Innovating Works
ICT-53-2020
ICT-53-2020: 5G PPP – 5G for Connected and Automated Mobility (CAM)
Specific Challenge:The challenge is to qualify and characterise the latest version of 5G specifications as available from 3G PP release 16 early 2020 (5G NR-V2X and beyond) in the context of advanced use cases deployment in Europe of CAM that may also benefit from Artificial Intelligence (AI) solutions. It targets use cases beyond C-ITS safety applications in view of enabling use cases in the context of complete connectivity-enabled ecosystems around cars and vehicles. It supports the realisation of the strategic objective of having all major transport paths covered with 5G connectivity by 2025[1] through cross-border trials along major transport paths planned for CAM deployment ("5G corridors"[2]) and paves the way towards operational deployment as envisaged with the Connecting Europe Facility proposal[3]. The work is also relevant to cross border railway corridors in view of providing services to trains, including in the context of the planned Future Railways Mobile Communication Systems (FRMCS) planned to replace GSM-R around 2030.
Sólo fondo perdido 0 €
Europeo
Esta convocatoria está cerrada Esta línea ya está cerrada por lo que no puedes aplicar. Cerró el pasado día 13-11-2019.
Se espera una próxima convocatoria para esta ayuda, aún no está clara la fecha exacta de inicio de convocatoria.
Por suerte, hemos conseguido la lista de proyectos financiados!
Presentación: Consorcio Consorcio: Esta ayuda está diseñada para aplicar a ella en formato consorcio.
Número mínimo de participantes.
Esta ayuda financia Proyectos: Objetivo del proyecto:

Specific Challenge:The challenge is to qualify and characterise the latest version of 5G specifications as available from 3G PP release 16 early 2020 (5G NR-V2X and beyond) in the context of advanced use cases deployment in Europe of CAM that may also benefit from Artificial Intelligence (AI) solutions. It targets use cases beyond C-ITS safety applications in view of enabling use cases in the context of complete connectivity-enabled ecosystems around cars and vehicles. It supports the realisation of the strategic objective of having all major transport paths covered with 5G connectivity by 2025[1] through cross-border trials along major transport paths planned for CAM deployment ("5G corridors"[2]) and paves the way towards operational deployment as envisaged with the Connecting Europe Facility proposal[3]. The work is also relevant to cross border railway corridors in view of providing services to trains, including in the context of the planned Future Railways Mobile Communication Systems (FRMCS) planned to replace GSM-R around 2030.


Scope:The validation of the latest available 5G specification in the context of innovative CAM applications under reali... ver más

Specific Challenge:The challenge is to qualify and characterise the latest version of 5G specifications as available from 3G PP release 16 early 2020 (5G NR-V2X and beyond) in the context of advanced use cases deployment in Europe of CAM that may also benefit from Artificial Intelligence (AI) solutions. It targets use cases beyond C-ITS safety applications in view of enabling use cases in the context of complete connectivity-enabled ecosystems around cars and vehicles. It supports the realisation of the strategic objective of having all major transport paths covered with 5G connectivity by 2025[1] through cross-border trials along major transport paths planned for CAM deployment ("5G corridors"[2]) and paves the way towards operational deployment as envisaged with the Connecting Europe Facility proposal[3]. The work is also relevant to cross border railway corridors in view of providing services to trains, including in the context of the planned Future Railways Mobile Communication Systems (FRMCS) planned to replace GSM-R around 2030.


Scope:The validation of the latest available 5G specification in the context of innovative CAM applications under realistic conditions and seamlessly functioning across borders. This is realised through cross-border trials along 5G corridors[4] covering significant portions of roads or railways and including the core technological innovation expected from 5G release 16 including positioning services, or beyond. Relevant work takes a broad innovation perspective covering use cases in the vehicle-to-vehicle (V2V), vehicle-to-infrastructure (V2I), vehicle-to-pedestrian (V2P), and vehicle-to-network (V2N) domains including the supporting service infrastructure. The work covers the key 5G innovation in support of innovative CAM ecosystems, notably at radio, RAN and core network levels. It also includes supporting innovations in the area of Artificial Intelligence (AI) to enable advanced CAM use cases managing a broad range of relevant data sets based on connectivity and sensors. It is based on a multi-tenant business architecture that optimises the return on investments and the efficiency of the deployed connectivity and service infrastructure, while considering the opportunity of a European cloud supporting Europe-wide roaming of CAM services. Beyond technological validation, the proposed pilots will allow to better understand the roles, relations and responsibilities of market players and public authorities within the CAM ecosystem.

