Risk based approaches for Asset inteGrity multimodal Transport Infrastructure Ma...
An efficient asset management process is needed to ensure cost-effectiveness, in planning, delivery, operation and maintenance of large infrastructures or infrastructures network. Infrastructure asset management generally focuses... An efficient asset management process is needed to ensure cost-effectiveness, in planning, delivery, operation and maintenance of large infrastructures or infrastructures network. Infrastructure asset management generally focuses on the later stages of a facility’s life cycle, specifically maintenance, rehabilitation, and replacement. However, a process of efficient asset management must define methods and tools for asset tracking, management of maintenance activity, determine the life cycle and replacement costs of the assets, assistance in determining funding strategies, optimizing capital investments in operation and maintenance, and help with the replacement of assets. Currently, the procurement, design, construction, exploitation and public communication to the final users and society regarding to the land transport infrastructures are: • not multimodal, not cross-assets, but focused on individual assets. • not correctly linked, not being able to exchange information by different stakeholders. • lack of a common risk based approach and the implementation of resilient concepts throughout the whole life cycle The aim of the proposal is to establish a common framework for governance, management and finance of transport infrastructure projects in order to ensure the best possible return from limited investment funds in transport infrastructures The main objective of RAGTIME is to develop, demonstrate and validate an innovative management approach and to lay out a whole system planning software platform, based on standard multiscale data models, able to facilitate a holistic management throughout the entire lifecycle of the infrastructure, providing an integrated view of risk based approach, implementing risk based models, resilient concepts and mitigation actions, with specific reference to climate change related threats perspective, and monitored with smart systems, in order to optimize ROI, management, guarantee LOS and improve resilience through maintaining the service. ver más
31/08/2019
3M€
Duración del proyecto: 38 meses Fecha Inicio: 2016-06-10
Fecha Fin: 2019-08-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2019-08-31
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 3M€
Líder del proyecto
FUNDACION TECNALIA RESEARCH & INNOVATION Promoción, el desarrollo y el fomento de actividades de investigación, desarrollo e innovación
Perfil tecnológico TRL 2-3 123M