Innovating Works

FITOPTIVIS

Financiado
From the cloud to the edge smart IntegraTion and OPtimization Technologies for...
From the cloud to the edge smart IntegraTion and OPtimization Technologies for highly efficient Image and VIdeo processing Systems The objective of FitOptiVis is to develop an integral approach for smart integration of image- and video-processing pipelines for CPS covering a reference architecture, supported by low-power, high-performance, smart devices, and... The objective of FitOptiVis is to develop an integral approach for smart integration of image- and video-processing pipelines for CPS covering a reference architecture, supported by low-power, high-performance, smart devices, and by methods and tools for combined design-time and run-time multi-objective optimisation within system and environment constraints. Low latency Image processing is often crucial for autonomy, and performing the right interaction of the CPS with its environment. The most important CPS in the project have sensors and processing at distributed places. For many reasons (parts of) CPS has to operate on low energy, whereas the complete system needs results with low latency. The focus of the project is on multi-objective optimisation for performance and energy use. However, other qualities, like reliability, security etc. also play a role in the optimisation. ver más
30/11/2021
22M€
Duración del proyecto: 42 meses Fecha Inicio: 2018-05-17
Fecha Fin: 2021-11-30

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2021-11-30
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
ECSEL-2017-2: RIA
Cerrada hace 7 años
Presupuesto El presupuesto total del proyecto asciende a 22M€
Líder del proyecto
PHILIPS MEDICAL SYSTEMS NEDERLAND BV No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5