Innovating Works

IMPRINTS

Financiado
IMproving Preparedness and RIsk maNagemenT for flash floods and debriS flow even...
The aim of IMPRINTS is to contribute to reduce loss of life and economic damage through the improvement of the preparedness and the operational risk management for Flash Flood and Debris Flow [FF/DF] generating events, as well as... The aim of IMPRINTS is to contribute to reduce loss of life and economic damage through the improvement of the preparedness and the operational risk management for Flash Flood and Debris Flow [FF/DF] generating events, as well as to contribute to sustainable development through reducing damages to the environment. To achieve this ultimate objective the project is oriented to produce methods and tools to be used by emergency agencies and utility companies responsible for the management of FF/DF risks and associated effects. Impacts of future changes, including climatic, land use and socioeconomic will be analysed in order to provide guidelines for mitigation and adaptation measures. Specifically, the consortium will develop an integrated probabilistic forecasting FF/ DF system as well as a probabilistic early warning and a rule-based probabilistic forecasting system adapted to the operational use by practitioners. These systems will be tested on five selected flash flood prone areas, two located in mountainous catchments in the Alps, and three in Mediterranean catchments. The IMPRINTS practitioner partners, risk management authorities and utility company managers in duty of emergency management in these areas, will supervise these tests. The development of such systems will be carried out using and capitalising the results of previous and ongoing research on FF/DF forecasting and warning systems, in which several of the partners have played a prominent role. One major result of the project will be a operational prototype including the tools and methodologies developed under the project. This prototype will be designed under the premise of its ultimate commercialization and use worldwide. The consortium, covering all the actors involved in the complex chain of FF & DF forecasting, has been carefully selected to ensure the achievement of this. Specific actions to exploit and protect the results and the intellectual property of the partners have been also defined. ver más
14/11/2012
UPC
4M€

Línea de financiación: concedida

El organismo FP7 notifico la concesión del proyecto el día 2012-11-14
Presupuesto El presupuesto total del proyecto asciende a 4M€
Líder del proyecto
Universidad Politécnica de Cataluña No se ha especificado una descripción o un objeto social para esta compañía.
Total investigadores 9