The REFHYNE project will install and operate a 10MW electrolyser from ITM Power at a large refinery in Rhineland, Germany, which is operated by Shell Deutschland Oils. The electrolyser will provide bulk quantities of hydrogen to... The REFHYNE project will install and operate a 10MW electrolyser from ITM Power at a large refinery in Rhineland, Germany, which is operated by Shell Deutschland Oils. The electrolyser will provide bulk quantities of hydrogen to the refinery’s hydrogen pipeline system (currently supplied by two steam methane reformers). The electrolyser will be operated in a highly responsive mode, helping to balance the refinery’s internal electricity grid and also selling Primary Control Reserve service to the German Transmission System Operators. The combination of hydrogen sales to the refinery and balancing payments create a business case which justifies this installation. This business case will be evaluated in detail, in a 2 year campaign of techno-economic and environmental analysis. The REFHYNE business model is replicable in markets with a similar regulatory structure to Germany. However, to expand this market to a GW scale, new business models will be needed. These will include valuing green hydrogen as an input to industrial processes (to meet carbon policy targets) and also on sales to H2 mobility markets. The REFHYNE project will gather real world data on these models and will use this to simulate the bulk electrolyser model in a range of market conditions. This will be used to produce reports on the conditions under which the electrolyser business models become viable, in order to provide the evidence base required to justify changes in existing policies. A campaign of targeted dissemination will ensure the results of these studies reach decision makers in large industrial sites, financiers, utilities and policy makers. The REFHYNE electrolyser will be the largest in the world and has been designed as the building block for future electrolysers up to 100MW and beyond. REFHYNE includes a design study into the options for a 100MW electrolyser at the Rhineland refinery, which will help prepare the market for deployments at this scale. ver más
30/06/2024
20M€
Duración del proyecto: 78 meses Fecha Inicio: 2017-12-12
Fecha Fin: 2024-06-30

Línea de financiación: concedida

El organismo H2020 notifico la concesión del proyecto el día 2024-06-30
Línea de financiación objetivo El proyecto se financió a través de la siguiente ayuda:
Presupuesto El presupuesto total del proyecto asciende a 20M€
Líder del proyecto
SINTEF AS No se ha especificado una descripción o un objeto social para esta compañía.