CRItical raw maTERIAl treatment and recovery from mining tailings and waste dump...
The characterization and cultivation of tailing dams and waste dumps for the treatment and subsequent recovery of critical raw materials is an actual priority concerning Eu member States.This activity is both linked to the purp... The characterization and cultivation of tailing dams and waste dumps for the treatment and subsequent recovery of critical raw materials is an actual priority concerning Eu member States.This activity is both linked to the purpose of the remediation of old mining sites for a new employment of the area and the soil reuse and to actually developing mining activities.In this perspective the geophysical charaterization of tailing dams in order to organize the subsequent excavation and treatment activities is fundamental together with the social acceptance and the environmental impact evaluation of all the process.According to the different kind of excavated materials and the related content of critical raw materials physical and chemical treatments may be proposed such as: sieving, magnetic and electric separation, fluid media separation, chemical and/or biological leaching, crystallization and precipitation, solvent extraction, membrane-based processes or the integration of those. All the performed operations must be evaluated according to environmental and economic aspects. ver más
31/10/2028
Presupuesto desconocido
Duración del proyecto: 47 meses Fecha Inicio: 2024-11-01
Fecha Fin: 2028-10-31

Línea de financiación: concedida

El organismo HORIZON EUROPE notifico la concesión del proyecto el día 2024-11-01
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Líder del proyecto
POLITECNICO DI TORINO No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5