Información proyecto CEFOW
Duración del proyecto: 60 meses
Fecha Inicio: 2015-05-04
Fecha Fin: 2020-05-31
Líder del proyecto
FORTUM OYJ
No se ha especificado una descripción o un objeto social para esta compañía.
TRL
4-5
Presupuesto del proyecto
25M€
Fecha límite de participación
Sin fecha límite de participación.
Descripción del proyecto
The most advanced wave power demonstrations today have showed the feasibility of power generation with single device deployments and MW-scale performance within several testing periods of several years. The next step beyond this is to deploy multiple wave energy converters in MW-scale with improved power generation capability and demonstrate that they are able to survive rough sea conditions over a period of several years. Clean Energy From Ocean Waves (CEFOW) project has an exceptionally good starting point. It has an existing site reservation in a wave power testing centre called Wave Hub, with all the needed infrastructure, including grid connection already in place. In addition, the wave energy converter technology to be deployed in the project has already been tested and proven in real conditions in Scotland.
The ultimate purpose of the CEFOW is to increase the speed of wave power development, decrease the levelised cost of ocean energy by improving technical solutions used for multiple device system, and create an efficient supply chain to support larger wave power projects in the future. To reach these targets, the CEFOW consortium will improve the wave energy converter performance by 50% and raise its availability to 70%; develop new types of dynamic mooring and electrical connections suitable for multi-device deployment and deploy 3MW (three 1MW units) wave energy converters in real world offshore conditions in a grid-connected testing environment. In addition, CEFOW will study the feasibility of on-board and on-shore storage solutions and conduct thorough multi-year environmental, health and safety studies.
The consortium spans the full value chain from research organisations to wave converter technology developers, marine service providers and a large multinational utility company as the operator.