The work is also expected to provide a clear co-existence between multiple technologies (IEEE 802.11p, C-V2X, 5G-V2X) and migration path towards the use of 5G as the technology for CAM. It targets implementation across different business domains through coverage of cross border 5G corridors as supported by groups of neighbouring Member States. Projects should complement the deployment plans for the 5G CAM trials along the cross-border corridors in scope of the project with long-term roadmaps for the deployment of the 5G infrastructure along the relevant corridors in view of larger-scale testing and early introduction of 5G-based CAM services along these corridors.

The work may include advanced services on board of international trains covering passenger services, train traffic management services, as well as other operational services in preparation for the advent of the FRMCS, including migration from previous generation issues (GSM-R) and spectrum sharing aspects. Aspects of service and infrastructure sharing or coordination for both the automotive and railway use cases, notably in cities, is in scope, as well as multimodal solutions for passengers with the view to offering business continuity to users of the different means of public and private transportation.

The Commission considers that proposals requesting a contribution from the EU of between EUR 7 and 10 million would allow this area to be addressed appropriately. Nonetheless, this does not preclude submission and selection of proposals requesting other amounts. Proposals may cover the automotive case only, the railway case only, or both.


Expected Impact:Validation of latest version of 5G technologies and architecture in a CAM context, including validation of innovative business models and applicable standards.Validated cost/benefit analysis of cross border 5G deployment enabling CAM along 5G corridors potentially including several business domains.Characterisation of 5G Release 16 or beyond for the most advanced CAM use cases (see through, sensor sharing, high density platooning, etc.) including innovative spectrum use.Validation of sustainable models combining 5G and AI features to support most advanced CAM use cases.Technological validation of 5G introduction for train/railways use cases including FRMCS aspects, migration, spectrum, and co-existence issues with the automotive case.Development of a sustainable model for a pan-European cloud infrastructure supporting CAM services at European scale.Support to sustainable deployment models paving the way towards deployment actions across pan European 5G corridors envisaged for CEF[5] Digital.Participation of key European industrial partners of both the ICT and the automotive sectors and with high standardisation impact is desired.
Cross-cutting Priorities:Contractual Public-Private Partnerships (cPPPs)5G


[1]Communication of the Commission "A 5G Action plan for Europe", COM(2016) 588

[2]Corridors as referred to in the "Letter of Intent" signed by 27 EU Member States, see https://ec.europa.eu/digital-single-market/en/news/eu-and-eea-member-states-sign-cross-border-experiments-cooperative-connected-and-automated

[3]https://ec.europa.eu/transport/themes/infrastructure/news/2018-05-02-mff_en

[4]See list of available corridors at : https://eur-lex.europa.eu/legal-content/EN/TXT/?qid=1528878837354&uri=CELEX:52018PC0438

[5]Connecting Europe Facility proposal of the Commission to be implemented as part of the next Financial Framework, over the period 2021-2027

ver menos

Temáticas Obligatorias del proyecto: Temática principal:

Características del consorcio

Ámbito Europeo : La ayuda es de ámbito europeo, puede aplicar a esta linea cualquier empresa que forme parte de la Comunidad Europea.
Tipo y tamaño de organizaciones: El diseño de consorcio necesario para la tramitación de esta ayuda necesita de:

