DIgitalization of ground testing Life cycle with ECO design criteria
DIgitalization of LIfe cycle ground testing with ECO design criteria. DILECO will contribute, from the scope of a Ground System Tests Station of a FAL, to the huge effort to maintain leadership in aviation industry while trying t...
ver más
31/10/2020
SKYLIFE ENGINEERIN...
400K€
Presupuesto del proyecto: 400K€
Líder del proyecto
SKYLIFE ENGINEERING
Investigación y desarrollo de nuevas tecnologías y modernas herramientas de diseño software para desarrollar o mejorar los sistemas de avión...
TRL
4-5
| 2M€
Fecha límite participación
Sin fecha límite de participación.
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Información proyecto DILECO
Duración del proyecto: 32 meses
Fecha Inicio: 2018-02-16
Fecha Fin: 2020-10-31
Líder del proyecto
SKYLIFE ENGINEERING
Investigación y desarrollo de nuevas tecnologías y modernas herramientas de diseño software para desarrollar o mejorar los sistemas de avión...
TRL
4-5
| 2M€
Presupuesto del proyecto
400K€
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
DIgitalization of LIfe cycle ground testing with ECO design criteria. DILECO will contribute, from the scope of a Ground System Tests Station of a FAL, to the huge effort to maintain leadership in aviation industry while trying to adapt to new trends related to sustainability in global markets, by means of an eco-efficient production and digitalization of the factory.
Many processes in the Ground System Tests (GST) Station of the Final Assembly Line (FAL) of an aircraft, present a relatively low grade of automatization, with a lot of room for improvement when it comes to digitalization and product PLM integration. The introduction of some of the aforementioned technologies in the modern FAL can definitely impact the factory’s lean manufacturing and the environmental sustainability of the whole process. Implantation of new assembly procedures can take advantage of commercially available technology, but also actual methods and procedures like the moving assembly line, visual control systems, point-of-use staging, just-in-time delivery systems, etc. can be significantly improved.
The General Objective of this proposal is the Development and deployment of PLM Tools for A/C Ground Functional testing with Eco-design criteria in order to improve the sustainability of the FAL and the efficiency of the Ground System Tests process end to end. All the works will be done on site, in close contact with the Topic Manager, with as many revision cycles as possible before a final release.