Innovating Works

Eco-Solar

Financiado
Eco Solar Factory 40 plus eco efficiency gains in the photovoltaic value chain...
Eco Solar Factory 40 plus eco efficiency gains in the photovoltaic value chain with minimised resource and energy consumption by closed loop systems EcoSolar envisions an integrated value chain to manufacture and implement solar panels in the most ecologic way by maximising resource efficiency, taking into account reuse of materials during production and repurposing solar pane... EcoSolar envisions an integrated value chain to manufacture and implement solar panels in the most ecologic way by maximising resource efficiency, taking into account reuse of materials during production and repurposing solar panel components at end of life stage. EcoSolar will demonstrate that during the lifetime of a solar electricity producing field, individual panels can be monitored, allowing to identify defaulting panels at an early stage, replacing or repairing them and thus to increase the overall energy yield. In WP1, SINTEF&Norsun will work on recovery & reuse during silicon ingot crystallisation, addressing recovery of argon purge gas and work with Steuler on reusable crucibles. In WP2 Garbo will recover Si-kerf-loss during wafering, and with SINTEF work on potential reuse applications, like as Si-feedstock in crystallisation processes, or as resource in crucible manufacturing or lithium ion battery production. In WP3, ISC&SoliTek will look into potential for re-using process water; reducing material resources, like chemicals and silver, by smarter solar cell design, more efficient processes and recovery and reuse of chemicals; AIMEN will develop solar cell monitoring and repair for inline processing in an industrial plant, to enable remanufacturing. In WP4 Apollon will use a module design that results in reduced bill of materials, enables remanufacturing and reuse of components from modules that showed failures after assembly or have been identified as malfunctioning in operating PV installations, based on integrated diagnosis techniques for the detection of failure modes. bifa will collect data from all previous WPs to assess environmental impact of the intended innovations (WP5). Bifa will identify waste streams that are costly and hard to recycle and find opportunities to repurpose those waste products. BCC will disseminate the results and will support the partners with the exploitation and replication potential of the results (WP6). ver más
30/09/2018
6M€
Duración del proyecto: 38 meses Fecha Inicio: 2015-07-20
Fecha Fin: 2018-09-30

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2018-09-30
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 6M€
Líder del proyecto
SINTEF AS No se ha especificado una descripción o un objeto social para esta compañía.