Innovating Works
ECSEL-07-2015
Design Technology
Scope:Design Technology topic focusses on effective design methods and technologies capable of
Sólo fondo perdido 0 €
European
This call is closed This line is already closed so you can't apply. It closed last day 12-05-2015.
An upcoming call for this aid is expected, the exact start date of call is not yet clear.
Luckily, we have achieved the list of financed projects!
Presentation: Consortium Consortium: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Minimum number of participants.
This aid finances Proyectos: project objective:

Scope:Design Technology topic focusses on effective design methods and technologies capable of

transforming ideas and requirements efficiently into innovative, producible, and testable products, at whatever level in the value chain. It aims at increase of productivity, reducing development costs and time-to-market, according to the level of targeted requirements such as quality, performance, cost and energy efficiency, safety, security, and reliability.

Four challenges are addressed:

1) Technologies for Model-Based and Virtual Engineering

2) Managing complexity, safety and security

3) Managing diversity

4) Increasing yield, robustness and reliability, and generate system openness


Temáticas Obligatorias del proyecto: Temática principal: Simulation engineering and modelling Semiconductors components systems Cyber-physical systems Systems of systems Electronic components Semiconductors

Consortium characteristics

Scope European : The aid is European, you can apply to this line any company that is part of the European Community.
Tipo y tamaño de organizaciones: The necessary consortium design for the processing of this aid needs:

characteristics of the Proyecto

Requisitos de diseño por participante: Duración:
Requisitos técnicos: Scope:Design Technology topic focusses on effective design methods and technologies capable of Scope:Design Technology topic focusses on effective design methods and technologies capable of
Do you want examples? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Financial Chapters: The chapters of financing expenses for this line are:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Madurez tecnológica: The processing of this aid requires a minimum technological level in the project of TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Characteristics of financing

Intensidad de la ayuda: Sólo fondo perdido + info
Lost Fund:
 
Please read carefully all provisions below before the preparation of your application.
The budget breakdown for this call is given in the call conditions section of the work programme: ECSEL JU Work Plan 2015.
Please visit ECSEL JU web site http://www.ecsel-ju.eu for the most up to date budget figures of the ECSEL Participating States commitments.
1. List of countries and applicable rules for funding: described in part A of the Annexes of the ECSEL JU Work Plan 2015.
2. Eligibility and admissibility conditions: described in part B of the Annexes of the ECSEL JU Work Plan 2015.
Eligibility conditions are described in the ECSEL JU Work Plan 2015 under the heading “Call ECSEL-2015-2 IA – Eligibility Conditions”
 
3. Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part H of the Annexes of the ECSEL Work Plan 2015 describes the details of the evaluation and selection process
The evaluation criteria, scoring and threshold are described in the ECSEL JU Work Plan 2015 under the heading “CALL ECSEL-2014-2 IA – Evaluation criteria, scoring and threshold”
3.2 Guide to the submission and evaluation process
ECSEL Calls 2015 – Guide for applicants
4. Proposal page limits and layout: Please refer to Part B of the proposal template.
5. Indicative timetable for evaluation and grant agreement:  
Please read carefully all provisions below before the preparation of your application.
The budget breakdown for this call is given in the call conditions section of the work programme: ECSEL JU Work Plan 2015.
Please visit ECSEL JU web site http://www.ecsel-ju.eu for the most up to date budget figures of the ECSEL Participating States commitments.
1. List of countries and applicable rules for funding: described in part A of the Annexes of the ECSEL JU Work Plan 2015.
2. Eligibility and admissibility conditions: described in part B of the Annexes of the ECSEL JU Work Plan 2015.
Eligibility conditions are described in the ECSEL JU Work Plan 2015 under the heading “Call ECSEL-2015-2 IA – Eligibility Conditions”
 
3. Evaluation
3.1 Evaluation criteria and procedure, scoring and threshold: described in part H of the Annexes of the ECSEL Work Plan 2015 describes the details of the evaluation and selection process
The evaluation criteria, scoring and threshold are described in the ECSEL JU Work Plan 2015 under the heading “CALL ECSEL-2014-2 IA – Evaluation criteria, scoring and threshold”
3.2 Guide to the submission and evaluation process
ECSEL Calls 2015 – Guide for applicants
4. Proposal page limits and layout: Please refer to Part B of the proposal template.
5. Indicative timetable for evaluation and grant agreement:
Information on the outcome of two-stage evaluation: maximum 5 months from the final date for submission, and for successful proposals a maximum of eight months period from the deadline for the submission of complete proposals until the signature of grant agreements.
6. Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Specific provisions and funding rates described in the ECSEL Work Plan 2015:
- CALL ECSEL-2015-1 RIA – Specific conditions
- Reimbursement rate ECSEL JU
- Work Plan 2015 Annex G for reimbursement rates by national authorities
Standard proposal template: Part B Template ECSEL JU 2015 v2 0
Standard evaluation form
ECSEL Model Grant Agreement
7. Additional provisions:
Horizon 2020 budget flexibility
Classified information - described in Annex D of the ECSEL JU Work Plan 2015
Technology readiness levels (TRL) – the definitions described in Annex C of the ECSEL JU Work Plan 2015 apply
Financial support to Third Parties – the provisions described in Annex E of the ECSEL JU Work Plan 2015 apply.
8. Open access must be granted to all scientific publications resulting from Horizon 2020 actions, and proposals must refer to measures envisaged. Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
9. JTIs additional documents
PAB 2015.09 - Launch call 2015_EN
ECSEL JU Multi Annual Strategic Plan
ECSEL JU Regulation of establishment
 
Guarantees:
does not require guarantees
No existen condiciones financieras para el beneficiario.

Additional information about the call

incentive effect: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
non -competitive competitive Very competitive
We do not know the total budget of the line
minimis: Esta línea de financiación NO considera una “ayuda de minimis”. You can consult the regulations here.

other advantages

SME seal: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-ECSEL-2015-1-RIA-two-stage-Master Design Technology Scope:Design Technology topic focusses on effective design methods and technologies capable of transforming ideas and requirements efficie...
Sin info.
ECSEL-2020-3-IMI-ECSEL IMI-ECSEL Joint Activity Trials@Home
en consorcio:
Cerrada does 4 years | next call scheduled for the month of
ECSEL-2020-4-CSA Digital Excellence
en consorcio:
Cerrada does 5 years | next call scheduled for the month of
ECSEL-2020-2-RIA ECSEL-2020-2-RIA
en consorcio:
Cerrada does 5 years | next call scheduled for the month of
ECSEL-2020-1-IA ECSEL-IA
en consorcio:
Cerrada does 5 years | next call scheduled for the month of
ECSEL-2018-2-RIA Copernicus market uptake
en consorcio:
Cerrada does 5 years | next call scheduled for the month of