Novel deSign producTion and opEration aPproaches for floating WIND turbine farm...
Novel deSign producTion and opEration aPproaches for floating WIND turbine farms
STEP4WIND aims at increasing the commercial readiness level of floating offshore wind energy through technological innovations across the supply chain. Floating wind turbines (FOWTs) could be a game changer to further decrease the...
ver más
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Información proyecto STEP4WIND
Duración del proyecto: 54 meses
Fecha Inicio: 2020-02-05
Fecha Fin: 2024-08-31
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
STEP4WIND aims at increasing the commercial readiness level of floating offshore wind energy through technological innovations across the supply chain. Floating wind turbines (FOWTs) could be a game changer to further decrease the cost of offshore wind energy and unlock new markets. Wind turbines placed on a floating support and moored to the seabed can harness energy in areas with much higher wind speeds, at a reduced installation cost. It also gives the opportunity to countries with deep water to enter the offshore wind industry. The SET-Plan stresses that Europe needs to move fast in deploying FOWTs. It also highlights the urgency to widen the basic knowledge of early-stage researchers (ESRs) towards the design of FOWTs and match it with industrial needs. This European Industrial Doctorate programme will achieve this by delivering 10 doctoral degrees jointly supervised by the public and private sectors. The ESRs will be supervised by 3 universities with a track-record in wind energy research and 5 companies leading the deployment of floating wind farms and heavily involved in policy-making bodies. A mentoring scheme will be tailored to the needs of each ESR, with the involvement of several female senior staff. Scientifically, STEP4WIND will develop floating-specific tools, methods and infrastructures to tackle the technological and economical challenges of FOWTs, from design to deployment, operation and scaling up. The innovations from each ESR will be systematically integrated in a common multi-disciplinary design and optimisation tool to assess their impact on cost, risk and the environment. STEP4WIND will also deliver guidelines for large farm deployments, with a clear roadmap to commercialisation. The results will be disseminated openly in a series of innovative ways, including an online game and a design competition. STEP4WIND will also take part in large outreach initiatives, such as the TORQUE2020 outreach events organised by the Coordinator in May 2020.