BIOROBUR

Financiado
Biogas robust processing with combined catalytic reformer and trap
In the BioROBUR project a robust and efficient fuel processor for the direct reforming of biogas will be developed and tested at a scale equivalent to 50 Nm3/h production of PEM-grade hydrogen to demonstrate the achievement of all... In the BioROBUR project a robust and efficient fuel processor for the direct reforming of biogas will be developed and tested at a scale equivalent to 50 Nm3/h production of PEM-grade hydrogen to demonstrate the achievement of all the call mandates. The system energy efficiency of biogas conversion into hydrogen will be 65%, for a reference biogas composition of 60%vol CH4 and 40%vol CO2.Key innovations of the BioROBUR approach are:- The choice of an autothermal reforming route, based on easily-recoverable noble-metal catalysts supported on high-heat-conductivity cellular materials, which shows intrinsic advantages compared to steam reforming: catalysts less prone to coking, easier adaptability to biogas changing composition, more compact design, efficient handling of heat, lower materials costs, fast start-up/shut-down, easier process control, etc.- The adoption of a multifunctional catalytic wall-flow trap based on transition metal catalysts, close coupled to the ATR reformer, which could entail effective filtration and conversion of soot particles eventually generated in the inlet part of the reformer during steady or transient operation, the decomposition of traces of incomplete reforming products (i.e. aldehydes, ethylene,…), the promotion of the WGS reaction to a significant extent so as to lower the size of the WGS unit, etc.- The adoption of a coke growth control strategy based on periodic pulses of air/steam or on momentary depletion of the biogas feed so as to create adequate conditions in the ATR reactor for an on-stream regeneration of the catalysts, thereby prolonging the operating lifetime of the catalysts with no need of reactor shut-down.Under the experienced coordination of Prof. Debora Fino, the project will integrate, in an industrially oriented exploitation perspective, the contribution of 9 partners (3 universities, 2 research centres, 3 SMEs and 1 large company from 7 different European Countries) with complementary expertise. ver más
31/08/2016
4M€
Perfil tecnológico estimado
Duración del proyecto: 39 meses Fecha Inicio: 2013-05-01
Fecha Fin: 2016-08-31

Línea de financiación: concedida

El organismo FP6 notifico la concesión del proyecto el día 2016-08-31
Presupuesto El presupuesto total del proyecto asciende a 4M€
Líder del proyecto
POLITECNICO DI TORINO No se ha especificado una descripción o un objeto social para esta compañía.
Perfil tecnológico TRL 4-5