In this flagship project, the EnFAIT (Enabling Future Arrays in Tidal) Team, a partnership of leading European companies, will demonstrate a grid-connected tidal energy array that:
- demonstrates a step change in the lifetime co...
ver más
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Proyectos interesantes
OCTARRAY
Scaling up to the Normandie Hydro Open Centre Tidal Turbine...
118M€
Cerrado
FloTEC
Floating Tidal Energy Commercialisation project FloTEC
22M€
Cerrado
OCTTIC
Open Centre Tidal Turbine Industrial Capability
4M€
Cerrado
TIDAL-EC
Tidal Energy Converter Cost Reduction via Power Take Off Opt...
1M€
Cerrado
ENE2013-47296-C2-2-R
INTEGRACION DE ENERGIA EOLICA MARINA EN EL SISTEMA ELECTRICO...
109K€
Cerrado
ENE2013-47296-C2-1-R
INTEGRACION DE ENERGIA EOLICA MARINA EN EL SISTEMA ELECTRICO...
151K€
Cerrado
Información proyecto EnFAIT
Duración del proyecto: 74 meses
Fecha Inicio: 2017-04-04
Fecha Fin: 2023-06-30
Líder del proyecto
NOVA INNOVATION LTD
No se ha especificado una descripción o un objeto social para esta compañía.
TRL
4-5
Presupuesto del proyecto
20M€
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
In this flagship project, the EnFAIT (Enabling Future Arrays in Tidal) Team, a partnership of leading European companies, will demonstrate a grid-connected tidal energy array that:
- demonstrates a step change in the lifetime cost of energy for tidal power;
- proves that high array reliability & availability can be achieved with best practice maintenance regimes;
- captures and disseminates substantial learning on fundamental issues for the ocean energy industry;
- builds investor confidence;
- takes a huge step towards creating a commercial, bankable tidal energy sector; and
- at 6 turbines, will be the largest number of devices ever deployed in an ocean energy array.
This project will build upon an existing operational site, minimising development risk and allowing the generation of real-world results from day one. The technology used in the array has 100% EU content. The layout of the turbines will be adjusted within the project, enabling array interactions and optimisation to be studied for the first time at a real tidal energy site.