Innovating Works
JTI-CS2-2014-CFP01-LPA-03...
JTI-CS2-2014-CFP01-LPA-03-03: Airline Maintenance Operations implementation of an E2E Maintenance Service Architecture and its enablers
Scope:Multidisciplinary Integration and real-life operational demonstration of E2E Maintenance Services Architecture, enabling effective cooperation between OEMs, suppliers, airlines and MROs featuring solutions with focus on mixed legacy fleet maintenance operations, technology enablers for Integrated Health Monitoring Management solution based on prognostics, maintenance planning and optimization, remote support and maintenance mobile tools/applications and its seamless integration in the existing maintenance operations landscape (incl. MIS  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents"))
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 31-03-2015.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Scope:Multidisciplinary Integration and real-life operational demonstration of E2E Maintenance Services Architecture, enabling effective cooperation between OEMs, suppliers, airlines and MROs featuring solutions with focus on mixed legacy fleet maintenance operations, technology enablers for Integrated Health Monitoring Management solution based on prognostics, maintenance planning and optimization, remote support and maintenance mobile tools/applications and its seamless integration in the existing maintenance operations landscape (incl. MIS  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents"))


Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Scope:Multidisciplinary Integration and real-life operational demonstration of E2E Maintenance Services Architecture, enabling effective cooperation between OEMs, suppliers, airlines and MROs featuring solutions with focus on mixed legacy fleet maintenance operations, technology enablers for Integrated Health Monitoring Management solution based on prognostics, maintenance planning and optimization, remote support and maintenance mobile tools/applications and its seamless integration in the existing maintenance operations landscape (incl. MIS  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents")) Scope:Multidisciplinary Integration and real-life operational demonstration of E2E Maintenance Services Architecture, enabling effective cooperation between OEMs, suppliers, airlines and MROs featuring solutions with focus on mixed legacy fleet maintenance operations, technology enablers for Integrated Health Monitoring Management solution based on prognostics, maintenance planning and optimization, remote support and maintenance mobile tools/applications and its seamless integration in the existing maintenance operations landscape (incl. MIS  Please refer for the full and formal topic description to Annex III of the Clean Sky 2 Work Plan 2014-2015 Amendment nr. 1  Version 3 (see under the tab "Topic Conditions and Documents"))
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
       Clean Sky 2 JU Work Plan 2014/2015.
3.2 Guide to the submission and evaluation process: described in the document "Rules for submission, evaluation, selection, award and review procedures of Calls for Proposals".
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template (to be published before end of January 2015).
 
Indicative timetable for evaluation and grant agreement:
Signature of grant agreements: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
The proposal templates will be available in the submission system (SEP).
Please read carefully all provisions below before the preparation of your application.
List of countries and applicable rules for funding: described in part A of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Eligibility and admissibility conditions: described in part B & C of the general Annexes of the Clean Sky 2 Work Plan 2014-2015.
Clean Sky 2 JU Work Plan 2014/2015.
 
Evaluation
3.1  Evaluation criteria and procedure, scoring and threshold: described in part F of the General Annexes of the Clean Sky 2 Work Plan 2014-2015.
       Clean Sky 2 JU Work Plan 2014/2015.
3.2 Guide to the submission and evaluation process: described in the document "Rules for submission, evaluation, selection, award and review procedures of Calls for Proposals".
 
Proposal page limits and layout: Please refer to Part B of the standard proposal template (to be published before end of January 2015).
 
Indicative timetable for evaluation and grant agreement:
Signature of grant agreements: maximum 8 months from the date of closure of the call.
 
Provisions, proposal templates and evaluation forms for the type(s) of action(s) under this topic:
The proposal templates will be available in the submission system (SEP).
 
Additional provisions:
Clean Sky 2 Budget Flexibility:
See Part G of the General Annexes of the Clean Sky 2 JU Work Plan 2014-2015.
 
 JTIs additional documents
Clean Sky 2 Joint Technical Programme
Clean Sky 2 JU Financial Rules
Clean Sky 2 JU Regulation of establishment
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-CS2-CFP01-2014-01 Airline Maintenance Operations implementation of an E2E Maintenance Service Architecture and its enablers Scope:Multidisciplinary Integration and real-life operational demonstration of E2E Maintenance Services Architecture, enabling effective coo...
Sin info.
JTI-CS2-2014-CFP01-LPA-02-03 Rapid Assembly Of Bracket For Structure-System Integration
en consorcio: Scope:This specific WP is orientated to development, assessment and selection of integrative concepts, which will be completed by specific t...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-LPA-01-02 Support to future CROR and UHBR propulsion system maturation
en consorcio: Scope:This topic consists in a wide scope of activities contributing to the maturation of future CROR and UHBR propulsion system integration...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-LPA-02-05 Environmental Friendly Fire Suppression
en consorcio: Scope:Design, development, and testing of an environmental friendly fire suppression system for aircraft cargo holds. Proof of fire suppress...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-LPA-02-01 Cost Reduction On Composite Structure Assembly – Blind fastener inspection technology for quality control
en consorcio: Scope:The expected outcomes are the definition, development and prototype realization of an innovative inspection monitoring process for spe...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de
JTI-CS2-2014-CFP01-LPA-01-01 OPEN ROTOR Engine Mounting System
en consorcio: Scope:Design , manufacture , assembly and instrumentation of mounts for CROR  Flight Test Demo; Mounts for characterization and flight abili...
Cerrada hace 10 años | Próxima convocatoria prevista para el mes de