Innovating Works
EE-04-2014
EE-04-2014: Construction skills
Scope:Specific challenge: The large contribution expected from the building sector to the 2020 energy objectives is a challenge for the construction industry which needs to be ready to deliver renovations offering high energy performance and new, nearly zero-energy buildings using innovative technologies. Many craftsmen and building workers need up-skilling. Existing qualification schemes, accreditation structures and training incentives are not covering enough energy efficiency and renewable energy issues and are sometimes insufficiently attractive to building workers and employers (especially from SMEs). There is also a need to train architects, engineers, building managers and other building professionals. By promoting 'energy literacy', including integrated design and good operational management practices, these professions can help in closing the gap between energy performance at design stage and operational performance.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 05-06-2014.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Specific challenge: The large contribution expected from the building sector to the 2020 energy objectives is a challenge for the construction industry which needs to be ready to deliver renovations offering high energy performance and new, nearly zero-energy buildings using innovative technologies. Many craftsmen and building workers need up-skilling. Existing qualification schemes, accreditation structures and training incentives are not covering enough energy efficiency and renewable energy issues and are sometimes insufficiently attractive to building workers and employers (especially from SMEs). There is also a need to train architects, engineers, building managers and other building professionals. By promoting 'energy literacy', including integrated design and good operational management practices, these professions can help in closing the gap between energy performance at design stage and operational performance.

Scope:Regarding craftsmen and other on-site workers, including apprentices, proposals should build on the results of the recent BUILD UP Skills initiative, be in line with the European Qualification Framework (EQF), and focus on upgradi... ver más

Scope:Specific challenge: The large contribution expected from the building sector to the 2020 energy objectives is a challenge for the construction industry which needs to be ready to deliver renovations offering high energy performance and new, nearly zero-energy buildings using innovative technologies. Many craftsmen and building workers need up-skilling. Existing qualification schemes, accreditation structures and training incentives are not covering enough energy efficiency and renewable energy issues and are sometimes insufficiently attractive to building workers and employers (especially from SMEs). There is also a need to train architects, engineers, building managers and other building professionals. By promoting 'energy literacy', including integrated design and good operational management practices, these professions can help in closing the gap between energy performance at design stage and operational performance.

Scope:Regarding craftsmen and other on-site workers, including apprentices, proposals should build on the results of the recent BUILD UP Skills initiative, be in line with the European Qualification Framework (EQF), and focus on upgrading or establishing large-scale qualification and training schemes in order to increase the number of skilled building workers. They should be based on the national training roadmaps established in BUILD UP Skills. They may also address coordination and accompanying measures (e.g. voluntary certification schemes, accreditation, mutual recognition, incentives to encourage the participation of craftsmen and to attract women to the construction sector).

Regarding other practitioners, proposals should focus on improving the qualification and skills of middle and senior level building professionals. ICT-based training may be used, building on results from the EU ICT programme.

For financial support to trainees, proposals should link to other sources of funding such as the European Social Fund, including the Youth Guarantee Scheme.

Proposals should as much as possible foster better cooperation between disciplines and link to approved qualifications which are in turn based on industry standards.

Organisational and financial mechanisms should be established to sustain training activities for at least 3 years after the projects’ end.

The Commission considers that proposals requesting a contribution from the EU of between EUR 1 and 1.5 million would allow this specific challenge to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts.

For all proposals, at least three legal entities must participate in the action; each of the three legal entities shall be established in a different eligible country; and all three legal entities shall be independent of each other. However, proposals focusing on upgrading or establishing large-scale qualification and training schemes for craftsmen and other on-site workers, in the continuation of the BUILD UP Skills initiative, may be submitted by one legal entity.

Expected impact: Reduced skills mismatch and increased managerial capacity to support innovation and sustainable energy use in buildings through new leadership and work practices. Improved participation, qualifications and skills for a pool of talented women in the construction sector.

Every million Euro of EU support is expected to increase the skills of at least 2000 craftsmen[1], or 500 construction sector managers[2], resulting in energy savings and/or renewable energy production of at least 25 GWh per year and increasing the employability of the building workforce. In addition projects should explain how they will result in increased investments in innovative sustainable energy technologies.

