The primary objective of the PrimoLyser project is to develop, construct, and test a cost-minimised highly efficient and durable PEM-electrolyser stack aimed for integrated with domestic µCHPs through a combination of the followin...
ver más
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
TED2021-131663B-I00
OPERACION Y CONTROL DE SISTEMAS DE PRODUCCION Y ALMACENAMIEN...
311K€
Cerrado
ELY4OFF
PEM ElectroLYsers FOR operation with OFFgrid renewable insta...
2M€
Cerrado
NEXPEL
Next Generation PEM Electrolyser for Sustainable Hydrogen Pr...
3M€
Cerrado
REFHYNE II
Clean Refinery Hydrogen for Europe II
149M€
Cerrado
NEXPEL
Next-Generation PEM Electrolyser for Sustainable Hydrogen Pr...
3M€
Cerrado
Información proyecto PRIMOLYZER
Duración del proyecto: 29 meses
Fecha Inicio: 2010-01-01
Fecha Fin: 2012-06-30
Líder del proyecto
IRD FUEL CELLS AS
No se ha especificado una descripción o un objeto social para esta compañía.
TRL
4-5
Presupuesto del proyecto
3M€
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
The primary objective of the PrimoLyser project is to develop, construct, and test a cost-minimised highly efficient and durable PEM-electrolyser stack aimed for integrated with domestic µCHPs through a combination of the following activities:1) Specification done by the end-user(s);2) Basic material R&D on catalyst & membrane to increase durability & efficiency while reducing cost;3) Process development to fabricate high performance MEAs;4) Engineering of a durable, reliable, and robust high pressure PEM stack through CFD modelling and design optimisation;5) Continuous test for 2,000 hours together with a 1.5 kW µCHP; and6) An evaluation headed by the end-user(s)The key-targets for the stack are as follows:A) Hydrogen production capacity: 1 Nm3/h;B) Pressure: 10 MPa (100 bar);C) 1.68 V @ 1.2 A/cm2 not only at BoL but also after 2,000 hours of continuous operation;D) Cost: <5,000 € per Nm3 H2 production capacity per hour in series production; andE) Durability: >20,000 hours @ constant loadFurthermore, the stack will be liquid cooled to enhance durability and enable easy heat utilisation. This is important as a PEM electrolyser operated with renewable will run when the electricity is cheap and therefore not simultaneous with the µCHP.The PrimoLyser project is scheduled for 2.5 years. The present proposal is phase I in a 2 step development, where phase II will comprise BoP development & full integration of the electrolyser with a µCHP followed by a field test.The Consortium is well balanced, with the following 6 partners complementing one another to achieve the project target goals: i) A PEM FC manufacturing company (IRD Fuel Cells A/S [SME], DK); ii) 3 research centres and universities VTT (FI), Åbo Akademi (FI) & ECN (NL); iii) A leading manufacturer of ion exchange polymers and membranes (Fumatech (DE)); and iv) A subsidiary utility company (Abengoa-Hynergreen [ES])