GREEN HYSLAND Deployment of a H2 Ecosystem on the Island of Mallorca
The GREEN HYSLAND PROJECT adresses the requirements of the call FCH-03-2-2020: H2 Islands by deploying a fully-integrated and functioning H2 ecosystem in the island of Mallorca, Spain. The project brings together all core elements...
The GREEN HYSLAND PROJECT adresses the requirements of the call FCH-03-2-2020: H2 Islands by deploying a fully-integrated and functioning H2 ecosystem in the island of Mallorca, Spain. The project brings together all core elements of the H2 value chain i.e. production, distribution infrastructure and end-use of green hydrogen across mobility, heat and power. The overall approach of GREEN HYSLAND is based on the integration of 6 deployment sites in the island of Mallorca, including 7.5MW of electrolysis capacity connected to local PV plants and 6 FCH end-user applications, namely buses and cars, 2 CHP applications at commercial buildings, electricity supply at the port and injection of H2 into the local gas grid. The intention is to facilitate full integration and operational interconnectivity of all these sites. The project will also deliver the deployment of infrastructure (i.e. dedicated H2 pipeline, distribution via road trailers and a HRS) for distributing H2 across the island and integrating green H2 supply with local end-users. The scalability and EU replicability of this integrated H2 ecosystem will be showcased via a long-term roadmap towards 2050, together with full replication studies. The intention is to expand the impact beyond the technology demonstrations delivered by the project, setting the basis for the first H2 hub at scale in Sothern Europe. This will provide Europe with a blueprint for decarbonization of island economies, and an operational example of the contribution of H2 towards the energy transition and the 2050 net zero targets
The project has already been declared to be a Strategic Project by the Balearic Regional Government, and has support from the National Government through IDAE.ver más
02-11-2024:
Generación Fotovolt...
Se ha cerrado la línea de ayuda pública: Subvenciones destinadas al fomento de la generación fotovoltaica en espacios antropizados en Canarias, 2024
01-11-2024:
ENESA
En las últimas 48 horas el Organismo ENESA ha otorgado 6 concesiones
01-11-2024:
FEGA
En las últimas 48 horas el Organismo FEGA ha otorgado 1667 concesiones
Seleccionando "Aceptar todas las cookies" acepta el uso de cookies para ayudarnos a brindarle una mejor experiencia de usuario y para analizar el uso del sitio web. Al hacer clic en "Ajustar tus preferencias" puede elegir qué cookies permitir. Solo las cookies esenciales son necesarias para el correcto funcionamiento de nuestro sitio web y no se pueden rechazar.
Cookie settings
Nuestro sitio web almacena cuatro tipos de cookies. En cualquier momento puede elegir qué cookies acepta y cuáles rechaza. Puede obtener más información sobre qué son las cookies y qué tipos de cookies almacenamos en nuestra Política de cookies.
Son necesarias por razones técnicas. Sin ellas, este sitio web podría no funcionar correctamente.
Son necesarias para una funcionalidad específica en el sitio web. Sin ellos, algunas características pueden estar deshabilitadas.
Nos permite analizar el uso del sitio web y mejorar la experiencia del visitante.
Nos permite personalizar su experiencia y enviarle contenido y ofertas relevantes, en este sitio web y en otros sitios web.