Innovating Works

AUTO-RST

Financiado
Flexible automated manufacturing of RST Facets High Performance Solar Reflector...
Flexible automated manufacturing of RST Facets High Performance Solar Reflectors for CSP industry TEWER is a Spanish Engineering Company founded in 2014 by a team of experts in design, optimization and product development for solar plants and industrial technologies, with strong presence in the Concentrated Solar Power (CSP) e... TEWER is a Spanish Engineering Company founded in 2014 by a team of experts in design, optimization and product development for solar plants and industrial technologies, with strong presence in the Concentrated Solar Power (CSP) energy market. TEWER’s RST solar reflector is a disruptive patented solution, a unique sandwich-type, high performance facet for CSP applications, with very robust behaviour under working conditions and with an innovative design and manufacturing process. The technology proposed will remarkably enhance the optical quality to values lower than 0.6mrad for any operational conditions as well as produce the first facets in the market of up to 7sqm. This will allow to reduce the solar field investment by 15% (around 23M€ out of 156M€), disrupting the existing tower thermosolar market. The RST project and its possible future evolutions with joined optimizations with heliostats are aimed at a cost reduction of energy generation using this technology to the tune of 65 to 75 €/MWh depending on the plant location and other business parameters as financing cost. This project drastically improves the production/cost ratio, including both CAPEX and OPEX. The main objective of the SMEI Phase 2 Project is to transition form the artisanal making of one-off individual facets to a pre-series production that allows to reproduce the design results in large numbers. This will be reached through the deployment of a pilot pre-series production line, representative of the future series production process to verify and validate the quality and performance of representative batches. Once the necessary re-engineering is done, the production process optimized and the facets thoroughly tested and validated, the RST production technology will be ready for market replication. The duration of the project will be of 24 months with a total budget of €2,253,190. ver más
30/09/2022
2M€
Duración del proyecto: 36 meses Fecha Inicio: 2019-09-30
Fecha Fin: 2022-09-30

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2022-09-30
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 2M€
Líder del proyecto
THERMAL POWER ENGINEERING -la adquisición, tenencia, enajenación, disfrute explotación y administración de bienes inmuebles, rústicos o urbanos o participaciones o cu...
Perfil tecnológico TRL 4-5 2M