Innovating Works

PRIMOLYZER

Financiado
PRessurIzed PEM electrOLYZER
The primary objective of the PrimoLyser project is to develop, construct, and test a cost-minimised highly efficient and durable PEM-electrolyser stack aimed for integrated with domestic µCHPs through a combination of the followin... The primary objective of the PrimoLyser project is to develop, construct, and test a cost-minimised highly efficient and durable PEM-electrolyser stack aimed for integrated with domestic µCHPs through a combination of the following activities:1) Specification done by the end-user(s);2) Basic material R&D on catalyst & membrane to increase durability & efficiency while reducing cost;3) Process development to fabricate high performance MEAs;4) Engineering of a durable, reliable, and robust high pressure PEM stack through CFD modelling and design optimisation;5) Continuous test for 2,000 hours together with a 1.5 kW µCHP; and6) An evaluation headed by the end-user(s)The key-targets for the stack are as follows:A) Hydrogen production capacity: 1 Nm3/h;B) Pressure: 10 MPa (100 bar);C) 1.68 V @ 1.2 A/cm2 not only at BoL but also after 2,000 hours of continuous operation;D) Cost: <5,000 € per Nm3 H2 production capacity per hour in series production; andE) Durability: >20,000 hours @ constant loadFurthermore, the stack will be liquid cooled to enhance durability and enable easy heat utilisation. This is important as a PEM electrolyser operated with renewable will run when the electricity is cheap and therefore not simultaneous with the µCHP.The PrimoLyser project is scheduled for 2.5 years. The present proposal is phase I in a 2 step development, where phase II will comprise BoP development & full integration of the electrolyser with a µCHP followed by a field test.The Consortium is well balanced, with the following 6 partners complementing one another to achieve the project target goals: i) A PEM FC manufacturing company (IRD Fuel Cells A/S [SME], DK); ii) 3 research centres and universities VTT (FI), Åbo Akademi (FI) & ECN (NL); iii) A leading manufacturer of ion exchange polymers and membranes (Fumatech (DE)); and iv) A subsidiary utility company (Abengoa-Hynergreen [ES]) ver más
30/06/2012
IRD
3M€
Duración del proyecto: 29 meses Fecha Inicio: 2010-01-01
Fecha Fin: 2012-06-30

Línea de financiación: concedida

El organismo FP6 notifico la concesión del proyecto el día 2012-06-30
Presupuesto El presupuesto total del proyecto asciende a 3M€
Líder del proyecto
IRD FUEL CELLS AS No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5