Open Centre Tidal Turbine Industrial Capability
OpenHydro holds a unique position in the tidal industry. It has developed a state-of-the-art Open-Centre Turbine with a proven ability to generate and deliver electricity to the national grid and a patented method to deploy and r... OpenHydro holds a unique position in the tidal industry. It has developed a state-of-the-art Open-Centre Turbine with a proven ability to generate and deliver electricity to the national grid and a patented method to deploy and recover turbines quickly, safely and economically on the seabed. Simplicity is at the core of OpenHydro’s design philosophy: the turbine has only one moving part, minimising the number of interventions for maintenance. Fundamentally, the Open-Centre Turbine system is designed to deliver the lowest cost of energy. Since the installation of OpenHydro’s first turbine in 2006, the technology has been developed and tested extensively, with prototype designs optimised to provide higher outputs and improved economics. Validation of the full-scale, 2.0MW 16 metre turbine system following the deployment, grid connection and operation of a two turbine array at the Paimpol-Bréhat test site in France brings the technology to TRL 7. OpenHydro’s stated objective is to match and beat the Levelised Cost of Energy (LCoE) of offshore wind. The OCTTIC FTI Pilot project, which brings together a consortium of 4 industrial partners led by OpenHydro, will achieve this through advancement of the turbine system design to improve performance, efficiency and reliability. These advancements when combined with a reduction in operational and maintenance requirements, will deliver significant reductions in capital and operational costs to achieve LCoE targets. OCTTIC will establish a robust industrial production platform and the associated supply chain to produce, assemble and deploy the turbines at scale to deliver LCoE targets and lead the development of the tidal energy market. The outputs of this project will be implemented immediately through the deployment of commercial tidal array projects in partnership with energy utilities to make significant contributions towards the decarbonisation of the European energy system and securing energy supply. ver más
30/11/2018
4M€
Duración del proyecto: 23 meses Fecha Inicio: 2016-12-02
Fecha Fin: 2018-11-30

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2018-11-30
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 4M€
Líder del proyecto
JOHN COCKERILL No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5