Fuse based segmentation design Avoiding failure propagation in building structu...
Extreme events often cause local-initial damage to the critical elements of building structures, followed by a cascade of further failures in the rest of the building; a phenomenon known as progressive collapse. Current design phi... Extreme events often cause local-initial damage to the critical elements of building structures, followed by a cascade of further failures in the rest of the building; a phenomenon known as progressive collapse. Current design philosophies are based on giving buildings extensive continuity, so that when a critical element fails its load can be re-distributed among the rest of the structure. However, in certain situations (e.g. initial failure of several columns) this extensive continuity introduces undesirable effects and actually increases the risk of progressive collapse. Segmenting a building into individual units connected only by means of fuses would avoid a failure in one zone propagating to others. While such fuses would provide continuity for normal loads or small local-initial failure, they would isolate the different parts of the building when otherwise the forces generated by the initial failure would pull down the rest of the structure. Although fuse segmentation is probably the only alternative that can fill the gaps in the present design philosophies, so far, no studies have been carried out on the possibility of applying it to buildings. Endure’s overall aim is to develop a novel fuse-based segmentation design approach to limit or arrest the propagation of failures in building structures subjected to extreme events. The project will be multidisciplinary and highly ambitious, and will achieve its overall aim by: 1) Developing a performance-based approach for the design of fuse-segmented buildings; 2) Designing, manufacturing and testing fuses for segmenting buildings; and 3) Implementing fuses in segmented realistic building prototypes and testing and validating the new fuse-based approach in these structures. Endure will open up a new research area and design approach, and also deliver novel construction procedures. The project will lead to safer buildings, especially in the case of extreme events with severe consequences for building integrity. ver más
31/12/2026
UPV
3M€
Duración del proyecto: 71 meses Fecha Inicio: 2021-01-12
Fecha Fin: 2026-12-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2021-01-12
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 3M€