CO2 Mineralisation: Conversion of Waste to New Building Materials
The goal of MIN CO2 is to test the innovation and commercialisation potential of an idea for: i) increasing sustainability, ii) decreasing atmospheric CO2 and iii) producing a valuable, low CO2 footprint building material from non...
ver más
¿Tienes un proyecto y buscas un partner? Gracias a nuestro motor inteligente podemos recomendarte los mejores socios y ponerte en contacto con ellos. Te lo explicamos en este video
Proyectos interesantes
Carbon8
Capturing and adding value to CO2 hazardous waste to produ...
71K€
Cerrado
Carbon4Minerals
Transforming CO2 into added-value construction products
20M€
Cerrado
PID2021-122390OB-C21
CIRCULARIDAD Y DESCARBONIZACION DEL CEMENTO Y PRODUCTOS DERI...
194K€
Cerrado
MISSION-CCS
Material Science Innovation for Accelerated, Sustainable and...
Cerrado
CO2Slag Cement
Co-utilizing CO2 and metallurgical wastes for carbon-negativ...
269K€
Cerrado
BES-2016-078468
ALTERACION Y CARBONATACION DE SILICATOS DE CALCIO Y MAGNESIO...
93K€
Cerrado
Información proyecto MIN CO2
Duración del proyecto: 17 meses
Fecha Inicio: 2024-09-01
Fecha Fin: 2026-02-28
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
The goal of MIN CO2 is to test the innovation and commercialisation potential of an idea for: i) increasing sustainability, ii) decreasing atmospheric CO2 and iii) producing a valuable, low CO2 footprint building material from noncombustible solid waste. Results from our ERC research led to the idea: Can we react waste materials with CO2 and water to produce fine grained material of value for new concrete? Current solutions for CCS are expensive and require extensive infrastructure but if this idea works, the technology will generate income; our estimates suggest ~ 50 €/T from the sale of the end product. In MIN CO2, we shall test the idea and optimise the system parameters at bench scale, then design, build and test a laboratory prototype reactor, where rate of reaction and formation of a minimum viable product can be achieved in a flowthrough process, bringing us from our current TRL 2 to TRL 4. One patent has been submitted; others will follow as appropriate. Our preliminary market analysis and business case, as well as discussions with potential partners (waste suppliers, a local waste-to-energy plant and a concrete company), bode well for writing a proposal for Innovation Funding at the end of the POC grant. Larger company stakeholders promise investment when we are able to demonstrate viability in a factory pilot (TRL 6). Our long term goal is a startup, that sells CO2 Traps and knowhow for installation into existing factory chimneys, for European and eventually global markets. Initial discussions with members of the public and the media range from positive to enthusiastic because most of society’s fears about CCS are avoided with our approach. As our prospective partner from the concrete industry summarised, “If this works, it will be big”. Our small, dedicated team is convinced that it will.