Innovating Works

HiPERFORM

Financiado
High performant Wide Band Gap Power Electronics for Reliable energy eFficient d...
High performant Wide Band Gap Power Electronics for Reliable energy eFficient drivetrains and Optimization thRough Multi physics simulation The project objective of the project HiPERFORM is based on the investigation of industrial applicability of high-performance semiconductors with wide-band gap materials in the field of Smart Mobility. For this purpose, a holistic... The project objective of the project HiPERFORM is based on the investigation of industrial applicability of high-performance semiconductors with wide-band gap materials in the field of Smart Mobility. For this purpose, a holistic approach is selected that includes the entire supply chain - from the manufacturer of semiconductors as well as power modules through suppliers of development methods and tools to the system manufacturer and ultimately the vehicle manufacturer. The integration of academic partners with a high level of competence in these domains completes this approach. On the other hand, specific requirements for power electronics are addressed in specific application areas, which include both power inverters in the vehicle, electrical charging modules inside and outside the vehicle, as well as the associated development and test systems. The high performance spectrum of wide-band gap semiconductors and the resulting potential for improvement and savings within the concrete applications of the electrified power train contribute to a substantial saving of CO2 in transport and thus support the achievement of the set climate targets in Europe. The jointly planned objectives and research activities will further strengthen European research and industry partners in the field of electronic components and systems. Besides Semiconductor manufacturing capabilities, the project requires also high capabilities in Cyber Physical Systems and Design Technologies and supports the domain Smart Mobility and Smart Energy as well. ver más
31/10/2021
AVL
41M€
Duración del proyecto: 41 meses Fecha Inicio: 2018-05-17
Fecha Fin: 2021-10-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2021-10-31
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
ECSEL-2017-2: RIA
Cerrada hace 7 años
Presupuesto El presupuesto total del proyecto asciende a 41M€
Líder del proyecto
AVL LIST GMBH No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5