The large-scale integration of renewable resources in electric power systems requires the mobilization of flexible consumers who can adapt their consumption to the variable and uncertain fluctuation of renewable supply. The mobili... The large-scale integration of renewable resources in electric power systems requires the mobilization of flexible consumers who can adapt their consumption to the variable and uncertain fluctuation of renewable supply. The mobilization of demand-side flexibility remains an elusive goal in electric power systems, while the majority of flexible consumers are connected to distribution systems that are currently operated passively. The major obstacles towards the optimal management of demand-side flexibility include the enormous number of flexible consumers (with ensuing challenges for scalable optimization), the presence of uncertainty at all layers of the power grid, and the physical complexity of distribution system power flow. In this context, the ICEBERG project proposes a novel approach towards the proactive utilization of transmission and distribution system resources in a coordinated fashion. My approach to achieving this ambitious goal is based on three key ingredients. (i) The first ingredient is a novel approach for planning and simulating the dispatch of the system which exploits the structure of distribution networks and can scale to systems of arbitrary size. (ii) The second ingredient is an original optimization framework for tackling uncertainty and non-convexity at every layer of the system. (iii) The third ingredient is a novel implementation of this optimization framework in parallel and distributed computing infrastructure, which will enable the optimal short-term planning and real-time coordination of resources at all layers of the system. My vision is to break down the current barriers to renewable energy integration by mobilizing the as yet untapped flexibility that is present at all layers of the network. This will enable the achieving of ambitious sustainability targets with acceptable infrastructure upgrades and without any deterioration in the quality of electric power service, which consumers currently enjoy. ver más
30/09/2026
1M€
Perfil tecnológico estimado
Duración del proyecto: 81 meses Fecha Inicio: 2019-12-13
Fecha Fin: 2026-09-30

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2019-12-13
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
ERC-2019-STG: ERC Starting Grant
Cerrada hace 6 años
Presupuesto El presupuesto total del proyecto asciende a 1M€
Líder del proyecto
EREVNITIKO PANEPISTIMIAKO INSTITOUTO SYSTIMAT... No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5