, the Commission considers that proposals requesting a contribution from the EU of between EUR 9 to 16 million would allow this specific challenge to be addressed appropriately.

For industrial applications, proposals requesting a contribution from the EU of between EUR 4 to 9 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

Expected impact: Demonstration of safe and environmentally sound CO2 storage will play a key role in optimising the safe operation of storage sites and in fine-tuning regulatory issues, in promoting confidence in CO2 storage and building public awareness of CCS. The cost- and resource-effective application of CCS in industrial operations will expand the available options for CCS and provide a stepping stone to its wider deployment. Pilot-scale demonstration projects should contribute to accelerating the development and deployment of CCS through an enhanced and effective cooperation in research and innovation between various stakeholders and Member States, thereby allowing a more efficient use and stronger leverage of financial resources and promoting knowledge sharing.

Type of action: Research & Innovation Actions

[1] COM(2012)497


Cross-cutting Priorities:International cooperation


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Specific challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossil fuels will continue to be used in Europe's power generation as well as in other industrial processes for decades to come. Therefore, the 2050 target can only be achieved if the emissions from fossil fuel combustion in the power generation sector and energy intensive industries are eliminated from the system. This will require the application of Carbon Capture and Storage (CCS). The assessments made in the context of the EU's Roadmap for the transition to a competitive low carbon economy in 2050 and the Energy Roadmap 2050 see CCS as an important technology contributing to decarbonisation scenarios in the EU, with 7% to 32% of all power generation using CCS by 2050. The application of CCS to industrial sectors other than power (e.g. steel, cement, lime, chemical industry, refining) is expected to deliver half of the global emissions reduction from CCS by 2050. In the near future, these industrial applications will open up new opportunities and avenues for CCS that can accelerate its deployment. For all applications, the demonstration of CO2 storage is of major importance. Therefore, two key challenges in the short-term for driving CCS to deployment are geological storage and the application of CCS to industrial sectors other than power, including bio-CCS. Scope:Specific challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossil fuels will continue to be used in Europe's power generation as well as in other industrial processes for decades to come. Therefore, the 2050 target can only be achieved if the emissions from fossil fuel combustion in the power generation sector and energy intensive industries are eliminated from the system. This will require the application of Carbon Capture and Storage (CCS). The assessments made in the context of the EU's Roadmap for the transition to a competitive low carbon economy in 2050 and the Energy Roadmap 2050 see CCS as an important technology contributing to decarbonisation scenarios in the EU, with 7% to 32% of all power generation using CCS by 2050. The application of CCS to industrial sectors other than power (e.g. steel, cement, lime, chemical industry, refining) is expected to deliver half of the global emissions reduction from CCS by 2050. In the near future, these industrial applications will open up new opportunities and avenues for CCS that can accelerate its deployment. For all applications, the demonstration of CO2 storage is of major importance. Therefore, two key challenges in the short-term for driving CCS to deployment are geological storage and the application of CCS to industrial sectors other than power, including bio-CCS.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
1. List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme..
2. Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
3. Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme
3.2 Guide to the submission and evaluation process
4. Proposal page limits and layout: Please refer to Part B of the standard proposal template.
5. Indicative timeline for evaluation and grant management:
Information on the outcome of two-stage evaluation:
- For stage 1: maximum 3 months from the final date for submission.
- For stage 2: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants of the stage 2.
6. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Research and Innovation Action:
Specific provisions and funding rates
Standard proposal template
Standard evaluation form
Annotated Model Grant Agreement
7. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topi...
Please read carefully all provisions below before the preparation of your application.
1. List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme..
2. Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
3. Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme
3.2 Guide to the submission and evaluation process
4. Proposal page limits and layout: Please refer to Part B of the standard proposal template.
5. Indicative timeline for evaluation and grant management:
Information on the outcome of two-stage evaluation:
- For stage 1: maximum 3 months from the final date for submission.
- For stage 2: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants of the stage 2.
6. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Research and Innovation Action:
Specific provisions and funding rates
Standard proposal template
Standard evaluation form
Annotated Model Grant Agreement
7. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
8. Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-LCE-2014-2015 Enabling decarbonisation of the fossil fuel-based power sector and energy intensive industry through CCS Scope:Specific challenge:The EU is committed to an overall reduction of greenhouse gas emissions of at least 80% by 2050. Nonetheless, fossi...
Sin info.
LCE-03-2014 Demonstration of renewable electricity and heating/cooling technologies
en consorcio:
Cerrada hace 3 años | Próxima convocatoria prevista para el mes de
LCE-Prize-CO2Reuse-01-2016 Horizon prize for CO2 reuse
en consorcio: Specific Challenge:Preventing dangerous climate change is a key priority for the European Union. Europe is working hard to cut its greenhous...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de
LCE-Prize-RenewableHospital-01-2016 Horizon prize for a Combined Heat and Power (CHP) Installation in a hospital using 100% Renewable Energy Sources
en consorcio: Specific Challenge:The integration and use of renewable energy in buildings for heat and power generation still encounter unsolved technolog...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de
LCE-Prize-PhotovoltaicsHistory-01-2016 Horizon prize for Integrated Photovoltaic System in European Protected Historic Urban districts
en consorcio: Specific Challenge:In Europe, architectural and planning rules for protected historic buildings lead to major technical constrains in integr...
Cerrada hace 6 años | Próxima convocatoria prevista para el mes de
LCE-20-2016-2017 Enabling pre-commercial production of advanced aviation biofuel
en consorcio:
Cerrada hace 7 años | Próxima convocatoria prevista para el mes de