Established in 1971, our company LEADING METAL MECHANIC SOLUTIONS S.L. is a Spanish specialist in design, development and manufacturing of precision components (machined, welded, forged or casted). In recent years, we have directe... Established in 1971, our company LEADING METAL MECHANIC SOLUTIONS S.L. is a Spanish specialist in design, development and manufacturing of precision components (machined, welded, forged or casted). In recent years, we have directed our business strategy to technology and knowledge-intensive sectors – Oil & Gas, Power plants, Airspace and Defense – where we have been continually striving to get involved in highly innovative projects, large-scale scientific initiatives and new materials. We have successfully participated in the ITER project to manufacture the First Wall panels and their associated Super-Efficient Heat Exchanger. After several years of R&D work in efficient heat exchangers, we have developed an innovative Fusion-to-Fossil heat exchanger prototype to be integrated in Boiler Circulating Pumps (BCPs). BCPs are indeed a key component for Supercritical Coal Power Plants, which have become the system of choice in most industrialized countries due to their high efficiency (40-45%). BCPs are required in all coal power plants in order to circulate water within the boiler to enhance boiler operation. They are designed for high temperatures and high pressure, and they have the highest power demand (3.5-3.9% of the rated generator capacity) of all the auxiliary devices in a coal power plant. Listening to the power plant and energy market and the evolution of its requirements via our customers, we have identified a clear need in higher efficiency and cost optimization for their products. With our Fusion-to-Fossil heat exchanger F2F project, we are offering our existing BCP customers and potential customers in other sectors (e.g. petrochemical) an innovative technology achieving a 10-15% increase in system efficiency and a cost savings of up to 30%. With F2F, we will be able to significantly consolidate our market share in the energy sector (+€24Million of revenues within 5 years of exploitation) while increasing the competitiveness of our EU customers. ver más
31/08/2016
71K€
Duración del proyecto: 3 meses Fecha Inicio: 2016-05-13
Fecha Fin: 2016-08-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2016-08-31
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 71K€
Líder del proyecto
LEADING METAL MECHANIC SOLUTIONS No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5 1M