Innovating Works
EE-06-2015
EE-06-2015: Demand response in blocks of buildings
Scope:Specific challenge: demand response enables end users to participate actively in energy markets and profit from optimal price conditions, making the grid (heat, cold, electricity) more efficient and contributing to the integration of renewable energy sources. The Energy Efficiency Directive adopted in 2012 contains provisions to encourage market actors to facilitate demand response. At the building level, increasing use of energy management technologies for both thermal and electric loads will act as an enabler for the deployment of demand response in both residential and non-residential buildings (e.g. offices). Such systems may be integrated with thermic/electric storage technologies and micro combined heat and power installations (CHP). Considering the important contribution of buildings and occupants to energy efficiency, there is therefore a need for ensuring that buildings have proper energy management systems in place to ensure consumers' engagement and demand response activations.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 04-06-2015.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Specific challenge: demand response enables end users to participate actively in energy markets and profit from optimal price conditions, making the grid (heat, cold, electricity) more efficient and contributing to the integration of renewable energy sources. The Energy Efficiency Directive adopted in 2012 contains provisions to encourage market actors to facilitate demand response. At the building level, increasing use of energy management technologies for both thermal and electric loads will act as an enabler for the deployment of demand response in both residential and non-residential buildings (e.g. offices). Such systems may be integrated with thermic/electric storage technologies and micro combined heat and power installations (CHP). Considering the important contribution of buildings and occupants to energy efficiency, there is therefore a need for ensuring that buildings have proper energy management systems in place to ensure consumers' engagement and demand response activations.

Scope: At the level of a block of buildings, the focus should be on real time optimisation of energy demand, storage and supply (including self-production when applicable)... ver más

Scope:Specific challenge: demand response enables end users to participate actively in energy markets and profit from optimal price conditions, making the grid (heat, cold, electricity) more efficient and contributing to the integration of renewable energy sources. The Energy Efficiency Directive adopted in 2012 contains provisions to encourage market actors to facilitate demand response. At the building level, increasing use of energy management technologies for both thermal and electric loads will act as an enabler for the deployment of demand response in both residential and non-residential buildings (e.g. offices). Such systems may be integrated with thermic/electric storage technologies and micro combined heat and power installations (CHP). Considering the important contribution of buildings and occupants to energy efficiency, there is therefore a need for ensuring that buildings have proper energy management systems in place to ensure consumers' engagement and demand response activations.

Scope: At the level of a block of buildings, the focus should be on real time optimisation of energy demand, storage and supply (including self-production when applicable) using intelligent energy management systems with the objective of reducing the difference between peak power demand and minimum night time demand, thus reducing costs and greenhouse gas emissions. Cost-effective and interoperable solutions that do not compromise the comfort of occupants should be demonstrated for a block of buildings consisting of at least 3 different buildings in real life operating conditions. Solutions should be compatible with smart grids and open international standards and with the distribution network infrastructure.

The activities are expected to be implemented at TRL 6-7 (please see part G of the General Annexes).

The Commission considers that proposals requesting a contribution from the EU of between EUR 3 and 5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

Expected impact: Proposals showing that demand response can be implemented at the level of blocks of buildings with the help of intelligent energy management systems and without unreasonable effort and complexity while triggering substantial energy and cost savings. Moreover, proposals that shed light on the added value of installing demand response facilities for building blocks instead of individual buildings and on the willingness of consumers to participate in demand response solutions. Impacts should be measured in energy and cost savings. Impacts should also be measured for the willingness and capability of consumers to participate in demand response solutions.

Type of action: Innovation Actions


Cross-cutting Priorities:Socio-economic science and humanities


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Specific challenge: demand response enables end users to participate actively in energy markets and profit from optimal price conditions, making the grid (heat, cold, electricity) more efficient and contributing to the integration of renewable energy sources. The Energy Efficiency Directive adopted in 2012 contains provisions to encourage market actors to facilitate demand response. At the building level, increasing use of energy management technologies for both thermal and electric loads will act as an enabler for the deployment of demand response in both residential and non-residential buildings (e.g. offices). Such systems may be integrated with thermic/electric storage technologies and micro combined heat and power installations (CHP). Considering the important contribution of buildings and occupants to energy efficiency, there is therefore a need for ensuring that buildings have proper energy management systems in place to ensure consumers' engagement and demand response activations. Scope:Specific challenge: demand response enables end users to participate actively in energy markets and profit from optimal price conditions, making the grid (heat, cold, electricity) more efficient and contributing to the integration of renewable energy sources. The Energy Efficiency Directive adopted in 2012 contains provisions to encourage market actors to facilitate demand response. At the building level, increasing use of energy management technologies for both thermal and electric loads will act as an enabler for the deployment of demand response in both residential and non-residential buildings (e.g. offices). Such systems may be integrated with thermic/electric storage technologies and micro combined heat and power installations (CHP). Considering the important contribution of buildings and occupants to energy efficiency, there is therefore a need for ensuring that buildings have proper energy management systems in place to ensure consumers' engagement and demand response activations.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
 
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Guide to the submission and evaluation process
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
 
Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Innovation Action:
Specific provisions and funding rates
Standard proposal template (administrative forms and structure of technical annex)
Standard evaluation form
Annotated Model Grant Agreement
 
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Tec...
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
 
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Guide to the submission and evaluation process
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
 
Indicative timetable for evaluation and grant agreement:
Information on the outcome of one-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Innovation Action:
Specific provisions and funding rates
Standard proposal template (administrative forms and structure of technical annex)
Standard evaluation form
Annotated Model Grant Agreement
 
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
 
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-EE-2014-2015 Demand response in blocks of buildings Scope:Specific challenge: demand response enables end users to participate actively in energy markets and profit from optimal price conditio...
Sin info.
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2022-SEE-01 Sustainable growth and building resilience in tourism – empowering SMEs to carry out the twin transition
Cerrada hace 7 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 7 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 9 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2023-EENEE-01 Enterprise Europe Network Energy Efficiency Action
en consorcio:
Cerrada hace 9 meses | Próxima convocatoria prevista para el mes de