Innovating Works

VERNE

Financiado
Guided Ultra sonic Waves for High Performance Deepwater Pipeline Inspection
This project aims to develop and commercialise VERNE: A non-destructive testing (NDT) system that has the potential to revolutionise underwater inspection of tubular structures by achieving far greater inspection speed and precisi... This project aims to develop and commercialise VERNE: A non-destructive testing (NDT) system that has the potential to revolutionise underwater inspection of tubular structures by achieving far greater inspection speed and precision compared to existing systems. As the majority of offshore Oil and Gas extraction assets have already exceeded their design lifetime, the need for decommissioning and/or substituting these assets becomes increasingly pressing. However, associated costs are enormous and it will cost nearly €20 billion over the next 10 years to remove around 80 platforms and their associated infrastructure. As asset owners strive to prolong asset lifetime while and minimise risk of catastrophic accidents, the greatest challenge is the inspection and maintenance of subsea structures like jacket foundations and pipelines. In underwater environments the high pressure, seawater and marine life (biofouling) obstruct maintenance operations and accelerate structure degradation. Subsea inspections are currently performed using Remotely Operated Vehicles carrying a payload of cameras, sensors and other equipment. VERNE will dramatically improve on their performance by combining ultrasound and acoustic testing that enable (i) the rapid scanning and defect mapping in a 100m radius around the inspection point and (ii) detailed and precise characterisation once defects are identified. VERNE’s technologies enable inspection of both external and internal surface of structures (e.g. pipelines) without the need to remove anti-corrosion coatings and/or biofouling. As such, VERNE will lead to significant cost savings for asset owners while providing a key competitive advantage to subsea service providers. As such, project partners Dacon and Nardoni anticipate a cumulative turnover of €31.468 million and profits of €19.3 million by Year 5 with a breakeven over the total budget in Year 2 and a ROI rate of 13:1 on EC’s grant. ver más
29/02/2020
2M€
Duración del proyecto: 27 meses Fecha Inicio: 2017-11-25
Fecha Fin: 2020-02-29

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2020-02-29
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 2M€
Líder del proyecto
HOGSKOLEN I OSTFOLD No se ha especificado una descripción o un objeto social para esta compañía.