Innovating Works
LCE-18-2017
EGS in different geological conditions
Specific Challenge:Geothermal resources at medium-high temperature can produce at competitive costs electricity, heat or a combination of both. Routinely created enhanced geothermal systems (EGS) offer the opportunity to produce geothermal energy throughout Europe, including in locations where natural reservoirs are not available. In order to increase the number of geothermal installations, enhanced geothermal systems (EGS) have to be demonstrated as cost-competitive whereby innovative solutions are needed to allow for applications in geologic systems with different characteristics and of different origin.
Sólo fondo perdido 10M €
European
This call is closed This line is already closed so you can't apply. It closed last day 07-09-2017.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Luckily, we have achieved the list of financed projects!
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos: project objective:

Specific Challenge:Geothermal resources at medium-high temperature can produce at competitive costs electricity, heat or a combination of both. Routinely created enhanced geothermal systems (EGS) offer the opportunity to produce geothermal energy throughout Europe, including in locations where natural reservoirs are not available. In order to increase the number of geothermal installations, enhanced geothermal systems (EGS) have to be demonstrated as cost-competitive whereby innovative solutions are needed to allow for applications in geologic systems with different characteristics and of different origin.


Scope:Proposals should aim at testing EGS systems to ensure reservoir productivity in different geological settings and energy production at competitive costs. Proposals could propose up-scaling existing EGS systems.

TRL 7 shall be achieved at the end of project activities (please see part G of the General Annexes).

Opening the project's test sites, pilot and demonstration facilities, or research infrastructures for practice oriented education, training or knowledge exchange is encouraged.

The Commission considers th... see more

Specific Challenge:Geothermal resources at medium-high temperature can produce at competitive costs electricity, heat or a combination of both. Routinely created enhanced geothermal systems (EGS) offer the opportunity to produce geothermal energy throughout Europe, including in locations where natural reservoirs are not available. In order to increase the number of geothermal installations, enhanced geothermal systems (EGS) have to be demonstrated as cost-competitive whereby innovative solutions are needed to allow for applications in geologic systems with different characteristics and of different origin.


Scope:Proposals should aim at testing EGS systems to ensure reservoir productivity in different geological settings and energy production at competitive costs. Proposals could propose up-scaling existing EGS systems.

TRL 7 shall be achieved at the end of project activities (please see part G of the General Annexes).

Opening the project's test sites, pilot and demonstration facilities, or research infrastructures for practice oriented education, training or knowledge exchange is encouraged.

The Commission considers that proposals requesting a contribution from the EU of between EUR 6 to 10 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.


Expected Impact:The actions will provide the data and the experience required to lower the costs for geothermal electricity and heat production in different geological conditions applying the EGS technology. The action will contribute to increase the penetration of geothermal energy by demonstrating the viability of EGS.


see less

Temáticas Obligatorias del proyecto: Temática principal: Renewable energy sources - general Geothermal

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño por participante: Duración:
Requisitos técnicos: Specific Challenge:Geothermal resources at medium-high temperature can produce at competitive costs electricity, heat or a combination of both. Routinely created enhanced geothermal systems (EGS) offer the opportunity to produce geothermal energy throughout Europe, including in locations where natural reservoirs are not available. In order to increase the number of geothermal installations, enhanced geothermal systems (EGS) have to be demonstrated as cost-competitive whereby innovative solutions are needed to allow for applications in geologic systems with different characteristics and of different origin. Specific Challenge:Geothermal resources at medium-high temperature can produce at competitive costs electricity, heat or a combination of both. Routinely created enhanced geothermal systems (EGS) offer the opportunity to produce geothermal energy throughout Europe, including in locations where natural reservoirs are not available. In order to increase the number of geothermal installations, enhanced geothermal systems (EGS) have to be demonstrated as cost-competitive whereby innovative solutions are needed to allow for applications in geologic systems with different characteristics and of different origin.
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
IMPORTANT: Please also read the introductory policy context for the activity RENEWABLE ENERGY TECHNOLOGIES of the COMPETITIVE LOW CARBON ENERGY call under the Societal Challenge 3 'Secure, Clean and Efficient Energy' of the Work Programme 2016 - 2017.
 
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Submission and evaluation process: Guide to the submission and evaluation process.
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for sub...
Please read carefully all provisions below before the preparation of your application.
IMPORTANT: Please also read the introductory policy context for the activity RENEWABLE ENERGY TECHNOLOGIES of the COMPETITIVE LOW CARBON ENERGY call under the Societal Challenge 3 'Secure, Clean and Efficient Energy' of the Work Programme 2016 - 2017.
 
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
Note also that a number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Submission and evaluation process: Guide to the submission and evaluation process.
      
Indicative timetable for evaluation and grant agreement:
Information on the outcome of single-stage evaluation: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Innovation Action:
Specific provisions and funding rates
Proposal templates are available after entering the submission tool below.
Standard evaluation form
H2020 General MGA -Multi-Beneficiary
Annotated Grant Agreement
 
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
 
Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in annex L of the Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
- Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs.
- Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
 
Additional documents
H2020 Work Programme 2016-17: Introduction
H2020 Work Programme 2016-17: Secure, clean and efficient energy
H2020 Work Programme 2016-17: Dissemination, Exploitation and Evaluation
H2020 Work Programme 2016-17: General Annexes
Legal basis: Horizon 2020 - Regulation of Establishment 
Legal basis: Horizon 2020 Rules for Participation
Legal basis: Horizon 2020 Specific Programme
 
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
The total budget of the call amounts to
total budget de la convocatoria.
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-LCE-2016-2017 EGS in different geological conditions Specific Challenge:Geothermal resources at medium-high temperature can produce at competitive costs electricity, heat or a combination of bo...
Sin info.
LCE-03-2014 Demonstration of renewable electricity and heating/cooling technologies
en consorcio:
Cerrada does 3 years | next call scheduled for the month of
LCE-Prize-CO2Reuse-01-2016 Horizon prize for CO2 reuse
en consorcio: Specific Challenge:Preventing dangerous climate change is a key priority for the European Union. Europe is working hard to cut its greenhous...
Cerrada does 6 years | next call scheduled for the month of
LCE-Prize-RenewableHospital-01-2016 Horizon prize for a Combined Heat and Power (CHP) Installation in a hospital using 100% Renewable Energy Sources
en consorcio: Specific Challenge:The integration and use of renewable energy in buildings for heat and power generation still encounter unsolved technolog...
Cerrada does 6 years | next call scheduled for the month of
LCE-Prize-PhotovoltaicsHistory-01-2016 Horizon prize for Integrated Photovoltaic System in European Protected Historic Urban districts
en consorcio: Specific Challenge:In Europe, architectural and planning rules for protected historic buildings lead to major technical constrains in integr...
Cerrada does 6 years | next call scheduled for the month of
LCE-20-2016-2017 Enabling pre-commercial production of advanced aviation biofuel
en consorcio:
Cerrada does 7 years | next call scheduled for the month of