SELF INSTALLING TELESCOPIC SUBSTRUCTURE FOR LOW COST CRANELESS INSTALLATION OF C...
SELF INSTALLING TELESCOPIC SUBSTRUCTURE FOR LOW COST CRANELESS INSTALLATION OF COMPLETE OFFSHORE WIND TURBINES. DEEP OFFSHORE 5MW PROTOTYPE In ELICAN, a strong team of complementary European companies with worldwide leading presence in the Wind Energy industry join forces to provide the market with a disruptive high-capacity and cost-reducing integrated substructure s... In ELICAN, a strong team of complementary European companies with worldwide leading presence in the Wind Energy industry join forces to provide the market with a disruptive high-capacity and cost-reducing integrated substructure system for deep offshore wind energy. The technology is exceptionally fitted to meet the technical and logistical challenges of the sector as it moves into deeper locations with larger turbines, while allowing for drastic cost reduction. This project will design, build, certify and fully demonstrate in operative environment a deep water substructure prototype supporting Adwen’s 5MW offshore wind turbine, the be installed in the Southeast coast of Las Palmas (Canary Islands). It will become the first bottom-fixed offshore wind turbine in all of Southern Europe and the first one worldwide to be installed with no need of heavy-lift vessels. The revolutionary substructure consists in an integrated self-installing precast concrete telescopic tower and foundation that will allow for crane-free offshore installation of the complete substructure and wind turbine, thus overcoming the constraints imposed by the dependence on heavy-lift vessels. It will allow for a full inshore preassembly of the complete system, which is key to generate a highly industrialized low-cost manufacturing process with fast production rates and optimized risk control. The main benefits to be provided by this ground-breaking technology are: • Significant cost reduction (>35%) compared with current solutions. • Direct scalability in terms of turbine size, water depth, infrastructure and installation means. • Complete independence of heavy-lift vessels • Excellently suited for fast industrialized construction. • Robust and durable concrete substructure for reduced OPEX costs and improved asset integrity. • Suitable for most soil conditions, including rocky seabeds. • Enhanced environmental friendliness regarding both impact on sea life and carbon footprint. ver más
31/03/2019
17M€
Duración del proyecto: 39 meses Fecha Inicio: 2015-12-01
Fecha Fin: 2019-03-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2019-03-31
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 17M€
Líder del proyecto
ESTEYCO ENERGIA Las actividades propias de la arquitectura, ingenieria tecnica industrial, ingenieria de caminos, canales y puertos e ingenieria tecnica de...
Perfil tecnológico TRL 4-5 2M