Sector coupling hub for circular use of thermal and industrial waste
Within HURRICANE a sector-coupling circular hub centered around the ArcelorMittal Ghent site will be created. We will target efficient resource management together with the recovery and utilization of squandered industrial waste h...
ver más
31/12/2028
Líder desconocido
25M€
Presupuesto del proyecto: 25M€
Líder del proyecto
Líder desconocido
Fecha límite participación
Sin fecha límite de participación.
Financiación
concedida
El organismo HORIZON EUROPE notifico la concesión del proyecto
el día 2023-12-07
Este proyecto no cuenta con búsquedas de partenariado abiertas en este momento.
Información adicional privada
No hay información privada compartida para este proyecto. Habla con el coordinador.
Participantes
Conecta tu I+D
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Información proyecto HURRICANE
Duración del proyecto: 60 meses
Fecha Inicio: 2023-12-07
Fecha Fin: 2028-12-31
Líder del proyecto
Líder desconocido
Presupuesto del proyecto
25M€
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
Within HURRICANE a sector-coupling circular hub centered around the ArcelorMittal Ghent site will be created. We will target efficient resource management together with the recovery and utilization of squandered industrial waste heat and water. Together with ArcelorMittal Ghent’s ongoing initiatives, this will lead to a reduction of energy, water and raw materials by at least 20%.
Thanks to the ongoing projects taking place within and around the Ghent site, the site is already well connected to many other industries like waste suppliers, chemical producers (ethanol offtake & H2 waste gas), renewable power producers, and wastewater treatment. It has become a multi-sectoral hub leading to efficient implementation of industrial symbiosis concepts. The Ghent site has a significant amount of recyclable energy, material and water that allows this symbiosis. These aspects are not only from the steel making processes, but also from other operations taking place in the mentioned multi-sectoral hub. This hub, can be further enhanced with the integration of waste heat with its ongoing initiatives.
Our solution aims at developing and demonstrating novel heat recovery (heat exchanger) and upgrading (heat pumps) solutions from selected operations and then coupling it with the internal and external off takers by means of a heat grid. With digital tools, aspects like broadening the district heating network, and adapting the heat demand profile of the buildings to better match the intermittent of the waste heat can be optimized. Finally, an integrated software tool for circular hubs that combines the different tools and data produced at the different operations will be developed and validated. Through two virtual demonstrations and a circular hubs blueprint the replication potential will be proven.
The consortium is formed by 12 partners from 5 different countries, including 4 research organizations, 1 large End User, 3 SMEs and 3 civil organizations and 1 linked 3rd party.