Innovating Works
LC-SC3-RES-17-2019
LC-SC3-RES-17-2019: Demonstration of solutions based on renewable sources that provide flexibility to the energy system
Specific Challenge:: Supporting the power grid balancing and increasing the flexibility of the energy system is possible by means of dispatchable renewable energy sources. The specific challenge is to increase the potential of renewable dispatchable technologies in providing flexibility to the energy system. Different technologies are suitable to address this challenge.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 11-12-2018.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:: Supporting the power grid balancing and increasing the flexibility of the energy system is possible by means of dispatchable renewable energy sources. The specific challenge is to increase the potential of renewable dispatchable technologies in providing flexibility to the energy system. Different technologies are suitable to address this challenge.


Scope:Proposals will address one of the following sub-topics:

Intermediate bioenergy carriers: Focus will be on the demonstration of the most cost-efficient intermediate bioenergy carrier pathways for energy and transport, which improve the economic viability of the subsequent energy production by addressing solid, liquid and gaseous intermediate bioenergy carriers from biogenic residues and wastes with increased energy density, storage and trade characteristics where relevant. Reduced conversion costs and improved energy efficiency and GHG performance of the intermediate bioenergy carrier pathway will be demonstrated. Production at a scale of up to 5000 tons and process feasibility through applications to fuel production including for the heavy duty, maritime and aviation sectors... ver más

Specific Challenge:: Supporting the power grid balancing and increasing the flexibility of the energy system is possible by means of dispatchable renewable energy sources. The specific challenge is to increase the potential of renewable dispatchable technologies in providing flexibility to the energy system. Different technologies are suitable to address this challenge.


Scope:Proposals will address one of the following sub-topics:

Intermediate bioenergy carriers: Focus will be on the demonstration of the most cost-efficient intermediate bioenergy carrier pathways for energy and transport, which improve the economic viability of the subsequent energy production by addressing solid, liquid and gaseous intermediate bioenergy carriers from biogenic residues and wastes with increased energy density, storage and trade characteristics where relevant. Reduced conversion costs and improved energy efficiency and GHG performance of the intermediate bioenergy carrier pathway will be demonstrated. Production at a scale of up to 5000 tons and process feasibility through applications to fuel production including for the heavy duty, maritime and aviation sectors, as well as to combined heat and power generation, are to be included. Hydropower: Focus will be on the improvement of the average annual overall efficiency of hydroelectric machinery. Projects are expected to provide high availability of hydropower plants and to maximise performance of hydropower plants of all sizes. The aim is adapting to variable speed generation the hydropower plants (new, refurbished and uprated and especially existing ones); it is important that by optimising maintenance intervals for all hydro plants (especially those delivering balancing power because of the related dynamic operation, dynamic loads and increased wear and tear) the outage time will be minimised. Digitalisation measures to increase the potential of hydropower in providing flexibility to the energy system can be included. Thermal energy storage in Concentrated Solar Power (CSP) plants: The focus will be on the demonstration of innovative storage systems for CSP plants. The thermal energy storage solutions proposed will have to achieve much higher storage densities than current mainstream solutions (i.e. at least two times higher) while guaranteeing similar performance in terms of cycles. Proposals are expected to bring the technology from TRL 5 to TRL 7 (please see part G of the General Annexes).

The Commission considers that proposals requesting a contribution from the EU of between EUR 12 to 15 million would allow this challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.


Expected Impact:The developed technologies will allow plant and system operators to operate successfully in the modern power markets and to make a significant contribution to European renewable energy objectives and policies.


Cross-cutting Priorities:Clean Energy


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:: Supporting the power grid balancing and increasing the flexibility of the energy system is possible by means of dispatchable renewable energy sources. The specific challenge is to increase the potential of renewable dispatchable technologies in providing flexibility to the energy system. Different technologies are suitable to address this challenge. Specific Challenge:: Supporting the power grid balancing and increasing the flexibility of the energy system is possible by means of dispatchable renewable energy sources. The specific challenge is to increase the potential of renewable dispatchable technologies in providing flexibility to the energy system. Different technologies are suitable to address this challenge.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme.
 
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme.
Submission and evaluation processes are described in the Online Manual.
In order to ensure that a balanced portfolio of activities covering different renewable energy technology areas will be supported, the available budget will be firstly allocated to the proposal with the highest score, passing all thresholds, in each of the sub-topics. In a second round, proposals will be selected for funding regardless of the sub-topic and only according to the single ranking list of this topic.
4. Indicative time for evaluation and grant agreements:
Information on the outcome of evaluation (single-stage call): maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
Information on the outcome o...
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme.
 
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme.
Submission and evaluation processes are described in the Online Manual.
In order to ensure that a balanced portfolio of activities covering different renewable energy technology areas will be supported, the available budget will be firstly allocated to the proposal with the highest score, passing all thresholds, in each of the sub-topics. In a second round, proposals will be selected for funding regardless of the sub-topic and only according to the single ranking list of this topic.
4. Indicative time for evaluation and grant agreements:
Information on the outcome of evaluation (single-stage call): maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
Information on the outcome of evaluation (two-stage call):
For stage 1: maximum 3 months from the deadline for submission.
For stage 2: maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
5. Proposal templates, evaluation forms and model grant agreements (MGA):
Innovation Action:
Specific provisions and funding rates
Standard proposal template
Standard evaluation form
General MGA - Multi-Beneficiary
Annotated Grant Agreement
6. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply
Members of consortium are required to conclude a consortium agreement, in principle prior to the signature of the grant agreement.
8. Additional documents:
1. Introduction WP 2018-20
10. Secure, clean and efficient energy WP 2018-20
18. Dissemination, Exploitation and Evaluation WP 2018-20
General annexes to the Work Programme 2018-2020
Legal basis: Horizon 2020 Regulation of Establishment
Legal basis: Horizon 2020 Rules for Participation
Legal basis: Horizon 2020 Specific Programme
7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in Annex L of the Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs. See the Online Manual.
Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-LC-SC3-2018-2019-2020 Demonstration of solutions based on renewable sources that provide flexibility to the energy system Specific Challenge:: Supporting the power grid balancing and increasing the flexibility of the energy system is possible by means of dispatc...
Sin info.
LC-SC3-RES-34-2020 Demonstration of innovative and sustainable hydropower solutions targeting unexplored small-scale hydropower potential in Central Asia
en consorcio: Specific Challenge:The challenge is to demonstrate innovative solutions targeting unexploited small-scale hydropower potential in Central As...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
LC-SC3-RES-20-2020 Efficient combination of Concentrated Solar Power and desalination (with particular focus on the Gulf Cooperation Council (GCC) region)
en consorcio: Specific Challenge:Several arid and semi-arid regions of the world are highly dependent on desalination and the demand for desalination is p...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
LC-SC3-RES-36-2020 International cooperation with Canada on advanced biofuels and bioenergy
en consorcio: Specific Challenge:The optimisation of advanced biomass supply chains and overcoming specific conversion technology barriers are needed to i...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
LC-SC3-RES-25-2020 International cooperation with Japan for Research and Innovation on advanced biofuels and alternative renewable fuels
en consorcio: Specific Challenge:Disruptive conversion technologies are needed for replacing completely the use of fossil fuels in the transport and heati...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de
LC-SC3-RES-3-2020 International Cooperation with USA and/or China on alternative renewable fuels from sunlight for energy, transport and chemical storage
en consorcio: Specific Challenge:Decarbonisation of the energy and transport systems requires the ultimate replacement of fossil fuels in the long-term an...
Cerrada hace 4 años | Próxima convocatoria prevista para el mes de