Innovating Works
HORIZON-ER-JU-2023-EXPLR-...
HORIZON-ER-JU-2023-EXPLR-06: DAC FLEET RETROFITTING AND RETROFIT CAPACITY PLAN
Expected Outcome:During the past years and within the scope of the S2R freight innovation pillar (IP5), rail stakeholders have been working on the freight Digital Automatic Coupler (DAC). This solution, in addition to the mechanical and pneumatic coupling, will integrate digital communications and energy for the rail freight segment. DAC is an enabler that will enhance the performance and safety of rail freight as it will eliminate manual interventions and, by transmitting data and power through the freight train consist, it will allow addressing the operational gaps to increase the competitiveness of rail freight.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio..
Esta ayuda financia Proyectos:

Expected Outcome:During the past years and within the scope of the S2R freight innovation pillar (IP5), rail stakeholders have been working on the freight Digital Automatic Coupler (DAC). This solution, in addition to the mechanical and pneumatic coupling, will integrate digital communications and energy for the rail freight segment. DAC is an enabler that will enhance the performance and safety of rail freight as it will eliminate manual interventions and, by transmitting data and power through the freight train consist, it will allow addressing the operational gaps to increase the competitiveness of rail freight.

The project stemming from this topic should deliver :

a plan for a full-scale European DAC upgrading/retrofitting of existing freight locomotives and freight wagons;the identification and assessment of the retrofitting capacity, and develop an implementation plan. All project deliverables shall be of Public nature to ensure a broad exploitation of the results and take up in the context of the European DAC Delivery Programme (EDDP)[1].

Scope:The coordinated support action support the Europe’s Rail Joint Undertaking with the needed te... ver más

Expected Outcome:During the past years and within the scope of the S2R freight innovation pillar (IP5), rail stakeholders have been working on the freight Digital Automatic Coupler (DAC). This solution, in addition to the mechanical and pneumatic coupling, will integrate digital communications and energy for the rail freight segment. DAC is an enabler that will enhance the performance and safety of rail freight as it will eliminate manual interventions and, by transmitting data and power through the freight train consist, it will allow addressing the operational gaps to increase the competitiveness of rail freight.

The project stemming from this topic should deliver :

a plan for a full-scale European DAC upgrading/retrofitting of existing freight locomotives and freight wagons;the identification and assessment of the retrofitting capacity, and develop an implementation plan. All project deliverables shall be of Public nature to ensure a broad exploitation of the results and take up in the context of the European DAC Delivery Programme (EDDP)[1].

Scope:The coordinated support action support the Europe’s Rail Joint Undertaking with the needed technical expertise for the development of the above mentioned plans.

The following areas have been identified as key research area to cover the expected outcome. The project stemming from this topic shall address all the following workstreams:

Workstream 1: Fleet retrofitting readiness

The project should collect and analyse the status of wagons and locomotives in operations in Europe. The processed information should consider the number of wagons and locomotives, the usage, the technical state and its retrofitting ability (fleet retrofitting readiness). The project shall deliver a sound assessment on the retrofitting readiness of wagons and locomotives which will serve as the basis for the strategic sector alignment, in the context of the EDDP, on the future DAC deployment plans. The project shall cover for its assessment the following elements (non-exhaustive list):

Locomotives difference between shunting and mainline ones and the possibility to have hybrid coupling or DAC only;Wagons based on the type of traffic (Core Wagonload System (CWS), intermodal,…);TSI compliance and safety level achieved (e.g. inner-coupling for rakes). Workstream 2: DAC Retrofitting capacity plan

The project should identify the required workshop capacity and locations (in Europe), workforce skills for retrofitting of locomotives, freight wagons and other on track machines, as well as the planned/required retrofitting rolling stock quantities. The outputs of the workstream 1 are an important element to take into account in the analysis.

It should also propose a DAC retrofitting plan considering the optimisation of workshop locations and the major sidings/terminals in Europe (e.g. through predominant traffic type) use, and related vehicle fleets. A gap analysis should be performed and required countermeasures analysed, with the aim to propose alternative technical and operational solutions.

