Innovating Works

RED-Heat-to-Power

Financiado
Conversion of Low Grade Heat to Power through closed loop Reverse Electro Dialys...
The concept is based on the generation of electricity from salinity gradient using Reverse Electrodialysis with artificial saline solutions operating in a closed-loop. The original salinity gradient is regenerated by a separation... The concept is based on the generation of electricity from salinity gradient using Reverse Electrodialysis with artificial saline solutions operating in a closed-loop. The original salinity gradient is regenerated by a separation step that uses heat at 40 - 100 C. The regenerated solutions can be stored at very low costs and the stack can react within seconds, providing flexibility to the power system. It is a quiet technology operating under normal pressures and temperatures imposing no risks. The industrial partners ensures the MRL will be kept aligned with the advances in TRL. The overall objective is to prove this revolutionary concept, develop the necessary materials, components and know-how for bringing it to the level of a lab prototype generating electricity from low-grade heat at higher efficiencies and lower costs than ever achieved to date. Specific objectives: Select the most suitable technologies for the regeneration process and the combinations of salts and solvents that can maximise the system performance. Create new knowledge for developing: membranes for the selected solutions; membrane manufacturing concepts that can be scaled-up for high volume and low-cost production; efficient stacks suitable for this application; energy efficient regeneration processes. Implement and validate a process simulation tool to analyse the performance under different configurations and operating conditions. Evaluate and improve the performance of the overall system through tests on a lab-prototype, identifying potential up-scaling and operational issues (System efficiencies reaching 15% and power densities of 25 W/m2 of cell pair). Define a development roadmap, taking into account environmental, social and regulatory issues, leading to levelised cost of electricity below 0.03 Euro/kWh by 2025 to 2030. Involve target group representatives to the Advisory Board and communicate the key results in order to initiate a dialogue and facilitate the engagement of key actors. ver más
30/04/2019
WIP
4M€
Duración del proyecto: 48 meses Fecha Inicio: 2015-04-01
Fecha Fin: 2019-04-30

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2019-04-30
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 4M€
Líder del proyecto
WIRTSCHAFT UND INFRASTRUKTUR GMBH CO PLANUNG... No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5