Type of action: Coordination and Support Actions

[1] Based on the FEEBAT scheme in France.

[2] EUREM.NET and IDES-EDU projects (IEE programme)


Cross-cutting Priorities:Socio-economic science and humanitiesGender


ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Specific challenge: The large contribution expected from the building sector to the 2020 energy objectives is a challenge for the construction industry which needs to be ready to deliver renovations offering high energy performance and new, nearly zero-energy buildings using innovative technologies. Many craftsmen and building workers need up-skilling. Existing qualification schemes, accreditation structures and training incentives are not covering enough energy efficiency and renewable energy issues and are sometimes insufficiently attractive to building workers and employers (especially from SMEs). There is also a need to train architects, engineers, building managers and other building professionals. By promoting 'energy literacy', including integrated design and good operational management practices, these professions can help in closing the gap between energy performance at design stage and operational performance. Scope:Specific challenge: The large contribution expected from the building sector to the 2020 energy objectives is a challenge for the construction industry which needs to be ready to deliver renovations offering high energy performance and new, nearly zero-energy buildings using innovative technologies. Many craftsmen and building workers need up-skilling. Existing qualification schemes, accreditation structures and training incentives are not covering enough energy efficiency and renewable energy issues and are sometimes insufficiently attractive to building workers and employers (especially from SMEs). There is also a need to train architects, engineers, building managers and other building professionals. By promoting 'energy literacy', including integrated design and good operational management practices, these professions can help in closing the gap between energy performance at design stage and operational performance.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
 
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme with the following exceptions:
For all proposals, at least three legal entities must participate in the action; each of the three legal entities shall be established in a different eligible country; and all three entities shall be independent of each other within the meaning of Article 7 of the rules of participation.
The only exception is for proposals focusing on upgrading or estalbishing large-scale qualification and training schemes for craftsmen and other on-site workers, in the continuation of the BUILD UP Skills initiative. These proposals may be submitted by one or more legal entity(ies) from the same country.
 
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Guide to the submission and evaluation process
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Indicative timetable for evaluation and grant agreement:
One-stage evalua...
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the General Work Programme.
 
 
Eligibility and admissibility conditions: described in part B and C of the General Annexes of the General Work Programme with the following exceptions:
For all proposals, at least three legal entities must participate in the action; each of the three legal entities shall be established in a different eligible country; and all three entities shall be independent of each other within the meaning of Article 7 of the rules of participation.
The only exception is for proposals focusing on upgrading or estalbishing large-scale qualification and training schemes for craftsmen and other on-site workers, in the continuation of the BUILD UP Skills initiative. These proposals may be submitted by one or more legal entity(ies) from the same country.
 
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part H of the General Annexes of the General Work Programme.
3.2 Guide to the submission and evaluation process
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template.
 
Indicative timetable for evaluation and grant agreement:
One-stage evaluation: maximum 5 months from the final date for submission.
Signature of grant agreements: maximum 3 months from the date of informing successful applicants.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
Coordination and Support Action:
Specific provisions and funding rates
Standard proposal template (administrative forms and structure of technical annex)
Standard evaluation form
Annotated Model Grant Agreement
 
Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply.
Financial support to Third Parties – where a topic description foresees financial support to Third Parties, these provisions apply.
 
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-EE-2014-2015 Construction skills Scope:Specific challenge: The large contribution expected from the building sector to the 2020 energy objectives is a challenge for the cons...
Sin info.
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2022-SEE-01 Sustainable growth and building resilience in tourism – empowering SMEs to carry out the twin transition
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 6 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2024-SEE-02 Greening SMEs in the proximity and social economy ecosystem through transnational co-operation
en consorcio:
Cerrada hace 9 meses | Próxima convocatoria prevista para el mes de
SMP-COSME-2023-EENEE-01 Enterprise Europe Network Energy Efficiency Action
en consorcio:
Cerrada hace 9 meses | Próxima convocatoria prevista para el mes de