HIGH HEAT REJECTION THERMAL CONTROL SYSTEM
Large System Integrators (LSI) in Europe are interested in Mechanically Pumped Loops (MPLs) which are high heat rejection thermal control systems (between 10kW and 20 kW as reference) for their utilisation as thermal control syste... Large System Integrators (LSI) in Europe are interested in Mechanically Pumped Loops (MPLs) which are high heat rejection thermal control systems (between 10kW and 20 kW as reference) for their utilisation as thermal control systems of active antennas or of the satellite platform. Furthermore, the lack of precise thermal stability in existing thermal control systems and the dependence on the nuclear energy, is stopping the development of new scientific instruments. Therefore, HEART will be an enabling technology for future scientific missions. The MAIN OBJECTIVE of this project is to accelerate the introduction of AVS´s MPL technology into the Satcom global market. AVS has developed a High Heat Rejection Thermal Control System (HEART) that is an innovative Mechanically Pumped Loop, a new product for thermal control purposes capable of dissipating more than 10kW that will assure an easier manufacturing and improved performances (50% increase in durability), easier assembly and more efficient manufacturing cost compared to actual alternative solutions. This has resulted in Airbus Defence and Space’s commitment use and fly the HEART in their next telecom satellite launch. Airbus includes a global thermal control toolbox that goes from the simplest design to the most advanced solution based on Thermal MPL design. HEART includes to fly the final solution thanks to the next Eurostar 3000 satellite of Airbus (for in-orbit test) phase and 1 month the second phase (this test will continue for another 15 years after the project ends) and monitored by Airbus. HEART points it commercial interest in the Satellite manufacturing segment, that reached in 2015 $16.6 billion revenues (10b$ in U.S.), which means a growth of 4% over the previous year. It is estimated to reach a 25% market share in six years and 50% in the long-term of Europe’s market. And as consequence, the company will have an accumulated EBITDA of +16.89 M€ and new +50.4 M€ turnover in six years. ver más
28/02/2021
3M€
Duración del proyecto: 36 meses Fecha Inicio: 2018-02-14
Fecha Fin: 2021-02-28

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2021-02-28
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 3M€
Líder del proyecto
AVS ADDED VALUE INDUSTRIAL ENGINEERING SOLUTI... El desarrollo de equipos de precision, la ingenieria, estudio, proyecto, construccion, montaje o instalacion, supervision, reparacion, mante...
Perfil tecnológico TRL 4-5 2M