Innovating Works

Indus3Es

Financiado
Industrial Energy and Environment Efficiency Large quantities of waste heat are continuously rejected from industries. Most of this waste energy, however, is of low-quality and is not practical or economical to recover it with current technologies. The Indus3Es project will... Large quantities of waste heat are continuously rejected from industries. Most of this waste energy, however, is of low-quality and is not practical or economical to recover it with current technologies. The Indus3Es project will develop an innovative Absorption Heat Transformer (AHT) for this purpose, focused on low temperature waste heat recovery (below 130ºC). The Indus3Es System will effectively recover and revalorize about 50% of the low-temperature waste heat, increasing quality of the waste source to the required temperature and reusing it again in the industrial process.The main objective is to develop an economically viable solution for industry, appropriate for new but also for existing plants and adaptable to various industrial processes. The developed system will be demonstrated in real environment in Tupras, a petrochemical industry in Turkey, enabling to analyze besides integration aspects, operational and business issues of Indus3Es System. Indus3Es System will be defined and optimized for different specificities in different sectors and industrial processes, for which up-scaling of the demonstrated technology and replication studies will be performed. Market potential evaluation and business analysis will be performed by industrial partners in order to guarantee a successful exploitation of the system in a short future.Indus3Es system will have a relevant impact making possible an energy efficiency increase and primary energy consumption of most energetic intensive industries in Europe. The embodied energy, the environmental footprint of the products and the manufacturing costs of energy intensive industries will be reduced, increasing the competitiveness of European products. Moreover, it will allow a sustainable economic activity for local auxiliary companies, usually SMEs, in high added value services related to the energy efficiency measures for industry. ver más
30/04/2020
4M€
Duración del proyecto: 54 meses Fecha Inicio: 2015-10-01
Fecha Fin: 2020-04-30

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2020-04-30
H2020 No se conoce la línea exacta de financiación, pero conocemos el organismo encargado de la revisión del proyecto.
Presupuesto El presupuesto total del proyecto asciende a 4M€
Líder del proyecto
FUNDACION TECNALIA RESEARCH & INNOVATION No se ha especificado una descripción o un objeto social para esta compañía.