I PRIMES an Intelligent Power Regulation using Innovative Modules for Energy S...
I PRIMES an Intelligent Power Regulation using Innovative Modules for Energy Supervision
"The main objective of the proposal is the development of an hardware device able to implement an innovative power management (I-LPM) function for an aeronautical electrical network. The proposal is based on the two keypoints. Fir...
ver más
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
"The main objective of the proposal is the development of an hardware device able to implement an innovative power management (I-LPM) function for an aeronautical electrical network. The proposal is based on the two keypoints. First one concerns the I-LPM strategy for the specific application, that will be first derived and tested in a simulation environment. In a second phase the above strategy will be implemented, adopting semi-automatic techniques for translation of the simulation model into firmware. Second keypoint is about an EPC (Electrical Power Center) hardware extension that will be designed and realized, where a modular approach will be considered for the overall equipment implementation. Each cell will be composed by a programmable device, an interfacing stage and possibly by an innovative power device switching component. A master module will be able to implement the I-LPM concept and communicate with slave modules for correct energy management strategy implementation. Different types of slave modules will be considered, taking into account the necessity of I-LPM strategy implementation for both fixed power and variable power loads. A preliminary analysis phase will be conducted in order to analyze the fundamental requirements for the project objectives and derive the specifications set. After the models validation, it will be necessary to implement the derived models as real electronic components. Before integration on the ETB (Electrical Test Bench), the hardware performances will be verified towards the expected results, considering the requirements derived in the first stage as well as the obtained simulation results. Next, a complete test case set will be performed in order to evidence the expected results fulfillment. Finally, an optimization stage will consider the user's feedbacks and appropriately manage potential faults occurring on the electrical network."