Características del Proyecto

Requisitos de diseño: Duración:
Requisitos técnicos: Specific Challenge:The challenge is to qualify and characterise the latest version of 5G specifications as available from 3G PP release 16 early 2020 (5G NR-V2X and beyond) in the context of advanced use cases deployment in Europe of CAM that may also benefit from Artificial Intelligence (AI) solutions. It targets use cases beyond C-ITS safety applications in view of enabling use cases in the context of complete connectivity-enabled ecosystems around cars and vehicles. It supports the realisation of the strategic objective of having all major transport paths covered with 5G connectivity by 2025[1] through cross-border trials along major transport paths planned for CAM deployment ("5G corridors"[2]) and paves the way towards operational deployment as envisaged with the Connecting Europe Facility proposal[3]. The work is also relevant to cross border railway corridors in view of providing services to trains, including in the context of the planned Future Railways Mobile Communication Systems (FRMCS) planned to replace GSM-R around 2030. Specific Challenge:The challenge is to qualify and characterise the latest version of 5G specifications as available from 3G PP release 16 early 2020 (5G NR-V2X and beyond) in the context of advanced use cases deployment in Europe of CAM that may also benefit from Artificial Intelligence (AI) solutions. It targets use cases beyond C-ITS safety applications in view of enabling use cases in the context of complete connectivity-enabled ecosystems around cars and vehicles. It supports the realisation of the strategic objective of having all major transport paths covered with 5G connectivity by 2025[1] through cross-border trials along major transport paths planned for CAM deployment ("5G corridors"[2]) and paves the way towards operational deployment as envisaged with the Connecting Europe Facility proposal[3]. The work is also relevant to cross border railway corridors in view of providing services to trains, including in the context of the planned Future Railways Mobile Communication Systems (FRMCS) planned to replace GSM-R around 2030.
¿Quieres ejemplos? Puedes consultar aquí los últimos proyectos conocidos financiados por esta línea, sus tecnologías, sus presupuestos y sus compañías.
Capítulos financiables: Los capítulos de gastos financiables para esta línea son:
Personnel costs.
Los costes de personal subvencionables cubren las horas de trabajo efectivo de las personas directamente dedicadas a la ejecución de la acción. Los propietarios de pequeñas y medianas empresas que no perciban salario y otras personas físicas que no perciban salario podrán imputar los costes de personal sobre la base de una escala de costes unitarios
Purchase costs.
Los otros costes directos se dividen en los siguientes apartados: Viajes, amortizaciones, equipamiento y otros bienes y servicios. Se financia la amortización de equipos, permitiendo incluir la amortización de equipos adquiridos antes del proyecto si se registra durante su ejecución. En el apartado de otros bienes y servicios se incluyen los diferentes bienes y servicios comprados por los beneficiarios a proveedores externos para poder llevar a cabo sus tareas
Subcontracting costs.
La subcontratación en ayudas europeas no debe tratarse del core de actividades de I+D del proyecto. El contratista debe ser seleccionado por el beneficiario de acuerdo con el principio de mejor relación calidad-precio bajo las condiciones de transparencia e igualdad (en ningún caso consistirá en solicitar menos de 3 ofertas). En el caso de entidades públicas, para la subcontratación se deberán de seguir las leyes que rijan en el país al que pertenezca el contratante
Amortizaciones.
Activos.
Otros Gastos.
Madurez tecnológica: La tramitación de esta ayuda requiere de un nivel tecnológico mínimo en el proyecto de TRL 5:. Los elementos básicos de la innovación son integrados de manera que la configuración final es similar a su aplicación final, es decir que está listo para ser usado en la simulación de un entorno real. Se mejoran los modelos tanto técnicos como económicos del diseño inicial, se ha identificado adicionalmente aspectos de seguridad, limitaciones ambiéntales y/o regulatorios entre otros. + info.
TRL esperado:

Características de la financiación

Intensidad de la ayuda: Sólo fondo perdido + info
Fondo perdido:
0% 25% 50% 75% 100%
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme. 
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme. 
Submission and evaluation processes are described in the Online Manual.
 
4. Indicative time for evaluation and grant agreements:
Information on the outcome of evaluation (single-stage call): maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
5. Proposal templates, evaluation forms and model grant agreements (MGA):
Research and Innovation Action:
Specific provisions and funding rates
Standard proposal template
Standard evaluation form
General MGA - Multi-Beneficiary
Annotated Grant Agreement
6. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) &n...
1. Eligible countries: described in Annex A of the Work Programme.
A number of non-EU/non-Associated Countries that are not automatically eligible for funding have made specific provisions for making funding available for their participants in Horizon 2020 projects. See the information in the Online Manual.
 
2. Eligibility and admissibility conditions: described in Annex B and Annex C of the Work Programme. 
Proposal page limits and layout: please refer to Part B of the proposal template in the submission system below.
 
3. Evaluation:
Evaluation criteria, scoring and thresholds are described in Annex H of the Work Programme. 
Submission and evaluation processes are described in the Online Manual.
 
