Innovating Works

AeroSolfd

Financiado
Fast track to cleaner, healthier urban Aerosols by market ready Solutions of retrofit Filtration Devices for tailpipe, brake systems and closed environments Emissions of the existing gasoline engines and brakes of the commercial vehicle fleets in Europe relate to health problems and death of annually >1,45 Mio. people. For the next decades, these vehicles will continue populating the... Emissions of the existing gasoline engines and brakes of the commercial vehicle fleets in Europe relate to health problems and death of annually >1,45 Mio. people. For the next decades, these vehicles will continue populating the roads, emitting PM/PN exhaust particles and toxic secondary emissions. For immediate reduction, retrofit solutions for tailpipe and brake emissions must be brought to TRL 8 and introduced to the market by 2025. Timing is crucial: Retrofits are transition technologies until full electrification of Europe’s transport fleet. Even beyond, brake retrofits play an important role in the electrified fleet. Quick wins in the reduction of the overall footprint of the existing fleets can be realised by using our 3 retrofits for tailpipe, brake and closed environments: 95% of PM2.5 and 80% of toxic secondary emissions using an innovative Gasoline Particle Filter, 60% of NOx exhaust emissions replacing the aged TWC by original equipment, 90% of the brake particles of long-lived road transport assets using a passive BDPF, 90% of particles in closed environments (bus stops, tunnels, metro stations) using a special designed and enhanced stationary air purifier. To create credible key messages for clients, citizens and policy, we perform lighthouse demo activities: 1) tailpipe retrofit: 1.000 vehicles in 2 climate zones (Germany + Israel) for 4 representative engine type families, 2) brake retrofit: Define emission fingerprints for the public transport of the cities of Valladolid, Ancona, Fermo and Sofia and > 35000 km lab testing on dynamometer and > 8000 km real driving, 3) air purifier retrofit for closed environments: 3 underground stations (Sofia, 2x Lisbon) with > 130000 commuters and Valladolid central bus depot with > 150 buses. For market preparation we will reach >4.000 citizens and policy makers from EU KOM level and >8 EU countries. We unite world leading industry, renowned scientific institutes and lighthouse demo sites in 8 European countries ver más
30/04/2025
6M€
Duración del proyecto: 36 meses Fecha Inicio: 2022-04-28
Fecha Fin: 2025-04-30

Línea de financiación: concedida

El organismo HORIZON EUROPE notifico la concesión del proyecto el día 2022-04-28
HORIZON EUROPE No se conoce la línea exacta de financiación, pero conocemos el organismo encargado de la revisión del proyecto.
Presupuesto El presupuesto total del proyecto asciende a 6M€
Líder del proyecto
MANN HUMMEL GMBH No se ha especificado una descripción o un objeto social para esta compañía.