Compressed Heat Energy Storage for Energy from Renewable sources
The main objective of the CHESTER project is the development and validation of an innovative system that allows for energy management, storage and dispatchable supply of many different RES by combining the electricity sector with... The main objective of the CHESTER project is the development and validation of an innovative system that allows for energy management, storage and dispatchable supply of many different RES by combining the electricity sector with the heat sector. This is done by combining an innovative power-to-heat-to-power energy storage system, the so called CHEST (Compressed Heat Energy Storage) system with Smart District Heating thus leading to a very flexible and smart renewable energy management system that is able to store electric energy with a round trip efficiency of 100% or even higher, site-independent unlike pumped hydro, cyclically stable unlike batteries, able to convert power into heat, able to convert renewable low temperature heat into power, able to store and deliver independently from each other upon request both, heat and power, cost competitive. CHEST is based on existing technology (heat pump, thermal storage and ORC) but ground breaking advancements are necessary to ensure a high-efficient and cost-competitive CHEST system. A smart system control strategy will be developed, including the implementation of forecasting models, that allows the system to use the energy in the most cost efficient, technically appropriate and flexible way. It will consider the interaction with the electric grid (supply and demand side), the interaction with the district heating network and the integration of other heat sources. A complete 10 kWel laboratory CHEST system will be built and validated in a relevant environment. Overall TRL will be increased from 3 to 5. All relevant exploitation and dissemination issues will be covered. The CHEST system, a promising energy storage and management system, will be key towards the achievement of energy objectives and mitigating the energy challenges of the future energy system. Large scale plants (multi-MW range) at cost- competitive costs (130€/kWh) could reach the market by 2025. ver más
31/03/2023
5M€
Duración del proyecto: 61 meses Fecha Inicio: 2018-02-26
Fecha Fin: 2023-03-31

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2023-03-31
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 5M€
Líder del proyecto
FUNDACION TECNALIA RESEARCH & INNOVATION Promoción, el desarrollo y el fomento de actividades de investigación, desarrollo e innovación
Perfil tecnológico TRL 2-3 123M