The project should develop a comprehensive retrofitting capacity plan, including concrete operational and technical recommendations (including timing) per traffic type (Block Train, Single Wagon Load,…) and concerned fleet. The plan should include (non-exhaustive list):

an allocation of vehicles per retrofitting workshops;an identification of the rolling stock, timing and retrofitting process per type/vehicle;an estimate of the foreseen DAC components quantity required per retrofitting location. Additionally, the project should propose further recommendation based on the analysis on how mobile workshops could cover (in part) the retrofit needs and their impact on:

Retrofitting plan on infrastructure (e.g. buffer stop retrofitting plan, changes needed to shunting yards/sidings and planning).Requirements for the wagons for operations at shunting yards (e.g. uncoupling button or lever at the side). Interactions with other EU-RAIL projects and EU-Missions

The action to be funded under this topic shall:

Take into account the outputs of linked projects from EU-RAIL Flagship Area 5[2] and work together for any potential interfaces.Interact with EU-Rail System Pillar[3] for the aspects related to the TSI compliance aspects and planning and with the European DAC Delivery Programme groups[4], to which is expected to report on a regular basis to the Programme Board and Supervisory Board. Gender dimension

In this topic the integration of the gender dimension (sex and gender analysis) in research and innovation content is not a mandatory requirement.

[1] https://rail-research.europa.eu/european-dac-delivery-programme/

[2] https://projects.rail-research.europa.eu/eurail-fp5/

[3] https://rail-research.europa.eu/system_pillar/

[4] https://projects.shift2rail.org/s2r_ip5_n.aspx?p=6%20EU-DAC

ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: *Presupuesto para cada participante en el proyecto
Requisitos técnicos: Expected Outcome:During the past years and within the scope of the S2R freight innovation pillar (IP5), rail stakeholders have been working on the freight Digital Automatic Coupler (DAC). This solution, in addition to the mechanical and pneumatic coupling, will integrate digital communications and energy for the rail freight segment. DAC is an enabler that will enhance the performance and safety of rail freight as it will eliminate manual interventions and, by transmitting data and power through the freight train consist, it will allow addressing the operational gaps to increase the competitiveness of rail freight. Expected Outcome:During the past years and within the scope of the S2R freight innovation pillar (IP5), rail stakeholders have been working on the freight Digital Automatic Coupler (DAC). This solution, in addition to the mechanical and pneumatic coupling, will integrate digital communications and energy for the rail freight segment. DAC is an enabler that will enhance the performance and safety of rail freight as it will eliminate manual interventions and, by transmitting data and power through the freight train consist, it will allow addressing the operational gaps to increase the competitiveness of rail freight.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Subcontracting costs.
Purchase costs.
Other cost categories.
Indirect costs.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 9:. La tecnología está en su forma final y funciona bajo una amplia gama de condiciones. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
Para el presupuesto subvencionable la intensidad de la ayuda en formato fondo perdido podrá alcanzar como minimo un 100%.
The funding rate for CSA projects is 100 % of the eligible costs for all types of organizations. The funding rate for CSA projects is 100 % of the eligible costs for all types of organizations.
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda no tiene efecto incentivador. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea pero en los últimos 6 meses la línea ha concecido
Total concedido en los últimos 6 meses.
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
HORIZON-JU-ER-2023-01 DAC FLEET RETROFITTING AND RETROFIT CAPACITY PLAN Expected Outcome:During the past years and within the scope of the S2R freight innovation pillar (IP5), rail stakeholders have been working...
Sin info.
HORIZON-ER-JU-2023-EXPLR-02 FUTURE METRO SYSTEMS
en consorcio: Expected Outcome:Metro lines are traditionally operated through a combination of planned levels of demand and of availability of rolling sto...
Cerrada | Próxima convocatoria prevista para el mes de
HORIZON-ER-JU-2023-EXPLR-06 DAC FLEET RETROFITTING AND RETROFIT CAPACITY PLAN
en consorcio: Expected Outcome:During the past years and within the scope of the S2R freight innovation pillar (IP5), rail stakeholders have been working...
Cerrada | Próxima convocatoria prevista para el mes de
HORIZON-ER-JU-2023-EXPLR-05 EXTENDING THE RAIL NETWORK OF PHDS
en consorcio: Expected Outcome:With this Research and Innovation Action, the Europe’s Rail Joint Undertaking intends further extend the rail research and...
Cerrada | Próxima convocatoria prevista para el mes de
HORIZON-ER-JU-2023-EXPLR-03 BIODIVERSITY
en consorcio: Expected Outcome:The Project stemming from this topic should deliver the following outcomes, considering rail as the backbone of the future...
Cerrada | Próxima convocatoria prevista para el mes de
HORIZON-ER-JU-2023-EXPLR-01 NOISE AND VIBRATIONS
en consorcio: Expected Outcome:Railway noise is still the main rail externality and according to the EEA’s Outlook to 2030 report, the number of people wh...
Cerrada | Próxima convocatoria prevista para el mes de
HORIZON-ER-JU-2023-EXPLR-04 DISRUPTIVE ASSETS MANAGEMENT SOLUTIONS, INCLUDING URBAN USE CASES
en consorcio: Expected Outcome:Building upon the work delivered by IP3 in S2R and other research and innovation activities, the Project stemming from this...
Cerrada | Próxima convocatoria prevista para el mes de