TailSurf will contribute to the design, testing, integration and optimisation of ARE for the improvement of performance at component level of 20% weight reduction, 20% recurring cost reduction and 50% lead time reduction. It is al...
ver más
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Proyectos interesantes
NNATAC
New Numerical and Analytical Tools for Aerodynamic flow Cont...
764K€
Cerrado
PLASMAERO
Useful PLASMa for AEROdynamic control
5M€
Cerrado
3DFSE
3D Design of Flap Side Edge Flow Control
80K€
Cerrado
HELIDES
Helicopter Drag Prediction using Detached Eddy Simulation
147K€
Cerrado
ALEF
Aerodynamic loads estimation at extremes of the flight envel...
6M€
Cerrado
TRA2012-34148
MEJORAS DEL RENDIMIENTO AERODINAMICO DE ALAS MEDIANTE CONTRO...
201K€
Cerrado
Información proyecto TailSurf
Duración del proyecto: 41 meses
Fecha Inicio: 2019-10-01
Fecha Fin: 2023-03-31
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
TailSurf will contribute to the design, testing, integration and optimisation of ARE for the improvement of performance at component level of 20% weight reduction, 20% recurring cost reduction and 50% lead time reduction. It is also expected that 1.5% reduction of fuel burn at aircraft level will be achieved from the optimal rear end configurations.
The specific objectives and the associated work packages to achieve this aim are shown below.
1. To define and test technologies and shapes to delay the flow separation, leading to stall of the tail surface and saturation of the control surfaces (WP1 – deliverable DX in MX). Thee control effect of these technologies and devices will be verified by both wind tunnel experiments and computational fluid dynamics (CFD) on high-performance computing (HPC) facilities.
2. To study means and concepts to increase aeroelastic efficiency of tail surfaces using computational and experimental means.
3. To study the integration of all technologies on an advanced rear-end configuration and numerical prediction and post-test calibration.
4. To investigate the applicability of plasma actuators (DBDs) for de-icing and delaying stall experimentally.
5. To carry out management and administration required over the course of the whole project. It will serve to administer and manage the project in accordance with the Clean Sky 2 Management Manual, including the management of risks, finances and administrative tasks. It will also be essential to promote the project results and scientific and technical outcomes through targeted dissemination and communication activities