4. Indicative time for evaluation and grant agreements:
Information on the outcome of evaluation (single-stage call): maximum 5 months from the deadline for submission.
Signature of grant agreements: maximum 8 months from the deadline for submission.
5. Proposal templates, evaluation forms and model grant agreements (MGA):
Research and Innovation Action:
Specific provisions and funding rates
Standard proposal template
Standard evaluation form
General MGA - Multi-Beneficiary
Annotated Grant Agreement
6. Additional provisions:
Horizon 2020 budget flexibility
Classified information
Technology readiness levels (TRL) – where a topic description refers to TRL, these definitions apply
Members of consortium are required to conclude a consortium agreement, in principle prior to the signature of the grant agreement.
Complementary grant agreements will be implemented across projects originating from RIA, IA and CSA implemented under these topics through use of the respective options of Article 2, Article 31.6 and Article 41.4 of the Model Grant Agreement.
8. Additional documents:
1. Introduction WP 2018-20
5. Introduction to Leadership in enabling and industrial technologies (LEITs) WP 2018-20
5i. Information and communication technologies (ICT) WP 2018-20
18. Dissemination, Exploitation and Evaluation WP 2018-20
20. Cross-cutting activities WP 2018-20
General annexes to the Work Programme 2018-2020
Legal basis: Horizon 2020 Regulation of Establishment
Legal basis: Horizon 2020 Rules for Participation
Legal basis: Horizon 2020 Specific Programme
A Guide to ICT-related Activities in H2020 Work Programme 2018-20
7. Open access must be granted to all scientific publications resulting from Horizon 2020 actions.
Where relevant, proposals should also provide information on how the participants will manage the research data generated and/or collected during the project, such as details on what types of data the project will generate, whether and how this data will be exploited or made accessible for verification and re-use, and how it will be curated and preserved.
Open access to research data
The Open Research Data Pilot has been extended to cover all Horizon 2020 topics for which the submission is opened on 26 July 2016 or later. Projects funded under this topic will therefore by default provide open access to the research data they generate, except if they decide to opt-out under the conditions described in Annex L of the Work Programme. Projects can opt-out at any stage, that is both before and after the grant signature.
Note that the evaluation phase proposals will not be evaluated more favourably because they plan to open or share their data, and will not be penalised for opting out.
Open research data sharing applies to the data needed to validate the results presented in scientific publications. Additionally, projects can choose to make other data available open access and need to describe their approach in a Data Management Plan.
Projects need to create a Data Management Plan (DMP), except if they opt-out of making their research data open access. A first version of the DMP must be provided as an early deliverable within six months of the project and should be updated during the project as appropriate. The Commission already provides guidance documents, including a template for DMPs. See the Online Manual.
Eligibility of costs: costs related to data management and data sharing are eligible for reimbursement during the project duration.
The legal requirements for projects participating in this pilot are in the article 29.3 of the Model Grant Agreement.
 
Garantías:
No exige Garantías
No existen condiciones financieras para el beneficiario.

Información adicional de la convocatoria

Efecto incentivador: Esta ayuda tiene efecto incentivador, por lo que el proyecto no puede haberse iniciado antes de la presentación de la solicitud de ayuda. + info.
Respuesta Organismo: Se calcula que aproximadamente, la respuesta del organismo una vez tramitada la ayuda es de:
Meses de respuesta:
Muy Competitiva:
No Competitiva Competitiva Muy Competitiva
No conocemos el presupuesto total de la línea
Minimis: Esta línea de financiación NO considera una “ayuda de minimis”. Puedes consultar la normativa aquí.

Otras ventajas

Sello PYME: Tramitar esta ayuda con éxito permite conseguir el sello de calidad de “sello pyme innovadora”. Que permite ciertas ventajas fiscales.
H2020-ICT-2018-20 5G PPP – 5G for Connected and Automated Mobility (CAM) Specific Challenge:The challenge is to qualify and characterise the latest version of 5G specifications as available from 3G PP release 16 e...
Sin info.
DT-ICT-12-2020 Boost rural economies through cross-sector digital service platforms
en consorcio:
Cerrada hace 9 meses | Próxima convocatoria prevista para el mes de
ICT-48-2020 Towards a vibrant European network of AI excellence centres
en consorcio:
Cerrada hace 11 meses | Próxima convocatoria prevista para el mes de
ICT-56-2020 Next Generation Internet of Things
en consorcio:
Cerrada hace 1 año | Próxima convocatoria prevista para el mes de
ICT-57-2020 An empowering, inclusive Next Generation Internet
en consorcio:
Cerrada hace 1 año | Próxima convocatoria prevista para el mes de
ICT-49-2020 Artificial Intelligence on demand platform
en consorcio:
Cerrada hace 1 año | Próxima convocatoria prevista para el mes de